Plumbing Permit in Collier County, Florida
Permit required
Yes, a permit is required
Before installing, replacing, or altering plumbing fixtures or piping in unincorporated Collier County
By Mario Bailey, verified against official sources
Quick answer
Collier County requires a building permit for plumbing work, filed under the Plumbing (PRPL) application category. A narrow local exemption covers minor repairs by a licensed plumbing contractor under $1,500 in materials and labor for detached single-family homes, along with a list of specific fixture repairs and replacements such as faucets, toilets, sinks, and like-for-like electric water heaters up to 52 gallons. This applies to unincorporated Collier County; incorporated cities operate their own building departments.
Typical threshold: Permits shall not be required for the following: ... Plumbing: 1. Repair work performed by licensed plumbing contractors that does not exceed $1,500.00 in value of materials and labor. [Followed by 16 specific exempted repairs/replacements, e.g. faucets, water closets, sinks, garbage disposals, dishwashers, and like-for-like electric water heaters up to 52-gallon capacity.].
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
When a permit is usually needed
Before installing, replacing, or altering plumbing fixtures or piping in unincorporated Collier County
What a plumbing permit costs in Collier County
How Collier County compares in Florida
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Alachua County | Permit required | Not specified |
| Brevard County | It depends | Permits are required for the installation or replacement of water, sewer, or gas piping and systems; this does not include changing like-for-like water heaters or fixtures such as sinks. |
| Broward County | Permit required | Not specified |
| Charlotte County | Permit required | Not specified |
| Clay County | Permit required | Not specified |
| Collier Countythis page | Permit required | Permits shall not be required for the following: ... Plumbing: 1. Repair work performed by licensed plumbing contractors that does not exceed $1,500.00 in value of materials and labor. [Followed by 16 specific exempted repairs/replacements, e.g. faucets, water closets, sinks, garbage disposals, dishwashers, and like-for-like electric water heaters up to 52-gallon capacity.] |
| Hernando County | Permit required | Not specified |
How to apply in Collier County
You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.
What most plumbing permit applications include:
- A permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
- The application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
- Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
- Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
- Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).
General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. Growth Management Community Development Department (GMCD), Building Plan Review and Inspection Division (Building Division) sets the exact checklist for Collier County.
Where to apply in Collier County:
Growth Management Community Development Department (GMCD), Building Plan Review and Inspection Division (Building Division)
- North Horseshoe Campus, 2800 Horseshoe Drive North, Naples, FL 34104
- Phone: 239-252-2400
- Email: Permitting.Dept@collier.gov
Inspections and closing out your permit
Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
- Piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
- Rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
- Rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
- The water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
- The framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
- At the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
- Final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Collier County permit portal or by phone at 239-252-2400.
Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Plumbing Permit checklist for Collier County
- Confirm the requirement. Yes, a permit is required. Typical threshold: Permits shall not be required for the following: ... Plumbing: 1. Repair work performed by licensed plumbing contractors that does not exceed $1,500.00 in value of materials and labor. [Followed by 16 specific exempted repairs/replacements, e.g. faucets, water closets, sinks, garbage disposals, dishwashers, and like-for-like electric water heaters up to 52-gallon capacity.]. Usually needed: Before installing, replacing, or altering plumbing fixtures or piping in unincorporated Collier County.
- Budget the fee. Fee Schedule (Resolution 2025-231, effective January 1, 2026), Plumbing and Gas Permit Review Fees: valuation up to $4,999.99, "$100.00 plus applicable inspection fees as required"; like-kind residential electric water heater replacement in an attached/multi-unit structure, "computed at $100.00 (fee includes 1 inspection).". Official fee schedule.
- Apply. You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit. Start at the Collier County permit portal.
- Keep the office details handy. Growth Management Community Development Department (GMCD), Building Plan Review and Inspection Division (Building Division). Phone: 239-252-2400. Address: North Horseshoe Campus, 2800 Horseshoe Drive North, Naples, FL 34104.
- Plan for inspections. Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a plumbing permit in Collier County?
