Shed Permit in Clay County, Florida
Permit required
Yes, a permit is required
Installing any shed, pre-fabricated or owner-built, on residential property in unincorporated Clay County.
Quick answer
Clay County's own step-by-step guide for shed permits, 'How to Apply for a Pre-Fabricated Shed,' walks applicants through the Citizens Access Portal application and does not describe any small-shed size exemption from permitting. Instead it caps the Owner-as-Builder route (no licensed contractor) at 400 square feet, requiring a notarized Owner-as-Builder Disclosure for that path or a licensed contractor's Owner Affidavit for larger sheds. A Planning and Zoning pre-review/site review is required before the shed permit application, per the Building Division FAQ.
- Issued by
- Clay County Building Division
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.
Compare contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What your shed permit must meet in Florida
Florida sheds are built under the Florida Building Code, Residential, 8th Edition (2023), which requires structures to be designed for the state's wind loads, but Florida Statutes carve out two specific size-based reductions in what a shed must resist or include.
- As a structure, a shed is generally subject to the Florida Building Code's baseline wind-design requirement that applies to buildings and structures statewide (FBC Section 1609.1).
- Storage sheds not designed for human habitation with a floor area of 720 square feet or less are exempt from the code's mandatory windborne-debris-impact (opening protection) standard (F.S. 553.73(10)).
- Buildings of 400 square feet or less used in conjunction with a one- or two-family residence, which covers most sheds, are exempt from the code's door height and width requirements (F.S. 553.73(10)).
Based on Florida Statutes 553.73(10); Florida Building Code, 8th Edition (2023), Section 1609.1. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.
What a shed permit costs in Clay County
- Fee schedule in force
- Official scheduleRead .
New Accessory Buildings (barns, carports, garages, screen porches, and sheds): $10.00 per 100 square feet, subject to the Minimum Fee for Any Building Permit of $100.00, per the Building Department section of the Clay County BCC FY 26/27 Schedule of Fees & Services.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Clay County compares in Florida
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Alachua County | It depends | area of a single storage shed, exemption available once per property |
| Brevard County | It depends | A permit is required for an accessory structure (shed) over 100 square feet. |
| Broward County | Permit required | Any size |
| Charlotte County | It depends | A building permit is not required for plastic or rubber manufactured type sheds 68 square feet or less in area, though they must comply with zoning setbacks and be moved and secured if there is the threat of a tropical storm. |
| Clay Countythis page | Permit required | Any size |
| Hernando County | It depends | Sheds with impervious roof coverings of 120 square feet or less do not require a Zoning permit, provided other county regulations (setbacks, floodplain rules, one detached accessory building per parcel, etc.) are met |
| Hillsborough County | It depends | sheds less than 150 sq ft are exempt; sheds over 150 sq ft require a building permit; the county pages do not clearly place a shed of exactly 150 sq ft |
How to apply in Clay County
General guide, not specific to this office
What a shed permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a shed permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Clay County Building Division
- 435 Walburg Street, Green Cove Springs, FL 32043 (mailing address: PO Box 1366, Green Cove Springs, FL 32043)
- Phone: (904) 284-6307 or (904) 269-6307
- Email: permits@claycountygov.com
Your Shed Permit checklist for Clay County
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: claycountygov.com: building.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Clay County permit portal.
- Keep the office details handy. Clay County Building Division. Phone: (904) 284-6307 or (904) 269-6307. Email: permits@claycountygov.com. Address: 435 Walburg Street, Green Cove Springs, FL 32043 (mailing address: PO Box 1366, Green Cove Springs, FL 32043).
Compiled from the official sources on this page. Last checked .
Permitting activity in Clay County
In 2025, Clay County authorized permits for 1,522 new residential housing units (1,240 single-family, 282 in multi-family buildings), valued at $404M, down from 1,880 the year before. That works out to about 6.4 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 239,593.
What else needs a permit in Clay County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | an elevated deck, as distinct from other deck work | Deck work falls under the Building Permits minimum, 'Minimum Fee for Any Building Permit (including amendments)', of $100.00 |
| Electrical Permit | Permit required | Any size | New residential construction: minimum fee $50.00, and $80.00 for 0 - 200 ampere service up to $150.00 for 400 ampere service |
| Fence Permit | It depends | value of repair or replacement work to existing wood fence pickets or panels, not including fence posts | Fence work falls under the Building Permits minimum, 'Minimum Fee for Any Building Permit (including amendments)', of $100.00 |
| HVAC Permit | Permit required | Any size | Mechanical Permits (commercial and residential): minimum fee $50.00 |
| Plumbing Permit | Permit required | Any size | Residential plumbing: minimum fee $50.00 |
| Pool Permit | Permit required | Any size | Pool Permits: Minimum Fee for first 15,000 gallons $75.00, plus $5.00 for each additional 1,000 gallons |
| Roof Replacement Permit | Permit required | Any size | Roofing: $10.00 per 100 square feet |
Frequently asked questions
- Do you need a shed permit in Clay County?
- Yes. Installing any shed, pre-fabricated or owner-built, on residential property in unincorporated Clay County. If you are unsure how that applies to your project, call the Clay County Building Division at (904) 284-6307 or (904) 269-6307 before you start.
- How much does a shed permit cost in Clay County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the Clay County Building Division at (904) 284-6307 or (904) 269-6307.
- Where do you apply for a shed permit in Clay County?
- You can apply through the Clay County permit portal or contact the Clay County Building Division directly. The links are listed on this page.
- Can a homeowner pull a shed permit themselves in Clay County?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Clay County applies this before you apply.
From the Library
Shed Permit in other Florida localities
Everything above, sourced
How this shed permit page for Clay County was verified. 2 official sources: claycountygov.com, claycountygov.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Clay County Building Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page