Florida / Clay County

Pool Permit in Clay County, Florida

Permit required

Yes, a permit is required

Installing a swimming pool on residential property in unincorporated Clay County. The required safety feature must be chosen at the time of permitting.

Quick answer

Clay County's Building Division FAQ walks through the pool safety requirements a homeowner must choose from when installing a pool: a barrier (fence, wall, or screen at least 4 feet high with a self-closing, self-latching gate whose latch sits at least 54 inches high), a safety pool cover meeting ASTM F1346-91, exit alarms on doors and windows, self-closing/self-latching doors, or a pool alarm meeting ASTM F2208. The FAQ states this safety-feature choice is confirmed at the time of permitting and that both the homeowner and contractor must sign a safety statement, which confirms pool installation is a permitted activity.

Issued by
Clay County Building Division
From an official source Verified

Who is pulling this permit?

Hire it out

Sponsored

Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.

Compare pool builder quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What your pool permit must meet in Florida

Florida residential pools are built under the Florida Building Code, Residential, 8th Edition (2023), which the Legislature requires to incorporate the safety-feature and barrier standards of the Residential Swimming Pool Safety Act (Florida Statutes Chapter 515).

  • State law requires the Florida Building Code to uniformly implement the pool-safety statutes by including standards for residential swimming pool barriers, pool covers, latching devices, and door and window exit alarms (F.S. 553.73).
  • A new residential pool must be built with at least one of five listed safety features, not necessarily a fence: a compliant barrier, an approved safety pool cover, exit alarms on doors and windows with access to the pool, self-closing self-latching doors, or a certified pool alarm (F.S. 515.27).
  • If a barrier is used, it must be at least 4 feet high on the outside and may not have gaps, openings, indentations, or structural components that could let a young child crawl under, squeeze through, or climb over it, placed far enough from the water's edge that a child who gets past it does not immediately fall in (F.S. 515.29).
  • Pool gates must open outward away from the pool, be self-closing, and have a self-latching device with its release mechanism on the pool side, positioned out of a young child's reach (F.S. 515.29).
  • Where a removable mesh safety barrier is used, it must comply with ASTM F2286 and may not be installed on top of an above-ground or on-ground pool (FBC-R, 8th Edition change).

Based on Florida Statutes Chapter 515 (Residential Swimming Pool Safety Act, ss. 515.27, 515.29) as implemented by the Florida Building Code, Residential, 8th Edition (2023), Chapter 45. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.

What a pool permit costs in Clay County

Fee schedule in force
Official scheduleRead .
Published in
FY24/25 Building Fee Schedule, Pool Permits (Section 208.5), effective January 1, 2025:

minimum fee for the first 15,000 gallons $75.00, each additional 1,000 gallons $5.00, and Remarcite (resurfacing) $75.00. (Resolution No. 2023/2024-97, effective October 1, 2024.)

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Clay County compares in Florida

JurisdictionPermit needed?Threshold
Alachua CountyPermit requiredAny size
Brevard CountyIt dependsPermits are issued for in-ground pools and spas, and for above-ground pools with a depth of 24 inches or greater.
Broward CountyPermit requiredAny size
Charlotte CountyPermit requiredThis residential pool/spa permit type includes spas, swim spas, and above-ground pools that are 24 inches or greater in depth.
Clay Countythis pagePermit requiredAny size
Collier CountyPermit requiredAny size
Hernando CountyIt dependsManufactured pools less than 24 inches deep are exempt from a building permit

How to apply in Clay County

General guide, not specific to this office

What a pool permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a pool permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Clay County Building Division

  • 435 Walburg Street, Green Cove Springs, FL 32043 (mailing address: PO Box 1366, Green Cove Springs, FL 32043)
  • Phone: (904) 284-6307 or (904) 269-6307
  • Email: permits@claycountygov.com

Permitting activity in Clay County

In 2025, Clay County authorized permits for 1,522 new residential housing units (1,240 single-family, 282 in multi-family buildings), valued at $404M, down from 1,880 the year before. That works out to about 6.4 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 239,593.

What else needs a permit in Clay County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredan elevated deck, as distinct from other deck workDeck work is not separately priced from the general $100.00 minimum building permit fee or a job-value-based fee in the published schedule
Electrical PermitPermit requiredAny sizeFY24/25 Building Fee Schedule, Electrical Permits (Section 208.2), effective January 1, 2025: new residential/mobile home minimum fee $50.00
Fence PermitIt dependsvalue of repair or replacement work to existing wood fence pickets or panels, not including fence postsFence work would fall under the general 'Minimum Fee for Any Building Permit (including amendments)' of $100.00, effective January 1; the schedule has the rest
HVAC PermitPermit requiredAny sizeFY24/25 Building Fee Schedule, Mechanical Permits (Section 208.4), effective January 1, 2025: minimum fee $50.00
Plumbing PermitPermit requiredAny sizeFY24/25 Building Fee Schedule, Plumbing Permits (Section 208.3), effective January 1, 2025: residential minimum fee $50.00
Roof Replacement PermitPermit requiredAny sizeFY24/25 Building Fee Schedule: 'Roofing per 100 square feet' $10.00
Shed PermitPermit requiredAny sizeFY24/25 Building Fee Schedule: 'Garages, Accessory Buildings per 100 square feet' $10.00, effective January 1, 2025

Frequently asked questions

Do you need a pool permit in Clay County?
Yes. Installing a swimming pool on residential property in unincorporated Clay County. The required safety feature must be chosen at the time of permitting. If you are unsure how that applies to your project, call the Clay County Building Division at (904) 284-6307 or (904) 269-6307 before you start.
How much does a pool permit cost in Clay County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 13 Aug 2026. For the figure on your own project, call the Clay County Building Division at (904) 284-6307 or (904) 269-6307.
Where do you apply for a pool permit in Clay County?
You can apply through the Clay County permit portal or contact the Clay County Building Division directly. The links are listed on this page.
Can a homeowner pull a pool permit themselves in Clay County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Clay County applies this before you apply.

From the Library

Pool Permit in other Florida localities

Everything above, sourced

How this pool permit page for Clay County was verified. 2 official sources: claycountygov.com, claycountygov.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Clay County Building Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project