Permit records

Manatee County permit search

Manatee County permit records are public. The county publishes them through Accela Online Services.

Project types verified
10
in Manatee County
Search verified
8 Aug 2026
we opened it ourselves

How to search

  1. Open the Manatee County permit record search.
  2. Enter an address, or switch the search type to look up permits by permit number.
  3. Open a result to see the permit's status, inspection history, and issue date.
The Manatee County permit portal search screen
Manatee County's Accela Online Services, at aca-prod.accela.com, as captured on , so you can match the screen to the steps above; it may look different today.

If the permit does not turn up

Older permits are often missing from online records, and a permit filed under a contractor's name will not surface in an address search that expects the owner. Manatee County Development Services Department, Building Division (Permitting Section) can check the paper file.

What needs a permit in Manatee County

Every project type we have verified in Manatee County, with the rule, the threshold, and the fee that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsAll attached decks require a building permit regardless of size. A detached deck requires a permit if it is over 30 inches high or over 120 square feet; a detached deck under 30 inches high and under 120 square feet does not require a permit.Manatee County Development Services Building Fee Schedule, effective 04/01/2023 (R-23-043, R-23-045, R-23-046): Deck Permit $173; the schedule has the rest
Electrical PermitIt dependsAny alteration of electrical wiring requires a permit. Residential low voltage (wired or wireless) work does not require a permit unless its cost exceeds $5,000 within any 12-month period. Repair or replacement of a wall switch or outlet device rated 20 amps and 120 volts or less does not require a permit.Manatee County Development Services Building Fee Schedule, effective 04/01/2023 (R-23-043, R-23-045, R-23-046): Electrical Express (Residential Only) $133
Fence PermitIt dependsMasonry fences, walls, and columns (residential and commercial) always require a building permit. Non-structural residential fences such as wood, chain link, and vinyl are exempt from a building permit when located on a one or two family lot that is not in a flood hazard area.Manatee County Development Services Building Fee Schedule, effective 04/01/2023 (R-23-043, R-23-045, R-23-046): Fence Commercial or Residential Structural $207
HVAC PermitIt dependsReplacement and new installation of air conditioners and ductwork require a mechanical permit. Replacement of a window air conditioning unit, and portable heating or cooling appliances, do not require a permit.See schedule
Patio PermitIt dependsA non-structural concrete or paver patio does not require a building permit. A concrete slab with footers requires a permit.Not published
Plumbing PermitIt dependsNew plumbing work such as re-piping, a new water service, a new or replacement sewer, and most water heater replacements require a permit. An electric to electric water heater changeout of the same size in the same location, and replacement of a plumbing fixture such as a toilet or faucet where no rough plumbing is changed, do not require a permit.See schedule
Pool PermitIt dependsSwimming pools require a building permit, including above ground pools that exceed 24 inches in height.Manatee County Development Services Building Fee Schedule, effective 04/01/2023 (R-23-043, R-23-045, R-23-046): Above Ground Pool/Spa Permit $100
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitIt dependsA prefabricated shed used as a tool/storage shed or playhouse is exempt from a building permit if its floor area does not exceed 120 square feet and it is not over 8 feet high, measured from mean roof height; zoning and flood regulations still apply regardless. Sheds exceeding that size, or not used for tool/storage/playhouse purposes, require a permit.Manatee County Development Services Building Fee Schedule, effective 04/01/2023 (R-23-043, R-23-045, R-23-046): Prefabricated Utility Shed $91
Solar PermitPermit requiredAny sizeManatee County Development Services Building Fee Schedule, effective 04/01/2023 (R-23-043, R-23-045, R-23-046): Solar Permit $127

Everything we have verified about permits in Manatee County