Florida

Building permits in Lee County, Florida

Of the 10 common home projects we have verified in Lee County, 7 need a permit outright and 3 depend on size or scope. Click any project for the full rule, fee, and how to apply.

By Mario Bailey Last checked · 4 official sources

Verified against official sources
Project types verified
10
in Lee County

Lee County Community Development, Building and Permitting Services

How to actually get a permit in Lee County

By Mario Bailey Last checked Read from 7 Lee County documents

Which jobs need a permit

Lee County requires a permit for any in-ground pool, and for an above-ground pool once its water depth reaches 24 inches. Florida’s HB 803 exemption may also apply: the county must waive the building permit for work under $7,500 on a single-family home once you file a written exemption request, unless the job is electrical, plumbing, structural, mechanical, or gas work or the property sits in a flood hazard area.

What the application actually asks for

Lee County calls a backyard shed a Residential Accessory Structure permit and a swimming pool a Residential Pool permit. The Shed and Deck Guide’s site plan needs all four lot corners, setbacks from every property line, and any body of water within 25 feet; the plans can be engineered drawings from a Florida design professional, a state-approved prefabricated shed with anchoring details, or one of the county’s master shed plans. The Pool Guide’s plot plan instead asks for lot size, setbacks to the front, side, and rear property lines, and the pool’s size, deck, steps, and equipment location. Every pool also needs a barrier, a fence, wall, or screen enclosure, and the guide says the barrier itself requires a separate enclosure or fence permit, not just the pool permit. Both also require a Notice of Commencement, recorded with the Clerk of Court, once project value passes $5,000; skipping it is what commonly holds up a permit.

How eConnect works, and who may skip it

A contractor must hold a state license registered with the county or a county-issued certificate of competency, and must apply through eConnect. Only an owner-builder may bring a paper application instead to the Public Works Building on Monroe Street, with an Owner-Builder Disclosure Statement. Registering for eConnect creates an account to pick the right record type, attach the required documents, and track the review under My Records. The county’s own aca.leegov.com address is currently down; if you only need to search an existing permit rather than apply for a new one, our guide to Lee County’s eConnect record search has the working address.

The fee, worked for a shed and for a pool

Every application opens with three charges: a $50 application fee, a $35 technology fee, and an operational support fee priced as a percentage of total review and inspection fees that can change with the county’s revenue and expenditure trends; no current rate is published. A shed’s plan review from there is $35 to $50 initial, its regulatory review is $25, and its structural, electrical, mechanical, and plumbing inspections each run $50 for a work area of 2,500 sq ft or less, though roofing inspections run $100 instead. A pool follows the same shape: plan review $35 initial, regulatory review $25, and structural, electrical, and plumbing inspections each $50 per required inspection.

Booking inspections and closing the permit

Once the permit is issued, inspections are requested through eConnect, by calling the Automated Inspection System at 239-533-8997, or by texting SelecTXT at 855-527-1863. The Shed and Deck Guide lists common inspections for a site-built shed, including Foundation/Footing, Floor/Slab, Tie Beam, Rough Framing, Insulation, Sheathing, Roof Dry In, Roof Final, and Final Shed; check the issued permit for the full list. A pre-manufactured shed’s list is shorter: Foundation, Floor/Slab, and Final Shed. A below-ground pool starts with a Foundation and Footing inspection, then a Pool Steel inspection paired with a bonding inspection requested together, then a Pool Deck inspection paired with a second bonding inspection, and closes with a Pool Final. Every one of these permits expires if it does not pass an inspection within 180 days of issuance. Once every required inspection passes, the permit is closed and the county issues the Certificate of Compliance or Certificate of Occupancy, both available through eConnect.

What Lee County does not publish

Neither guide says how many days a completeness check or a full plan review takes. The only deadline either one publishes runs the other way: once a reviewer rejects an application, the county gives the applicant 30 days to fix the listed problems and resubmit. The permit data behind this site leaves the processing-time field blank for both the shed and the pool.

Documents read for this section

Sources

Look up a permit in Lee County

Lee County permit records are public, and you can check a property's permit history by address or permit number online.

How to search Lee County permit records

What needs a permit in Lee County

Of the 10 common home projects we have verified in Lee County, 7 need a permit outright and 3 depend on size or scope. Click any project for the full rule, fee, and how to apply.

Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per application plus an operational support fee, for every permit type below. The fee column shows what differs by project.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeResidential accessory structure plan review $35 to $50 initial, regulatory review $25...
Electrical PermitPermit requiredAny sizeElectrical trade plan review $35 initial, inspections $75 per record covering up to 2...
Fence PermitPermit requiredAny sizeResidential fence plan review $35 initial, regulatory review $25, structural inspections...
HVAC PermitPermit requiredPortable HVAC equipment and replacement of any part that does not alter the equipment's approval or make it unsafe are exempt per Florida Building Code section 105.2.Residential mechanical plan review $25 initial, inspections $75 per record covering up...
Patio PermitIt dependsA permit is required to construct, enlarge, alter, or repair a structure, including structural slabs, unenclosed structures, porches, and screen, glass, or vinyl rooms; the county refers residents to Florida Building Code 105.2 and Land Development Code 6-117 for work not requiring a permit.See schedule
Plumbing PermitPermit requiredAny sizeResidential plumbing plan review $25 initial, inspections $75 per record covering up to...
Pool PermitIt dependsAll in-ground pool construction or renovation requires a permit; an above-ground pool requires a permit when its water depth is 24 inches or more.Residential pool plan review $35 initial, regulatory review $25, structural, electrical...
Roof Replacement PermitIt dependsUnder s. 553.79(1)(g) F.S., effective 2026-07-01, the county must exempt work on a single-family dwelling valued at less than $7,500 upon written request, but the exemption does not apply to structural, electrical, plumbing, mechanical, or gas work or to property in a flood hazard area.Roofing plan review $25 initial, structural inspection $100, roofing fees assessed per...
Shed PermitPermit requiredAny sizeResidential accessory structure plan review $35 to $50 initial, regulatory review $25...
Solar PermitPermit requiredAny sizeSolar plan review $25 initial, regulatory review $25, ground or roof mounted PV...

What you can build in Lee County

Planning a project in Lee County?

Hire it out

Sponsored

Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.

Compare local contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

Planning several things at once? Check your whole project

Lee County permit fees compared with nearby Florida localities

Florida locality Deck PermitHVAC PermitElectrical Permit
Lee County Residential accessory structure plan review $35 to $50... Residential mechanical plan review $25 initial... Electrical trade plan review $35 initial, inspections $75...
Alachua County No deck-specific flat fee is published Flat fee: Res Mechanical Alt/Repair $110.00, per the... No electrical-specific flat fee is published
Brevard County Not published ...fee table lists a Building Code Review fee of $75.00... ...fee table lists a Building Code Review fee of $75.00...
Broward County ...the Structural permit schedule, the greater of a $125... ...and ventilation) permit is the greater of a $125... Electrical permit is the greater of a $125 minimum base...

Each cell is the opening clause of that Florida jurisdiction's own fee schedule; the full wording and source sit on each permit page.

Lee County permit questions, answered from the data

Do you need a permit in Lee County?
For most projects, yes. Of the 10 permit types we have verified for Lee County, 7 always require a permit (for example a deck permit), 3 depend on size or scope (a patio permit, for instance). Each Lee County permit type's page states the exact rule and its source.
How much does a permit cost in Lee County?
Lee County publishes a fee for 10 of the 10 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by Lee County Community Development, Building and Permitting Services; we do not estimate or mark them up.
Where do you apply for a permit in Lee County?
Lee County Community Development, Building and Permitting Services issues permits in Lee County, with an online portal for applications, plan uploads and status checks, and takes questions at 239-533-8329. The Lee County official page and portal are linked in the office section above.

How the Lee County pages were verified. 10 permit types, 14 distinct official sources, most recently checked . Every rule is read from Lee County Community Development, Building and Permitting Services or the applicable code and cited on its page; anything we could not confirm for Lee County is marked rather than estimated. How we verify.

Permitting activity in Lee County

In 2025, Lee County authorized permits for 13,547 new residential housing units (9,962 single-family, 3,585 in multi-family buildings), valued at $3.8B , down from 15,411 the year before. That works out to about 15.5 permits per 1,000 residents. It is a useful gauge of how busy the local permit office is.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 875,607.

From the Library

Other permit offices in Florida