Florida / Manatee County

Pool Permit in Manatee County, Florida

It depends

Sometimes, depending on the project

Before installing any swimming pool, including an above ground pool over 24 inches high, in unincorporated Manatee County

Quick answer

In unincorporated Manatee County, a swimming pool requires a building permit, including an above ground pool that exceeds 24 inches in height. Setbacks for swimming pools and screened pool enclosures are five feet from the side and rear property lines, and no pool or pool cage may encroach into an easement or drainage swale. The county's fee schedule prices an above ground pool or spa permit separately from an in ground pool or spa permit. This applies to unincorporated Manatee County; incorporated cities have their own building departments.

Diagram of the 24 in water depth pool water depth threshold for a pool permit in Manatee County, Florida
Threshold illustrated: 24 in water depth. Whether Manatee County requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-08-08.
Typical threshold
Swimming pools require a building permit, including above ground pools that exceed 24 inches in height.
Issued by
Manatee County Development Services Department, Building Division (Permitting Section)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.

Compare pool builder quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What your pool permit must meet in Florida

Florida residential pools are built under the Florida Building Code, Residential, 8th Edition (2023), which the Legislature requires to incorporate the safety-feature and barrier standards of the Residential Swimming Pool Safety Act (Florida Statutes Chapter 515).

  • State law requires the Florida Building Code to uniformly implement the pool-safety statutes by including standards for residential swimming pool barriers, pool covers, latching devices, and door and window exit alarms (F.S. 553.73).
  • A new residential pool must be built with at least one of five listed safety features, not necessarily a fence: a compliant barrier, an approved safety pool cover, exit alarms on doors and windows with access to the pool, self-closing self-latching doors, or a certified pool alarm (F.S. 515.27).
  • If a barrier is used, it must be at least 4 feet high on the outside and may not have gaps, openings, indentations, or structural components that could let a young child crawl under, squeeze through, or climb over it, placed far enough from the water's edge that a child who gets past it does not immediately fall in (F.S. 515.29).
  • Pool gates must open outward away from the pool, be self-closing, and have a self-latching device with its release mechanism on the pool side, positioned out of a young child's reach (F.S. 515.29).
  • Where a removable mesh safety barrier is used, it must comply with ASTM F2286 and may not be installed on top of an above-ground or on-ground pool (FBC-R, 8th Edition change).

Based on Florida Statutes Chapter 515 (Residential Swimming Pool Safety Act, ss. 515.27, 515.29) as implemented by the Florida Building Code, Residential, 8th Edition (2023), Chapter 45. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.

What a pool permit costs in Manatee County

Fee schedule in force
Official scheduleRead .
Published in
Manatee County Development Services Building Fee Schedule, effective 04/01/2023 (R-23-043, R-23-045, R-23-046):

Above Ground Pool/Spa Permit $100;

In Ground Pool/Spa Permit $244.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Manatee County compares in Florida

Across the Florida jurisdictions we have verified, the same threshold runs from 24 to 42, so a project that is exempt here may still need a permit one county over.

JurisdictionPermit needed?Threshold
Brevard CountyIt dependsPermits are issued for in-ground pools and spas, and for above-ground pools with a depth of 24 inches or greater.
Charlotte CountyPermit requiredThis residential pool/spa permit type includes spas, swim spas, and above-ground pools that are 24 inches or greater in depth.
Hernando CountyIt dependsManufactured pools less than 24 inches deep are exempt from a building permit
Lake CountyIt dependsStorable swimming or wading pools capable of holding water to a maximum depth of 42 inches, or pools with nonmetallic molded polymeric or inflatable fabric walls regardless of dimension, are exempt from a building permit except for non-cord-and-plug electrical work
Lee CountyIt dependsAll in-ground pool construction or renovation requires a permit; an above-ground pool requires a permit when its water depth is 24 inches or more.
Leon CountyPermit requiredApplies to private residential swimming pools, hot tubs, or non-portable spas containing water over 24 inches deep.
Manatee Countythis pageIt dependsSwimming pools require a building permit, including above ground pools that exceed 24 inches in height.

