Quick answer
Clay County's Building Division page, its Frequently Asked Questions page, the Permit Applications How-To Guides list, Contractor Services page, the Affidavits/Forms page, and the FY24/25 Building Fee Schedule contain no mention of solar or photovoltaic permits, so unincorporated Clay County's requirement or process for residential solar installations could not be verified from an official source.
- Issued by
- Clay County Building Division
Applying yourself? Start with the office.
What a solar permit costs in Clay County
- Permit fee
- Not published
- Fee schedule in force
- Official scheduleRead .
Clay County publishes no fee for this permit type in a schedule we can verify. Ask Clay County Building Division how the fee is calculated for your project.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Clay County compares in Florida
No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Alachua County | Permit required | No solar-specific flat fee is published |
| Brevard County | Permit required | See schedule |
| Charlotte County | Permit required | At application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation is $50,000 or more) and a 0.025 x building-fee surcharge |
| Clay Countythis page | Not confirmed | Not published |
| Collier County | Permit required | See schedule |
| Hernando County | Permit required | Photovoltaic System (Res): $180.00 |
| Hillsborough County | Permit required | Residential Photovoltaic trade permit fee is $250 flat, inspection-only with no plan review; the schedule has the rest |
Where to ask in Clay County
We could not confirm the rule, so start with the office's own pages or call the number below.
Clay County Building Division
- 435 Walburg Street, Green Cove Springs, FL 32043 (mailing address: PO Box 1366, Green Cove Springs, FL 32043)
- Phone: (904) 284-6307 or (904) 269-6307
- Email: permits@claycountygov.com
Permitting activity in Clay County
In 2025, Clay County authorized permits for 1,522 new residential housing units (1,240 single-family, 282 in multi-family buildings), valued at $404M, down from 1,880 the year before. That works out to about 6.4 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 239,593.
What else needs a permit in Clay County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | an elevated deck, as distinct from other deck work | Deck work falls under the Building Permits minimum, 'Minimum Fee for Any Building Permit (including amendments)', of $100.00 |
| Electrical Permit | Permit required | Any size | New residential construction: minimum fee $50.00, and $80.00 for 0 - 200 ampere service up to $150.00 for 400 ampere service |
| Fence Permit | It depends | value of repair or replacement work to existing wood fence pickets or panels, not including fence posts | Fence work falls under the Building Permits minimum, 'Minimum Fee for Any Building Permit (including amendments)', of $100.00 |
| HVAC Permit | Permit required | Any size | Mechanical Permits (commercial and residential): minimum fee $50.00 |
| Plumbing Permit | Permit required | Any size | Residential plumbing: minimum fee $50.00 |
| Pool Permit | Permit required | Any size | Pool Permits: Minimum Fee for first 15,000 gallons $75.00, plus $5.00 for each additional 1,000 gallons |
| Roof Replacement Permit | Permit required | Any size | Roofing: $10.00 per 100 square feet |
| Shed Permit | Permit required | Any size | New Accessory Buildings (barns, carports, garages, screen porches, and sheds): $10.00 per 100 square feet; the schedule has the rest |
Frequently asked questions
- Do you need a solar permit in Clay County?
- We could not confirm the solar permit rule on an official Clay County page, so this page gives no yes or no. Call the Clay County Building Division at (904) 284-6307 or (904) 269-6307 before you start.
- How much does a solar permit cost in Clay County?
- We found no published fee for a solar permit in Clay County. To learn how it is calculated for your project, call the Clay County Building Division at (904) 284-6307 or (904) 269-6307.
- Where do you apply for a solar permit in Clay County?
- You can apply through the Clay County permit portal or contact the Clay County Building Division directly. The links are listed on this page.
- Can a homeowner pull a solar permit themselves in Clay County?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Clay County applies this before you apply.
From the Library
Solar Permit in other Florida localities
Everything above, sourced
What was checked for this solar permit page for Clay County. The rule itself is not confirmed. 1 official source: claycountygov.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Clay County Building Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page