Florida / Clay County

Shed Permit in Clay County, Florida

Permit required

Yes, a permit is required

Installing any shed, pre-fabricated or owner-built, on residential property in unincorporated Clay County.

From an official source Verified Clay County Building Division

By Mario Bailey, verified against official sources

Quick answer

Clay County's own step-by-step guide for shed permits, 'How to Apply for a Pre-Fabricated Shed,' walks applicants through the Citizens Access Portal application and does not describe any small-shed size exemption from permitting. Instead it caps the Owner-as-Builder route (no licensed contractor) at 400 square feet, requiring a notarized Owner-as-Builder Disclosure for that path or a licensed contractor's Owner Affidavit for larger sheds. A Planning and Zoning pre-review/site review is required before the shed permit application, per the Building Division FAQ.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Installing any shed, pre-fabricated or owner-built, on residential property in unincorporated Clay County.

What your shed permit must meet in Florida

Florida sheds are built under the Florida Building Code, Residential, 8th Edition (2023), which requires structures to be designed for the state's wind loads, but Florida Statutes carve out two specific size-based reductions in what a shed must resist or include.

  • As a structure, a shed is generally subject to the Florida Building Code's baseline wind-design requirement that applies to buildings and structures statewide (FBC Section 1609.1).
  • Storage sheds not designed for human habitation with a floor area of 720 square feet or less are exempt from the code's mandatory windborne-debris-impact (opening protection) standard (F.S. 553.73(10)).
  • Buildings of 400 square feet or less used in conjunction with a one- or two-family residence, which covers most sheds, are exempt from the code's door height and width requirements (F.S. 553.73(10)).

Based on Florida Statutes 553.73(10); Florida Building Code, 8th Edition (2023), Section 1609.1. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.

What a shed permit costs in Clay County

Line item
shed permitBy formulaFY24/25 Building Fee Schedule: 'Garages, Accessory Buildings per 100 square feet' $10.00, effective January 1, 2025; the general 'Minimum Fee for Any Building Permit' of $100.00 also applies. (Resolution No. 2023/2024-97, effective October 1, 2024.).
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Clay County compares in Florida

JurisdictionPermit needed?Threshold
Alachua CountyIt dependsarea of a single storage shed, exemption available once per property
Brevard CountyIt dependsA permit is required for an accessory structure (shed) over 100 square feet.
Broward CountyPermit requiredNot specified
Charlotte CountyIt dependsA building permit is not required for plastic or rubber manufactured type sheds 68 square feet or less in area, though they must comply with zoning setbacks and be moved and secured if there is the threat of a tropical storm.
Clay Countythis pagePermit requiredNot specified
Hernando CountyIt dependsSheds with impervious roof coverings of 120 square feet or less do not require a Zoning permit, provided other county regulations (setbacks, floodplain rules, one detached accessory building per parcel, etc.) are met
Hillsborough CountyIt dependssheds under 150 sq ft are exempt; 150 sq ft or larger require a building permit

How to apply in Clay County

A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.

What most shed permit applications include:

  • A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
  • A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
  • Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
  • Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
  • Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).

General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. Clay County Building Division sets the exact checklist for Clay County.

Where to apply in Clay County:

Clay County Building Division

  • 435 Walburg Street, Green Cove Springs, FL 32043 (mailing address: PO Box 1366, Green Cove Springs, FL 32043)
  • Phone: (904) 284-6307 or (904) 269-6307
  • Email: permits@claycountygov.com

Inspections and closing out your permit

A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.

  1. Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
  2. Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
  3. Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
  4. For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Clay County permit portal or by phone at (904) 284-6307 or (904) 269-6307.

Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a shed permit in Clay County?
Clay County's own step-by-step guide for shed permits, 'How to Apply for a Pre-Fabricated Shed,' walks applicants through the Citizens Access Portal application and does not describe any small-shed size exemption from permitting. Instead it caps the Owner-as-Builder route (no licensed contractor) at 400 square feet, requiring a notarized Owner-as-Builder Disclosure for that path or a licensed contractor's Owner Affidavit for larger sheds. A Planning and Zoning pre-review/site review is required before the shed permit application, per the Building Division FAQ. Always confirm with the Clay County Building Division before starting.
How much does a shed permit cost in Clay County?
FY24/25 Building Fee Schedule: 'Garages, Accessory Buildings per 100 square feet' $10.00, effective January 1, 2025; the general 'Minimum Fee for Any Building Permit' of $100.00 also applies. (Resolution No. 2023/2024-97, effective October 1, 2024.). See the official fee schedule for current amounts.
Where do you apply for a shed permit in Clay County?
You can apply through the Clay County permit portal or contact the Clay County Building Division directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Clay County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Clay County applies this before you apply.

From the Library

What else needs a permit in Clay County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredan elevated deck, as distinct from other deck workNo deck-specific line item appears in the FY24/25 Building Fee Schedule (Resolution No.
Electrical PermitPermit requiredNot specifiedFY24/25 Building Fee Schedule, Electrical Permits (Section 208.2), effective January 1...
Fence PermitIt dependsvalue of repair or replacement work to existing wood fence pickets or panels, not including fence postsThe FY 2024/2025 Building Fee Schedule (Resolution No.
HVAC PermitPermit requiredNot specifiedFY24/25 Building Fee Schedule, Mechanical Permits (Section 208.4), effective January 1...
Plumbing PermitPermit requiredNot specifiedFY24/25 Building Fee Schedule, Plumbing Permits (Section 208.3), effective January 1...
Pool PermitPermit requiredNot specifiedFY24/25 Building Fee Schedule, Pool Permits (Section 208.5), effective January 1, 2025:...
Roof Replacement PermitPermit requiredNot specifiedFY24/25 Building Fee Schedule: 'Roofing per 100 square feet' $10.00.

Shed Permit in other Florida localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Clay County documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with Clay County Building Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page