Pool Permit in Lee County, Florida
It depends
Sometimes, depending on the project
Building or renovating an in-ground or above-ground pool
Quick answer
Lee County requires a Residential Pool permit for construction or renovation of all in-ground pools and for above-ground pools with water depths of 24 or more inches intended for swimming or recreation. Applications are governed by the Florida Building Code 8th Edition (2023), Florida Statutes including 515.27 and 553.73, and Land Development Code sections including 34-1176 on swimming pools and 34-2194 on setbacks from bodies of water.

- Typical threshold
- All in-ground pool construction or renovation requires a permit; an above-ground pool requires a permit when its water depth is 24 inches or more.
- Issued by
- Lee County Community Development, Building and Permitting Services
- Phone
- 239-533-8329
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.
Compare pool builder quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
Pool size, height and setback rules in Lee County
- Setback
- A swimming pool must meet the street setbacks, the waterbody setbacks, and the same rear and side lot line setbacks as other residential accessory structures (Section 34-1174(d)). library.municode.com: land development code
- Setback
- On a waterfront lot, a pool no higher than three and one-half feet above grade that is fenced, or screened on at least three sides, may come no closer than five feet to a seawalled canal or seawalled natural water body, ten feet to a non-seawalled artificial water body, or 25 feet to a non-seawalled natural water body. library.municode.com: land development code
- Also required
- A pool raised more than three and one-half feet above grade must meet the setbacks for the house itself (outside a special flood hazard area), or, in a special flood hazard area, sit at or below the lowest permitted habitable floor elevation and keep a rear setback of at least ten feet. library.municode.com: land development code
- Also required
- A pool screen enclosure with opaque material above three and one-half feet from grade must meet the setbacks for the house; a roofed screen enclosure that is structurally part of the house must meet house setbacks (unless it has a nearly flat roof), and one that is not must meet accessory structure setbacks. library.municode.com: land development code
- Setback
- A platform for pool or air conditioning equipment may extend up to three feet into a side, rear or waterbody setback, as long as it does not block access for life safety equipment. library.municode.com: land development code
What your pool permit must meet in Florida
Florida residential pools are built under the Florida Building Code, Residential, 8th Edition (2023), which the Legislature requires to incorporate the safety-feature and barrier standards of the Residential Swimming Pool Safety Act (Florida Statutes Chapter 515).
- State law requires the Florida Building Code to uniformly implement the pool-safety statutes by including standards for residential swimming pool barriers, pool covers, latching devices, and door and window exit alarms (F.S. 553.73).
- A new residential pool must be built with at least one of five listed safety features, not necessarily a fence: a compliant barrier, an approved safety pool cover, exit alarms on doors and windows with access to the pool, self-closing self-latching doors, or a certified pool alarm (F.S. 515.27).
- If a barrier is used, it must be at least 4 feet high on the outside and may not have gaps, openings, indentations, or structural components that could let a young child crawl under, squeeze through, or climb over it, placed far enough from the water's edge that a child who gets past it does not immediately fall in (F.S. 515.29).
- Pool gates must open outward away from the pool, be self-closing, and have a self-latching device with its release mechanism on the pool side, positioned out of a young child's reach (F.S. 515.29).
- Where a removable mesh safety barrier is used, it must comply with ASTM F2286 and may not be installed on top of an above-ground or on-ground pool (FBC-R, 8th Edition change).
Based on Florida Statutes Chapter 515 (Residential Swimming Pool Safety Act, ss. 515.27, 515.29) as implemented by the Florida Building Code, Residential, 8th Edition (2023), Chapter 45. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.
What a pool permit costs in Lee County
- Fee schedule in force
- Official scheduleRead .
- Published in
- Fee schedule effective 2026-04-15:
$50 application fee and $35 technology fee per application plus an operational support fee;
residential pool plan review $35 initial, regulatory review $25, structural, electrical, and plumbing inspections $50 per required inspection.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Lee County compares in Florida
Across the Florida jurisdictions we have verified, the same threshold runs from 24 to 42, so a project that is exempt here may still need a permit one county over.
