Florida

Building permits in Escambia County, Florida

Verified against official sources

Of the 10 common home projects we have verified in Escambia County, 7 need a permit outright and 2 depend on size or scope. Click any project for the full rule, fee, and how to apply.

Project types verified
10in Escambia County

One thing Escambia County does not make you permit

Worth knowing before you call anyone. Most jurisdictions we cover require all of these.

  • Fence Permit

    Before installing any fence in unincorporated Escambia County or the Town of Century, obtain a Land Use Certificate from Development Services; no Building Services permit is required

Look up a permit in Escambia County

Escambia County permit records are public, and you can check a property's permit history by permit number online.

How to search Escambia County permit records

How to get a building permit in Escambia County

Escambia County Building Services issues building permits, reviews plans and inspects work in the unincorporated county and the Town of Century. Inside the Pensacola city limits, permits come from City of Pensacola Inspection Services, 222 W. Main St., (850) 436-5600; the county’s application forms have a box for each. You file a completed, notarized application with Building Services, then follow the permit and book inspections in MyGovernmentOnline (MGO).

Where the office is and when it is open

Building Services is at 3363 West Park Place, Pensacola, FL 32505, phone 850-595-3550; the North Office in Cantonment answers at 850-587-5770. Email permits@myescambia.com (applications) or buildinginspections@myescambia.com (inspections). Phone the main office for counter hours; none are posted on the Building Services pages.

Applying online in Escambia County

Building Services’ pages describe a paper application, with MGO used to follow the permit:

  1. Check your zoning, future land use and flood zone with Development Services first (850-595-3475, zoninginfo@myescambia.com), and get your parcel number from the Property Appraiser at escpa.org.
  2. On Pensacola Beach (SRIA) or in the Town of Century, get that approval before you apply and bring it with you.
  3. Download your trade’s application from Building Services Forms. It needs the contractor’s notarized signature (staff notarize when a technician is available), and no permit number is assigned until it is complete.
  4. Submit it. The main page offers permits@myescambia.com for emailed applications, but the Plan Review page says forms must be printed and hand-delivered, mailed or faxed and that email forms are currently unacceptable. Ask at 850-595-3550 which your form takes.
  5. New construction, additions and renovations need two copies of a plot plan and two complete sets of plans with the wind-load design method; a plans intake specialist goes through the sufficiency checklist with you.
  6. Once fees are paid, the contractor picks up the approved plans and permit.

An owner-builder must own the home for their own use, not for sale or lease, and turn in a Homeowner Affidavit when permitting.

What five common projects cost here

The county code says permit fees follow a schedule set by the Board of County Commissioners, but Building Services does not post the amounts. To get a number, complete the fee estimate form for each trade (a separate form is required for each) and fax it: the forms say (850) 595-3589, the Plan Review page 850-595-3403. The estimate covers only Building Inspections fees, not another agency’s, and the final cost is set at the end of the application process.

  • Shed: a building permit at any size when the shed has a poured slab or posts set in the earth; no published fee. Use the Building Permit Fee Estimate. Read 18 Nov 2026.
  • Fence: no building permit, but a Land Use Certificate for Fence Installation from Development Services. The form prints a $50 fee that includes a $5 technical fee; the October 2021 Planning & Zoning Fee Schedule lists $45.00 plus a $5 technology fee per land use permit, and adds a 3% surcharge on all credit card payments. Read 18 Nov 2026.
  • Roof replacement: a Re-Roofing Permit for re-roofs greater than 2 squares; no published fee. The building estimate form asks for your squares of shingles. Read 18 Nov 2026.
  • Plumbing: required to relocate a fixture, swap a tub for a shower or replace any water heater; no published fee. The plumbing estimate form prices by fixture count. Read 18 Nov 2026.
  • Pool: a Swimming Pool Permit for in-ground vinyl or concrete pools; no published fee. Read 18 Nov 2026.

How long review takes

Escambia’s building pages put no number of days on review. What they do promise is that plans intake specialists check every document is included so plans can be reviewed in a timely manner; after that, follow your permit’s status in MGO’s Citizen Access.

Inspections, in order

Book in MGO until 6 a.m. for a same-day inspection, or by phone through the IVR, 850-273-4864, by 4:30 a.m. The recorded Notice of Commencement (required at $5,000 or more, or $15,000 and above for an HVAC changeout) must be submitted before any inspection and posted on the job site.

For new construction in a special flood hazard area, the Under Construction Elevation Certificate is due before the framing inspection and the Finished Construction Elevation Certificate before the final. Power is not released, in most cases, until every required inspection has passed and all fees are paid, and the Certificate of Occupancy or Completion waits on any unpaid re-inspection fees. A permit stays valid six months from issuance or from the last approved inspection.

Why applications get sent back

  • No notarized contractor signature, so no permit number.
  • A valuation the building official thinks is low: county code says the permit is denied unless you show detailed estimates.
  • Missing items from the sufficiency checklist: the recorded Notice of Commencement, a sewer tap receipt or septic letter, SRIA approval stamps on Pensacola Beach, a benchmark survey outside an X zone, or the specific Florida Product Approval numbers.

