Plumbing Permit in Alachua County, Florida
Permit required
Yes, a permit is required
Before erecting, installing, enlarging, altering, repairing, removing, converting, or replacing any plumbing system. The county's narrow exemptions cover stopping leaks without replacing concealed piping and clearing stoppages or repairing leaks that don't require replacing valves, pipes, or fixtures.
Quick answer
Alachua County's general permit rule covers erecting, installing, enlarging, altering, repairing, removing, converting, or replacing any plumbing system, and the E-Permitting system lists plumbing repair (re-piping), water heater replacement, central water/sewer hookup, and solar water heaters as plumbing permit categories available online. The county's adopted local code exempts only the stopping of leaks in drains, water, soil, waste, or vent pipe without replacement, and clearing stoppages or minor leak repairs that don't require replacing valves, pipes, or fixtures.
- Issued by
- Alachua County Department of Growth Management, Building Division
- Phone
- 352-374-5243
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Plumbing permits are usually pulled by the plumber doing the job. If you are still choosing one, compare a few quotes first.
Compare plumber quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a plumbing permit costs in Alachua County
- Fee schedule in force
- Official scheduleRead .
No plumbing-specific flat fee is published;
plumbing work falls under the $150.00 minimum base permit fee plus the dollar-value-of-construction fee, per the Building Fee Schedule effective 11/01/2025.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Alachua County compares in Florida
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Alachua Countythis page | Permit required | Any size |
| Brevard County | It depends | Permits are required for the installation or replacement of water, sewer, or gas piping and systems; this does not include changing like-for-like water heaters or fixtures such as sinks. |
| Broward County | Permit required | Any size |
| Charlotte County | Permit required | Any size |
| Clay County | Permit required | Any size |
| Collier County | Permit required | Permits shall not be required for the following: ... Plumbing: 1. Repair work performed by licensed plumbing contractors that does not exceed $1,500.00 in value of materials and labor. [Followed by 16 specific exempted repairs/replacements, e.g. faucets, water closets, sinks, garbage disposals, dishwashers, and like-for-like electric water heaters up to 52-gallon capacity.] |
| Hernando County | Permit required | Any size |
How to apply in Alachua County
General guide, not specific to this office
What a plumbing permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a plumbing permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Alachua County Department of Growth Management, Building Division
- County Annex Building, 1st Floor, 10 SW 2nd Avenue, Gainesville, FL 32601
- Phone: 352-374-5243
- Email: building@alachuacounty.us
Your Plumbing Permit checklist for Alachua County
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: growth-management.alachuacounty.us: Building.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Alachua County permit portal.
- Keep the office details handy. Alachua County Department of Growth Management, Building Division. Phone: 352-374-5243. Email: building@alachuacounty.us. Address: County Annex Building, 1st Floor, 10 SW 2nd Avenue, Gainesville, FL 32601.
Compiled from the official sources on this page. Last checked .
Permitting activity in Alachua County
In 2025, Alachua County authorized permits for 3,336 new residential housing units (689 single-family, 2,647 in multi-family buildings), valued at $598M, up from 1,750 the year before. That works out to about 11.5 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 290,028.
What else needs a permit in Alachua County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Any size | No deck-specific flat fee is published |
| Electrical Permit | Permit required | Any size | No electrical-specific flat fee is published |
| Fence Permit | Permit required | Any size | No fence-specific flat fee is published |
| HVAC Permit | Permit required | Any size | Flat fee: Res Mechanical Alt/Repair $110.00, per the Building Fee Schedule effective 11/01/2025 |
| Pool Permit | Permit required | Any size | Flat fees: swimming pool (in-ground) $380.00, swimming pool (above-ground) $205.00, per the Building Fee Schedule effective 11/01/2025 |
| Roof Replacement Permit | It depends | area of roof repair or replacement | Flat fee: Roof: New Residential $220.00, Roof: Repair Residential $220.00, per the Building Fee Schedule effective 11/01/2025 |
| Shed Permit | It depends | area of a single storage shed, exemption available once per property | No shed-specific flat fee is published for sheds that don't qualify for the exemption |
| Solar Permit | Permit required | Any size | No solar-specific flat fee is published |
Frequently asked questions
- Do you need a plumbing permit in Alachua County?
- Yes, before erecting, installing, enlarging, altering, repairing, removing, converting, or replacing any plumbing system. The county's narrow exemptions cover stopping leaks without replacing concealed piping and clearing stoppages or repairing leaks that don't require replacing valves, pipes, or fixtures. If you are unsure how that applies to your project, call the Alachua County Department of Growth Management, Building Division at 352-374-5243 before you start.
- How much does a plumbing permit cost in Alachua County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 13 Aug 2026. For the figure on your own project, call the Alachua County Department of Growth Management, Building Division at 352-374-5243.
- Where do you apply for a plumbing permit in Alachua County?
- You can apply through the Alachua County permit portal or contact the Alachua County Department of Growth Management, Building Division directly. The links are listed on this page.
- Can a homeowner pull a plumbing permit themselves in Alachua County?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Alachua County applies this before you apply.
From the Library
Plumbing Permit in other Florida localities
Everything above, sourced
How this plumbing permit page for Alachua County was verified. 2 official sources: growth-management.alachuacounty.us, growth-management.alachuacounty.us; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Alachua County Department of Growth Management, Building Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page