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Brevard County | It depends | Permits are issued for in-ground pools and spas, and for above-ground pools with a depth of 24 inches or greater. |
| Charlotte County | Permit required | This residential pool/spa permit type includes spas, swim spas, and above-ground pools that are 24 inches or greater in depth. |
| Hernando County | It depends | Manufactured pools less than 24 inches deep are exempt from a building permit |
| Lake County | It depends | Storable swimming or wading pools capable of holding water to a maximum depth of 42 inches, or pools with nonmetallic molded polymeric or inflatable fabric walls regardless of dimension, are exempt from a building permit except for non-cord-and-plug electrical work |
| Lee Countythis page | It depends | All in-ground pool construction or renovation requires a permit; an above-ground pool requires a permit when its water depth is 24 inches or more. |
| Leon County | Permit required | Applies to private residential swimming pools, hot tubs, or non-portable spas containing water over 24 inches deep. |
| Manatee County | It depends | Swimming pools require a building permit, including above ground pools that exceed 24 inches in height. |
How to apply in Lee County
General guide, not specific to this office
What a pool permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a pool permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Lee County Community Development, Building and Permitting Services
- 1500 Monroe St., Fort Myers, FL 33901
- Phone: 239-533-8329
- Email: econnect@leegov.com
Your Pool Permit checklist for Lee County
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: All in-ground pool construction or renovation requires a permit; an above-ground pool requires a permit when its water depth is 24 inches or more. Read the rule where we read it: leegov.com: Pool Guide.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Lee County permit portal.
- Keep the office details handy. Lee County Community Development, Building and Permitting Services. Phone: 239-533-8329. Email: econnect@leegov.com. Address: 1500 Monroe St., Fort Myers, FL 33901.
Compiled from the official sources on this page. Last checked .
Permitting activity in Lee County
In 2025, Lee County authorized permits for 13,547 new residential housing units (9,962 single-family, 3,585 in multi-family buildings), valued at $3.8B, down from 15,411 the year before. That works out to about 15.5 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 875,607.
What else needs a permit in Lee County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per application plus an operational support fee, for every permit type below. The fee column shows what differs by project.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Any size | Residential accessory structure plan review $35 to $50 initial, regulatory review $25, inspections $50 per required inspection at 2,500 sq ft work area or less |
| Electrical Permit | Permit required | Any size | Electrical trade plan review $35 initial, inspections $75 per record covering up to 2 inspections |
| Fence Permit | Permit required | Any size | Residential fence plan review $35 initial, regulatory review $25, structural inspections $50 per required inspection |
| HVAC Permit | Permit required | Portable HVAC equipment and replacement of any part that does not alter the equipment's approval or make it unsafe are exempt per Florida Building Code section 105.2. | Residential mechanical plan review $25 initial, inspections $75 per record covering up to 2 inspections |
| Patio Permit | It depends | A permit is required to construct, enlarge, alter, or repair a structure, including structural slabs, unenclosed structures, porches, and screen, glass, or vinyl rooms; the county refers residents to Florida Building Code 105.2 and Land Development Code 6-117 for work not requiring a permit. | See schedule |
| Plumbing Permit | Permit required | Any size | Residential plumbing plan review $25 initial, inspections $75 per record covering up to 2 inspections |
| Roof Replacement Permit | It depends | Under s. 553.79(1)(g) F.S., effective 2026-07-01, the county must exempt work on a single-family dwelling valued at less than $7,500 upon written request, but the exemption does not apply to structural, electrical, plumbing, mechanical, or gas work or to property in a flood hazard area. | Roofing plan review $25 initial, structural inspection $100, roofing fees assessed per structure |
| Shed Permit | Permit required | Any size | Residential accessory structure plan review $35 to $50 initial, regulatory review $25, inspections $50 per required inspection at 2,500 sq ft work area or less |
| Solar Permit | Permit required | Any size | Solar plan review $25 initial, regulatory review $25, ground or roof mounted PV inspections $50 per required inspection; the schedule has the rest |
Frequently asked questions
- Do you need a pool permit in Lee County?
- It depends on the project. All in-ground pool construction or renovation requires a permit; an above-ground pool requires a permit when its water depth is 24 inches or more. If you are unsure how that applies to your project, call the Lee County Community Development, Building and Permitting Services at 239-533-8329 before you start.
- How much does a pool permit cost in Lee County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the Lee County Community Development, Building and Permitting Services at 239-533-8329.
- Where do you apply for a pool permit in Lee County?
- You can apply through the Lee County permit portal or contact the Lee County Community Development, Building and Permitting Services directly. The links are listed on this page.
- Can a homeowner pull a pool permit themselves in Lee County?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Lee County applies this before you apply.
From the Library
Pool Permit in other Florida localities
Everything above, sourced
How this pool permit page for Lee County was verified. 4 official sources: leegov.com, leegov.com, leegov.com, leefl.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Lee County Community Development, Building and Permitting Services. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page