How to apply in Manatee County

General guide, not specific to this office

What a pool permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a pool permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Manatee County Development Services Department, Building Division (Permitting Section)

Permitting activity in Manatee County

In 2025, Manatee County authorized permits for 11,015 new residential housing units (7,014 single-family, 4,001 in multi-family buildings), valued at $2.4B, up from 7,472 the year before. That works out to about 23.5 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 468,200.

What else needs a permit in Manatee County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsAll attached decks require a building permit regardless of size. A detached deck requires a permit if it is over 30 inches high or over 120 square feet; a detached deck under 30 inches high and under 120 square feet does not require a permit.Manatee County Development Services Building Fee Schedule, effective 04/01/2023 (R-23-043, R-23-045, R-23-046): Deck Permit $173; the schedule has the rest
Electrical PermitIt dependsAny alteration of electrical wiring requires a permit. Residential low voltage (wired or wireless) work does not require a permit unless its cost exceeds $5,000 within any 12-month period. Repair or replacement of a wall switch or outlet device rated 20 amps and 120 volts or less does not require a permit.Manatee County Development Services Building Fee Schedule, effective 04/01/2023 (R-23-043, R-23-045, R-23-046): Electrical Express (Residential Only) $133
Fence PermitIt dependsMasonry fences, walls, and columns (residential and commercial) always require a building permit. Non-structural residential fences such as wood, chain link, and vinyl are exempt from a building permit when located on a one or two family lot that is not in a flood hazard area.Manatee County Development Services Building Fee Schedule, effective 04/01/2023 (R-23-043, R-23-045, R-23-046): Fence Commercial or Residential Structural $207
HVAC PermitIt dependsReplacement and new installation of air conditioners and ductwork require a mechanical permit. Replacement of a window air conditioning unit, and portable heating or cooling appliances, do not require a permit.See schedule
Patio PermitIt dependsA non-structural concrete or paver patio does not require a building permit. A concrete slab with footers requires a permit.Not published
Plumbing PermitIt dependsNew plumbing work such as re-piping, a new water service, a new or replacement sewer, and most water heater replacements require a permit. An electric to electric water heater changeout of the same size in the same location, and replacement of a plumbing fixture such as a toilet or faucet where no rough plumbing is changed, do not require a permit.See schedule
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitIt dependsA prefabricated shed used as a tool/storage shed or playhouse is exempt from a building permit if its floor area does not exceed 120 square feet and it is not over 8 feet high, measured from mean roof height; zoning and flood regulations still apply regardless. Sheds exceeding that size, or not used for tool/storage/playhouse purposes, require a permit.Manatee County Development Services Building Fee Schedule, effective 04/01/2023 (R-23-043, R-23-045, R-23-046): Prefabricated Utility Shed $91
Solar PermitPermit requiredAny sizeManatee County Development Services Building Fee Schedule, effective 04/01/2023 (R-23-043, R-23-045, R-23-046): Solar Permit $127

Frequently asked questions

Do you need a pool permit in Manatee County?
It depends on the project. Swimming pools require a building permit, including above ground pools that exceed 24 inches in height. If you are unsure how that applies to your project, call the permit office at (941) 748-4501 ext. 3800 before you start.
How much does a pool permit cost in Manatee County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at (941) 748-4501 ext. 3800.
Where do you apply for a pool permit in Manatee County?
You can apply through the Manatee County permit portal or contact the Manatee County Development Services Department, Building Division (Permitting Section) directly. The links are listed on this page.
Can a homeowner pull a pool permit themselves in Manatee County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Manatee County applies this before you apply.

From the Library

Pool Permit in other Florida localities

Everything above, sourced

How this pool permit page for Manatee County was verified. 2 official sources: mymanatee.org, mymanatee.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Manatee County Development Services Department, Building Division (Permitting Section). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project