Florida / Clay County

Solar Permit in Clay County, Florida

Not confirmed

We could not confirm this

Quick answer

Clay County's Building Division page, its Frequently Asked Questions page, the Permit Applications How-To Guides list, Contractor Services page, the Affidavits/Forms page, and the FY24/25 Building Fee Schedule contain no mention of solar or photovoltaic permits, so unincorporated Clay County's requirement or process for residential solar installations could not be verified from an official source.

Issued by
Clay County Building Division
Not confirmed Checked

Applying yourself? Start with the office.

What a solar permit costs in Clay County

Permit fee
Not published
Fee schedule in force
Official scheduleRead .

Clay County publishes no fee for this permit type in a schedule we can verify. Ask Clay County Building Division how the fee is calculated for your project.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Clay County compares in Florida

No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Alachua CountyPermit requiredNo solar-specific flat fee is published
Brevard CountyPermit requiredSee schedule
Charlotte CountyPermit requiredAt application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation is $50,000 or more) and a 0.025 x building-fee surcharge
Clay Countythis pageNot confirmedNot published
Collier CountyPermit requiredSee schedule
Hernando CountyPermit requiredPhotovoltaic System (Res): $180.00
Hillsborough CountyPermit requiredResidential Photovoltaic trade permit fee is $250 flat, inspection-only with no plan review; the schedule has the rest

Where to ask in Clay County

We could not confirm the rule, so start with the office's own pages or call the number below.

Clay County Building Division

  • 435 Walburg Street, Green Cove Springs, FL 32043 (mailing address: PO Box 1366, Green Cove Springs, FL 32043)
  • Phone: (904) 284-6307 or (904) 269-6307
  • Email: permits@claycountygov.com

Permitting activity in Clay County

In 2025, Clay County authorized permits for 1,522 new residential housing units (1,240 single-family, 282 in multi-family buildings), valued at $404M, down from 1,880 the year before. That works out to about 6.4 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 239,593.

What else needs a permit in Clay County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredan elevated deck, as distinct from other deck workDeck work falls under the Building Permits minimum, 'Minimum Fee for Any Building Permit (including amendments)', of $100.00
Electrical PermitPermit requiredAny sizeNew residential construction: minimum fee $50.00, and $80.00 for 0 - 200 ampere service up to $150.00 for 400 ampere service
Fence PermitIt dependsvalue of repair or replacement work to existing wood fence pickets or panels, not including fence postsFence work falls under the Building Permits minimum, 'Minimum Fee for Any Building Permit (including amendments)', of $100.00
HVAC PermitPermit requiredAny sizeMechanical Permits (commercial and residential): minimum fee $50.00
Plumbing PermitPermit requiredAny sizeResidential plumbing: minimum fee $50.00
Pool PermitPermit requiredAny sizePool Permits: Minimum Fee for first 15,000 gallons $75.00, plus $5.00 for each additional 1,000 gallons
Roof Replacement PermitPermit requiredAny sizeRoofing: $10.00 per 100 square feet
Shed PermitPermit requiredAny sizeNew Accessory Buildings (barns, carports, garages, screen porches, and sheds): $10.00 per 100 square feet; the schedule has the rest

Frequently asked questions

Do you need a solar permit in Clay County?
We could not confirm the solar permit rule on an official Clay County page, so this page gives no yes or no. Call the Clay County Building Division at (904) 284-6307 or (904) 269-6307 before you start.
How much does a solar permit cost in Clay County?
We found no published fee for a solar permit in Clay County. To learn how it is calculated for your project, call the Clay County Building Division at (904) 284-6307 or (904) 269-6307.
Where do you apply for a solar permit in Clay County?
You can apply through the Clay County permit portal or contact the Clay County Building Division directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Clay County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Clay County applies this before you apply.

From the Library

Solar Permit in other Florida localities

Everything above, sourced

What was checked for this solar permit page for Clay County. The rule itself is not confirmed. 1 official source: claycountygov.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Clay County Building Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Not confirmed
Check my project