Florida / Hernando County

Pool Permit in Hernando County, Florida

It depends

Sometimes, depending on the project

Before installing an above-ground or in-ground pool in unincorporated Hernando County, unless it is a manufactured pool less than 24 inches deep

Quick answer

Hernando County's Development Services FAQ lists pools, in-ground or above ground, among projects that require a permit, and the Building Division's fee schedule lists separate fees for above-ground and in-ground pools, permanent and portable spas, pool heaters, and pool screen enclosures. The county's Items Not Requiring a Building Permit document exempts only manufactured pools less than 24 inches deep. This describes unincorporated Hernando County; the City of Brooksville operates its own building department.

Diagram of the 24 in water depth pool water depth threshold for a pool permit in Hernando County, Florida
Threshold illustrated: 24 in water depth. Whether Hernando County requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-08-13.
Typical threshold
Manufactured pools less than 24 inches deep are exempt from a building permit
Issued by
Building Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.

Compare pool builder quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

Pool size, height and setback rules in Hernando County

Setback
In the R-1A, R-1B and R-1C districts, a swimming pool or screened pool enclosure is allowed in the side or rear yard and must be at least 5 feet from the side and rear property lines; in a secondary front yard it must meet the district's front yard requirement for the house. library.municode.com: code of ordinances
Setback
In the R-2.5 district, on a lot that backs onto a golf course, a screened pool enclosure must meet the rear yard requirement for the house, and on a lot that backs onto a river or lake, screened pool enclosures and accessory buildings (except boat houses) must also meet the house's rear yard requirement. library.municode.com: code of ordinances

What your pool permit must meet in Florida

Florida residential pools are built under the Florida Building Code, Residential, 8th Edition (2023), which the Legislature requires to incorporate the safety-feature and barrier standards of the Residential Swimming Pool Safety Act (Florida Statutes Chapter 515).

  • State law requires the Florida Building Code to uniformly implement the pool-safety statutes by including standards for residential swimming pool barriers, pool covers, latching devices, and door and window exit alarms (F.S. 553.73).
  • A new residential pool must be built with at least one of five listed safety features, not necessarily a fence: a compliant barrier, an approved safety pool cover, exit alarms on doors and windows with access to the pool, self-closing self-latching doors, or a certified pool alarm (F.S. 515.27).
  • If a barrier is used, it must be at least 4 feet high on the outside and may not have gaps, openings, indentations, or structural components that could let a young child crawl under, squeeze through, or climb over it, placed far enough from the water's edge that a child who gets past it does not immediately fall in (F.S. 515.29).
  • Pool gates must open outward away from the pool, be self-closing, and have a self-latching device with its release mechanism on the pool side, positioned out of a young child's reach (F.S. 515.29).
  • Where a removable mesh safety barrier is used, it must comply with ASTM F2286 and may not be installed on top of an above-ground or on-ground pool (FBC-R, 8th Edition change).

Based on Florida Statutes Chapter 515 (Residential Swimming Pool Safety Act, ss. 515.27, 515.29) as implemented by the Florida Building Code, Residential, 8th Edition (2023), Chapter 45. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.

What a pool permit costs in Hernando County

Fee schedule in force
Official scheduleRead .
  • Swimming Pool, Above Ground: $140.00;
  • Swimming Pool, In-Ground: $361.00;
  • Spa (In-ground/Permanent): $361.00;
  • Spa (Portable): $180.00;
  • Pool Heating System: $115.00;
  • Screen Enclosure (Pool): $140.00, per Resolution No. 2026-037 (effective March 3, 2026).

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Hernando County compares in Florida

Across the Florida jurisdictions we have verified, the same threshold runs from 24 to 42, so a project that is exempt here may still need a permit one county over.

JurisdictionPermit needed?Threshold
Brevard CountyIt dependsPermits are issued for in-ground pools and spas, and for above-ground pools with a depth of 24 inches or greater.
Charlotte CountyPermit requiredThis residential pool/spa permit type includes spas, swim spas, and above-ground pools that are 24 inches or greater in depth.
Hernando Countythis pageIt dependsManufactured pools less than 24 inches deep are exempt from a building permit
Lake CountyIt dependsStorable swimming or wading pools capable of holding water to a maximum depth of 42 inches, or pools with nonmetallic molded polymeric or inflatable fabric walls regardless of dimension, are exempt from a building permit except for non-cord-and-plug electrical work
Lee CountyIt dependsAll in-ground pool construction or renovation requires a permit; an above-ground pool requires a permit when its water depth is 24 inches or more.
Leon CountyPermit requiredApplies to private residential swimming pools, hot tubs, or non-portable spas containing water over 24 inches deep.
Manatee CountyIt dependsSwimming pools require a building permit, including above ground pools that exceed 24 inches in height.

How to apply in Hernando County

General guide, not specific to this office

What a pool permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a pool permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Building Division

Permitting activity in Hernando County

In 2025, Hernando County authorized permits for 1,975 new residential housing units (1,734 single-family, 241 in multi-family buildings), valued at $528M, down from 2,505 the year before. That works out to about 8.9 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 221,701.

What else needs a permit in Hernando County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeDeck: $140.00, per the Building Division fee schedule (Resolution No. 2026-037, effective March 3, 2026)
Electrical PermitPermit requiredAny sizeElectric, Other: $165.00
Fence PermitPermit requiredFence permits are required in all commercial, industrial, and residential zoning districts; agricultural zoning districts (AG, AR, AR1, AR2, PDP(RUR)) are exempt from the Fence OrdinanceSee schedule
HVAC PermitIt dependsA window air conditioning unit using an existing electrical outlet, and repair of existing mechanical equipment, do not require a building permit; installing a new central/ducted system or changing out equipment doesMechanical A/C Changeout Only: $140.00
Patio PermitIt dependsSand-set pavers that are not part of a pool or spa deck do not require a building permit; other patio construction methods are not separately addressed by nameA concrete patio slab appears to fall under the schedule's Slab permit ($180.00); the schedule has the rest
Plumbing PermitPermit requiredAny sizePlumbing, Other (Res): $115.00, per Resolution No. 2026-037 (effective March 3, 2026)
Roof Replacement PermitPermit requiredRoof repairs covering less than 100 square feet of existing roof are exempt from a building permit; this exemption does not extend to a full roof replacementRoofing, Residential: $190.00, per Resolution No. 2026-037 (effective March 3, 2026)
Shed PermitIt dependsSheds with impervious roof coverings of 120 square feet or less do not require a Zoning permit, provided other county regulations (setbacks, floodplain rules, one detached accessory building per parcel, etc.) are metOr less (Non-Commercial, Site Built or 1 Piece/Pre-Fab) - Building: $140.00, per Resolution No. 2026-037 (effective March 3, 2026)
Solar PermitPermit requiredAny sizePhotovoltaic System (Res): $180.00

Frequently asked questions

Do you need a pool permit in Hernando County?
It depends on the project. Manufactured pools less than 24 inches deep are exempt from a building permit. If you are unsure how that applies to your project, call the Building Division at (352) 754-4050 before you start.
How much does a pool permit cost in Hernando County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the Building Division at (352) 754-4050.
Where do you apply for a pool permit in Hernando County?
You can apply through the Hernando County permit portal or contact the Building Division directly. The links are listed on this page.
Can a homeowner pull a pool permit themselves in Hernando County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Hernando County applies this before you apply.

From the Library

Pool Permit in other Florida localities

Everything above, sourced

How this pool permit page for Hernando County was verified. 2 official sources: hernandocounty.us, hernandocounty.us; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Building Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project