What needs no permit in Escambia County

  • A portable, skid-mounted utility shed of less than 120 square feet.
  • Painting, wallpapering, carpeting and kitchen cabinets.
  • Roof repair of less than two squares.
  • A fence (it needs the Land Use Certificate above) and a new or extended driveway (it needs a Right-of-Way Utilization Permit from Public Works).

Height limits, setbacks and sight distance standards still apply with no permit.

If the work already started

County code (Sec. 14-166) adds a fee set by the building official, on top of the permit fees, for work begun without a permit. The one exception is emergency work, where delay would have put life or property in imminent danger, and even then the permit must be applied for within five business days or the fee doubles. The building official may waive fees or grant more time when justifiable cause is shown in writing. Call Building Services at 850-595-3550 and file the application now. What Florida law says about building without a permit.

Checklist before you apply

  1. Zoning, land use and flood zone confirmed with Development Services.
  2. Parcel number from escpa.org.
  3. SRIA or Town of Century approval, if it applies.
  4. The trade’s application with the contractor’s notarized signature, or a Homeowner Affidavit.
  5. Two plot plans and two sets of plans for new work, additions and renovations.
  6. A fee estimate form per trade, faxed ahead.
  7. A recorded Notice of Commencement at $5,000 or more.
  8. An MGO login to book inspections.

Escambia County documents read for this guide

What needs a permit in Escambia County

ProjectPermit needed?Threshold
Deck PermitPermit requiredAny size
Electrical PermitPermit requiredAny size
Fence PermitNo permit neededExempt
HVAC PermitPermit requiredAny size
Patio PermitPermit requiredAny size
Plumbing PermitPermit requiredAny size
Pool PermitPermit requiredAny size
Roof Replacement PermitIt dependsA Re-Roofing Permit is required for re-roofs exceeding 2 squares (1 square equals 100 square feet, so 2 squares equals 200 square feet); roof repair work under two squares does not require a permit.
Shed PermitIt dependsA portable, skid-mounted utility shed under 120 square feet does not require a permit; any utility shed with a poured slab or a post installed into the earth requires a permit regardless of size.
Solar PermitPermit requiredAny size

Planning a project in Escambia County?

Hire it out

Sponsored

Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.

Compare local contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

Planning several things at once? Check your whole project

Schedule an inspection in Escambia County

Permitted work is not finished until it passes inspection. Inspections can be scheduled online through MyGovernmentOnline until 6 a.m. for same-day service, or by calling the Interactive Voice Response (IVR) line at 850-273-4864 (same-day inspections must be called in by 4:30 a.m.). Inspections entered are sent in real time to the inspector's wireless field computer.

Schedule or request a Escambia County inspection

When the portal will not take the date you need, the office still books by phone: (850) 595-3550.

Checked . If the office has changed its process, report it.

Escambia County permit fees compared with nearby Florida localities

Florida locality Deck PermitHVAC PermitElectrical Permit
Escambia County Not published Not published Not published
Alachua County No deck-specific flat fee is published Flat fee: Res Mechanical Alt/Repair $110.00, per the Building Fee Schedule effective 11/01/2025 No electrical-specific flat fee is published
Brevard County Not published See schedule See schedule
Broward County See schedule See schedule Electrical permit is the greater of a $125 minimum base fee or 3.0% of job value; the schedule has the rest

Each cell is taken from that Florida jurisdiction's own fee schedule; the full wording and source sit on each permit page.

Escambia County permit questions, answered from the data

Do you need a permit in Escambia County?
For most projects, yes. Of the 10 permit types we cover in Escambia County, 7 always require a permit (for example a deck permit), 2 depend on size or scope (a roof replacement permit, for instance) and 1 needs no permit at all in Escambia County. Each Escambia County permit type's page states the exact rule and its source.
How much does a permit cost in Escambia County?
Escambia County publishes a fee for 1 of the 10 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by Escambia County Building Services Department (Building Inspections Division / Plan Review Division); we do not estimate or mark them up.
Where do you apply for a permit in Escambia County?
Escambia County Building Services Department (Building Inspections Division / Plan Review Division) issues permits in Escambia County and has an online permit portal, and takes questions at (850) 595-3550. The Escambia County official page and portal are linked in the office section above.

How the Escambia County pages were verified. 10 permit types, 5 distinct official sources, most recently checked . Every rule is read from Escambia County Building Services Department (Building Inspections Division / Plan Review Division) or the applicable code and cited on its page; anything we could not confirm for Escambia County is marked rather than estimated. How we verify.

Permitting activity in Escambia County

In 2025, Escambia County authorized permits for 1,398 new residential housing units (1,366 single-family, 32 in multi-family buildings), valued at $411M , down from 1,462 the year before. That works out to about 4.2 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 333,834.