Building permits in Clay County, Florida
Of the 8 common home projects we have verified in Clay County, 7 need a permit outright and 1 depends on size or scope. Click any project for the full rule, fee, and how to apply.
- Project types verified
- 8of 10 we cover in Clay County
Clay County Building Division
- 435 Walburg Street, Green Cove Springs, FL 32043 (mailing address: PO Box 1366, Green Cove Springs, FL 32043)
- Phone: (904) 284-6307 or (904) 269-6307
- Email: permits@claycountygov.com
- Official permit page
- Permit portal
- Official fee schedule
Look up a permit in Clay County
Clay County permit records are public, and you can check a property's permit history by address or permit number online.
What needs a permit in Clay County
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | an elevated deck, as distinct from other deck work | Deck work falls under the Building Permits minimum, 'Minimum Fee for Any Building Permit (including amendments)', of $100.00 |
| Electrical Permit | Permit required | Any size | New residential construction: minimum fee $50.00, and $80.00 for 0 - 200 ampere service up to $150.00 for 400 ampere service |
| Fence Permit | It depends | value of repair or replacement work to existing wood fence pickets or panels, not including fence posts | Fence work falls under the Building Permits minimum, 'Minimum Fee for Any Building Permit (including amendments)', of $100.00 |
| HVAC Permit | Permit required | Any size | Mechanical Permits (commercial and residential): minimum fee $50.00 |
| Patio Permit | Not confirmed | Not confirmed | Not published |
| Plumbing Permit | Permit required | Any size | Residential plumbing: minimum fee $50.00 |
| Pool Permit | Permit required | Any size | Pool Permits: Minimum Fee for first 15,000 gallons $75.00, plus $5.00 for each additional 1,000 gallons |
| Roof Replacement Permit | Permit required | Any size | Roofing: $10.00 per 100 square feet |
| Shed Permit | Permit required | Any size | New Accessory Buildings (barns, carports, garages, screen porches, and sheds): $10.00 per 100 square feet; the schedule has the rest |
| Solar Permit | Not confirmed | Not confirmed | Not published |
Planning a project in Clay County?
Hire it out
Sponsored
Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.
Compare local contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
Planning several things at once? Check your whole project
Schedule an inspection in Clay County
Permitted work is not finished until it passes inspection. Inspections are scheduled online through the same CAP/CSS portal used for permits. On the day of an inspection, calling (904) 269-6307 between 7:45 and 8:30 a.m. connects the caller with their inspector; the Inspections page also publishes each named building inspector's direct cell number.
Schedule or request a Clay County inspection
When the portal will not take the date you need, the office still books by phone: (904) 284-6307 or (904) 269-6307.
Checked . If the office has changed its process, report it.
Clay County permit fees compared with nearby Florida localities
| Florida locality | Deck Permit | HVAC Permit | Electrical Permit |
|---|---|---|---|
| Clay County | Deck work falls under the Building Permits minimum, 'Minimum Fee for Any Building Permit (including amendments)', of $100.00 | Mechanical Permits (commercial and residential): minimum fee $50.00 | New residential construction: minimum fee $50.00, and $80.00 for 0 - 200 ampere service up to $150.00 for 400 ampere service |
| Alachua County | No deck-specific flat fee is published | Flat fee: Res Mechanical Alt/Repair $110.00, per the Building Fee Schedule effective 11/01/2025 | No electrical-specific flat fee is published |
| Brevard County | Not published | See schedule | See schedule |
| Broward County | See schedule | See schedule | Electrical permit is the greater of a $125 minimum base fee or 3.0% of job value; the schedule has the rest |
Each cell is taken from that Florida jurisdiction's own fee schedule; the full wording and source sit on each permit page.
Clay County permit questions, answered from the data
- Do you need a permit in Clay County?
- For most projects, yes. Of the 10 permit types we cover in Clay County, 7 always require a permit (for example a deck permit) and 1 depends on size or scope (a fence permit, for instance), and 2 are not confirmed. Each Clay County permit type's page states the exact rule and its source.
- How much does a permit cost in Clay County?
- Clay County publishes a fee for 8 of the 10 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by Clay County Building Division; we do not estimate or mark them up.
- Where do you apply for a permit in Clay County?
- Clay County Building Division issues permits in Clay County and has an online permit portal, and takes questions at (904) 284-6307 or (904) 269-6307. The Clay County official page and portal are linked in the office section above.
How the Clay County pages were verified. 10 permit types, 3 distinct official sources, most recently checked . Every rule is read from Clay County Building Division or the applicable code and cited on its page; anything we could not confirm for Clay County is marked rather than estimated. How we verify.
Permitting activity in Clay County
In 2025, Clay County authorized permits for 1,522 new residential housing units (1,240 single-family, 282 in multi-family buildings), valued at $404M , down from 1,880 the year before. That works out to about 6.4 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 239,593.