Florida / Clay County

Plumbing Permit in Clay County, Florida

Permit required

Yes, a permit is required

New plumbing fixtures, bathroom additions or remodels, re-piping, or irrigation systems on residential property in unincorporated Clay County.

From an official source Verified

Issued byClay County Building Division

By Mario Bailey, verified against official sources

Quick answer

Clay County's HB 803 minor-work exemption guidance explicitly excludes 'Plumbing work' from the exemption regardless of project cost, so plumbing work always requires a standard building permit rather than being eligible for the new $7,500 owner-requested exemption.

Who is pulling this permit?

Hire it out

Sponsored

Plumbing permits are usually pulled by the plumber doing the job. If you are still choosing one, compare a few quotes first.

Compare plumber quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

New plumbing fixtures, bathroom additions or remodels, re-piping, or irrigation systems on residential property in unincorporated Clay County.

What a plumbing permit costs in Clay County

Line item
plumbing permitBy formulaFY24/25 Building Fee Schedule, Plumbing Permits (Section 208.3), effective January 1, 2025: residential minimum fee $50.00; one bath $50.00, one and one-half baths $60.00, two baths $75.00, two and one-half baths $80.00, three baths $90.00, each bath thereafter $20.00, each additional fixture $15.00, irrigation fee $50.00; commercial minimum fee $50.00 plus $15.00 per fixture with a water supply and/or waste outlet, including floor and roof drains. (Resolution No. 2023/2024-97, effective October 1, 2024.).
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Clay County compares in Florida

JurisdictionPermit needed?Threshold
Alachua CountyPermit requiredAny size
Brevard CountyIt dependsPermits are required for the installation or replacement of water, sewer, or gas piping and systems; this does not include changing like-for-like water heaters or fixtures such as sinks.
Broward CountyPermit requiredAny size
Charlotte CountyPermit requiredAny size
Clay Countythis pagePermit requiredAny size
Collier CountyPermit requiredPermits shall not be required for the following: ... Plumbing: 1. Repair work performed by licensed plumbing contractors that does not exceed $1,500.00 in value of materials and labor. [Followed by 16 specific exempted repairs/replacements, e.g. faucets, water closets, sinks, garbage disposals, dishwashers, and like-for-like electric water heaters up to 52-gallon capacity.]
Hernando CountyPermit requiredAny size

How to apply in Clay County

In Clay County, you apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.

What most plumbing permit applications include:

  • For Clay County, a permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
  • For Clay County, the application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
  • Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
  • Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
  • Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).

General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. Clay County Building Division sets the exact checklist for Clay County.

Where to apply in Clay County:

Clay County Building Division

  • 435 Walburg Street, Green Cove Springs, FL 32043 (mailing address: PO Box 1366, Green Cove Springs, FL 32043)
  • Phone: (904) 284-6307 or (904) 269-6307
  • Email: permits@claycountygov.com

Plumbing Permit in Clay County compared with nearby Florida localities

LocalityPermit needed?ThresholdWhat each Florida schedule saysVerified
Clay CountyPermit requiredAny size...Permits (Section 208.3), effective January 1, 2025: residential minimum fee...
Alachua CountyPermit requiredAny sizeNo plumbing-specific flat fee is published
Brevard CountyIt dependsPermits are required for the installation or replacement of water, sewer, or gas piping and systems; this does not include changing like-for-like water heaters or fixtures such as sinks....Plumbing Permit Application fee table lists a Building Code Review fee of $75.00...
Broward CountyPermit requiredAny sizePlumbing permit is the greater of a $125 minimum base fee or 3.0% of job value, per...
Charlotte CountyPermit requiredAny sizeAt application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation...

Inspections and closing out your permit

In Clay County, plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.

  1. In Clay County: piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
  2. In Clay County: rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
  3. In Clay County: rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
  4. In Clay County: the water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
  5. In Clay County: the framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
  6. In Clay County: at the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
  7. In Clay County: final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Clay County permit portal or by phone at (904) 284-6307 or (904) 269-6307.

Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a plumbing permit in Clay County?
Clay County's HB 803 minor-work exemption guidance explicitly excludes 'Plumbing work' from the exemption regardless of project cost, so plumbing work always requires a standard building permit rather than being eligible for the new $7,500 owner-requested exemption. Always confirm with the Clay County Building Division before starting.
How much does a plumbing permit cost in Clay County?
FY24/25 Building Fee Schedule, Plumbing Permits (Section 208.3), effective January 1, 2025: residential minimum fee $50.00; one bath $50.00, one and one-half baths $60.00, two baths $75.00, two and one-half baths $80.00, three baths $90.00, each bath thereafter $20.00, each additional fixture $15.00, irrigation fee $50.00; commercial minimum fee $50.00 plus $15.00 per fixture with a water supply and/or waste outlet, including floor and roof drains. (Resolution No. 2023/2024-97, effective October 1, 2024.). See the official fee schedule for current amounts.
Where do you apply for a plumbing permit in Clay County?
You can apply through the Clay County permit portal or contact the Clay County Building Division directly. The links are listed on this page.
Can a homeowner pull a plumbing permit themselves in Clay County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Clay County applies this before you apply.

From the Library

What else needs a permit in Clay County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredan elevated deck, as distinct from other deck workdeck work is not separately priced from the general $100.00 minimum building permit fee...
Electrical PermitPermit requiredAny size...208.2), effective January 1, 2025: new residential/mobile home minimum fee...
Fence PermitIt dependsvalue of repair or replacement work to existing wood fence pickets or panels, not including fence posts...general 'Minimum Fee for Any Building Permit (including amendments)' of $100.00...
HVAC PermitPermit requiredAny size...Mechanical Permits (Section 208.4), effective January 1, 2025: minimum fee...
Pool PermitPermit requiredAny size...208.5), effective January 1, 2025: minimum fee for the first 15,000 gallons $75.00...
Roof Replacement PermitPermit requiredAny sizeFY24/25 Building Fee Schedule: 'Roofing per 100 square feet' $10.00
Shed PermitPermit requiredAny size...Building Fee Schedule: 'Garages, Accessory Buildings per 100 square feet' $10.00...

Plumbing Permit in other Florida localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Clay County documents; the office above sets the local rules.

How this plumbing permit page for Clay County was verified. 1 official source: claycountygov.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Clay County Building Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Plumbing Permit requirements across Florida localities

Plumbing permit rules nationwide

Look up an existing Clay County permit record

Permit required
Get quotes