Florida / Escambia County

Plumbing Permit in Escambia County, Florida

Permit required

Yes, a permit is required

Before relocating a plumbing fixture, replacing a bathtub with a shower or whirlpool tub/shower pan, replacing a water heater, replacing a water service line, or connecting an existing septic tank to sewer service, in unincorporated Escambia County or the Town of Century

Confirmed on official page Verified Escambia County Building Services Department (Building Inspections Division / Plan Review Division)

By Mario Bailey, verified against official sources

Quick answer

Escambia County requires a plumbing permit for relocating a fixture, replacing a bathtub with a shower or a whirlpool tub or shower pan, replacing any water heater, replacing a water service line, and connecting an existing septic tank to sewer service. The Plumbing Permit Application's fixture checklist also covers items such as sinks, toilets, dishwashers, and backflow devices. This applies to unincorporated Escambia County and the Town of Century; the City of Pensacola runs its own building department.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before relocating a plumbing fixture, replacing a bathtub with a shower or whirlpool tub/shower pan, replacing a water heater, replacing a water service line, or connecting an existing septic tank to sewer service, in unincorporated Escambia County or the Town of Century

What a plumbing permit costs in Escambia County

Line item
plumbing permitNot publishedEscambia County publishes no fee for this permit type in a schedule we can verify. Ask Escambia County Building Services Department (Building Inspections Division / Plan Review Division) how the fee is calculated for your project.

How Escambia County compares in Florida

JurisdictionPermit needed?Threshold
Alachua CountyPermit requiredNot specified
Brevard CountyIt dependsPermits are required for the installation or replacement of water, sewer, or gas piping and systems; this does not include changing like-for-like water heaters or fixtures such as sinks.
Broward CountyPermit requiredNot specified
Charlotte CountyPermit requiredNot specified
Clay CountyPermit requiredNot specified
Collier CountyPermit requiredPermits shall not be required for the following: ... Plumbing: 1. Repair work performed by licensed plumbing contractors that does not exceed $1,500.00 in value of materials and labor. [Followed by 16 specific exempted repairs/replacements, e.g. faucets, water closets, sinks, garbage disposals, dishwashers, and like-for-like electric water heaters up to 52-gallon capacity.]
Escambia Countythis pagePermit requiredNot specified

How to apply in Escambia County

You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.

What most plumbing permit applications include:

  • A permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
  • The application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
  • Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
  • Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
  • Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).

General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. Escambia County Building Services Department (Building Inspections Division / Plan Review Division) sets the exact checklist for Escambia County.

Where to apply in Escambia County:

Escambia County Building Services Department (Building Inspections Division / Plan Review Division)

Inspections and closing out your permit

Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.

  1. Piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
  2. Rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
  3. Rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
  4. The water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
  5. The framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
  6. At the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
  7. Final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Escambia County permit portal or by phone at (850) 595-3550.

Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a plumbing permit in Escambia County?
Escambia County requires a plumbing permit for relocating a fixture, replacing a bathtub with a shower or a whirlpool tub or shower pan, replacing any water heater, replacing a water service line, and connecting an existing septic tank to sewer service. The Plumbing Permit Application's fixture checklist also covers items such as sinks, toilets, dishwashers, and backflow devices. This applies to unincorporated Escambia County and the Town of Century; the City of Pensacola runs its own building department. Always confirm with the Escambia County Building Services Department (Building Inspections Division / Plan Review Division) before starting.
How much does a plumbing permit cost in Escambia County?
Fees are set by Escambia County and are not published here. Contact the office for current amounts.
Where do you apply for a plumbing permit in Escambia County?
You can apply through the Escambia County permit portal or contact the Escambia County Building Services Department (Building Inspections Division / Plan Review Division) directly. The links are listed on this page.
Can a homeowner pull a plumbing permit themselves in Escambia County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Escambia County applies this before you apply.

From the Library

What else needs a permit in Escambia County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?Threshold
Deck PermitPermit requiredNot specified
Electrical PermitPermit requiredNot specified
Fence PermitNo permit neededNot specified
HVAC PermitPermit requiredNot specified
Patio PermitPermit requiredNot specified
Pool PermitPermit requiredNot specified
Roof Replacement PermitIt dependsA Re-Roofing Permit is required for re-roofs exceeding 2 squares (1 square equals 100 square feet, so 2 squares equals 200 square feet); roof repair work under two squares does not require a permit.
Shed PermitIt dependsA portable, skid-mounted utility shed under 120 square feet does not require a permit; any utility shed with a poured slab or a post installed into the earth requires a permit regardless of size.
Solar PermitPermit requiredNot specified

Plumbing Permit in other Florida localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Escambia County documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with Escambia County Building Services Department (Building Inspections Division / Plan Review Division). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Plumbing Permit requirements across Florida localities

Look up an existing Escambia County permit record

Permit required
Get quotes