- Collier County requires a building permit for plumbing work, filed under the Plumbing (PRPL) application category. A narrow local exemption covers minor repairs by a licensed plumbing contractor under $1,500 in materials and labor for detached single-family homes, along with a list of specific fixture repairs and replacements such as faucets, toilets, sinks, and like-for-like electric water heaters up to 52 gallons. This applies to unincorporated Collier County; incorporated cities operate their own building departments. Always confirm with the Growth Management Community Development Department (GMCD), Building Plan Review and Inspection Division (Building Division) before starting.
- How much does a plumbing permit cost in Collier County?
- Fee Schedule (Resolution 2025-231, effective January 1, 2026), Plumbing and Gas Permit Review Fees: valuation up to $4,999.99, "$100.00 plus applicable inspection fees as required"; like-kind residential electric water heater replacement in an attached/multi-unit structure, "computed at $100.00 (fee includes 1 inspection).". See the official fee schedule for current amounts.
- Where do you apply for a plumbing permit in Collier County?
- You can apply through the Collier County permit portal or contact the Growth Management Community Development Department (GMCD), Building Plan Review and Inspection Division (Building Division) directly. The links are listed on this page.
- Can a homeowner pull a plumbing permit themselves in Collier County?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Collier County applies this before you apply.
From the Library
What else needs a permit in Collier County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Not specified | Not published |
| Electrical Permit | Permit required | Permits shall not be required for the following: ... Electrical: 1. Repair work performed by licensed electrical contractors that does not exceed $1,500.00 in value of materials and labor. 2. Repair or replace existing light fixtures and ceiling fans. 3. Repair or replace electrical wall switches and wall outlet devices of 20 amps or less and 120 volts. 4. Repair/replace low voltage (under 77 volts) devices. | Fee Schedule (Resolution 2025-231, effective January 1, 2026), Electrical Permit Review... |
| Fence Permit | Permit required | Not specified | Fee Schedule (Resolution 2025-231, BCC approved October 28, 2025, effective January 1... |
| HVAC Permit | Permit required | This is a self-issuing permit available on the portal, unless any of the criteria listed below apply. If they do, the permit will follow the standard permitting and plan review process: Greater than 5 tons (single family); Located on the roof of a building; Adding concrete slab; Changing size of equipment; Moving location of equipment; Any changes to duct work; Adding a new mini-split; If owner-builder; In a trailer or manufactured home; If commercial building; If multi-family building. | Fee Schedule (Resolution 2025-231, effective January 1, 2026), Mechanical Permit Review... |
| Patio Permit | It depends | Permits shall not be required for the enclosure of an existing covered patio, balcony, or porch with screening only; a permit is required to build a new patio cover, screen enclosure, or other patio structure. | Not published |
| Pool Permit | Permit required | Not specified | Fee Schedule (Resolution 2025-231, effective January 1, 2026), Section U (Pool or Spa... |
| Roof Replacement Permit | Permit required | Collier County's locally adopted building code amendment exempts from permit only the repair of any roof covering not exceeding $1,500.00 in value of materials and labor, or repair work not exceeding two roofing squares (200 square feet) in extent; this exemption is for roof repair, not for roof replacement/reroofing (removing and replacing the covering), which requires a standard Reroof permit. | No roof-specific line item is published |
| Shed Permit | Permit required | Not specified | Not published |
| Solar Permit | Permit required | Not specified | Fee Schedule (Resolution 2025-231, effective January 1, 2026), Solar Permit Review Fees:... |
Plumbing Permit in other Florida localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Collier County documents; the office above sets the local rules.
Verified by a person against the sources above on , not confirmed with Growth Management Community Development Department (GMCD), Building Plan Review and Inspection Division (Building Division). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Plumbing Permit requirements across Florida localities
Permit office
Growth Management Community Development Department (GMCD), Building Plan Review and Inspection Division (Building Division)
239-252-2400Permit portalFlorida rule changes
- Broward County, FL updates building permit fee schedule (Ordinance 2025-038)
Ord. 2025-038 ·
- Florida waives permits for small single-family jobs under $7,500 (HB 803)
ch. 2026-63 (HB 803), F.S. 553.79 ·