Florida / Lee County

Electrical Permit in Lee County, Florida

By Mario Bailey Last checked 2026-07-19 · 4 official sources

Verified against official sources Confirmed on official page

Permit required

Quick answer

Lee County requires an Electric Trade permit when any new electrical circuits are added or extended or when service is changed. A design professional is required for residential electrical work valued at more than $125,000 or with an aggregate service capacity of 600 amperes at 240 volts or more. Electrical work is expressly excluded from the $7,500 residential permit exemption in s. 553.79(1)(g) F.S.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Lee County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

Adding or extending circuits or changing electrical service

What electrical permit costs in Lee County

Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per application plus an operational support fee; electrical trade plan review $35 initial, inspections $75 per record covering up to 2 inspections.

Official fee schedule

How Lee County compares in Florida

No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Broward CountyPermit requiredElectrical permit is the greater of a $125 minimum base fee or 3.0% of job va...
Hillsborough CountyPermit requiredResidential Electrical (General) trade permit fee is $130 flat for inspection...
Lee Countythis pagePermit requiredFee schedule effective 2026-04-15: $50 application fee and $35 technology fee...
Miami-Dade CountyPermit requiredResidential wiring for new construction, additions, repairs and alterations i...
Orange CountyPermit requiredMinimum Electrical Permit fee is $38 flat, scaling with service amperage for...
Palm Beach CountyPermit requiredCharged by value of construction with a $75 minimum, per the PZB Building Div...
Pasco CountyIt dependsBase fee $45;

How to apply in Lee County

In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.

What most electrical permit applications include:

  • Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
  • The written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
  • The application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
  • Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
  • Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).

General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. Lee County Community Development, Building and Permitting Services sets the exact checklist for Lee County.

Where to apply in Lee County:

Lee County Community Development, Building and Permitting Services

Inspections and closing out your permit

Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.

  1. A rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
  2. The framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
  3. Ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
  4. Arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
  5. Panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
  6. The service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
  7. A final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Lee County permit portal or by phone at 239-533-8329.

Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a electrical permit in Lee County?
Lee County requires an Electric Trade permit when any new electrical circuits are added or extended or when service is changed. A design professional is required for residential electrical work valued at more than $125,000 or with an aggregate service capacity of 600 amperes at 240 volts or more. Electrical work is expressly excluded from the $7,500 residential permit exemption in s. 553.79(1)(g) F.S. Always confirm with the Lee County Community Development, Building and Permitting Services before starting.
How much does a electrical permit cost in Lee County?
Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per application plus an operational support fee; electrical trade plan review $35 initial, inspections $75 per record covering up to 2 inspections. See the official fee schedule for current amounts.
Where do you apply for a electrical permit in Lee County?
You can apply through the Lee County permit portal or contact the Lee County Community Development, Building and Permitting Services directly. The links are listed on this page.

From the Library

What else needs a permit in Lee County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedFee schedule effective 2026-04-15: $50 application fee and $35 technology fee per appli...
Fence PermitPermit requiredNot specifiedFee schedule effective 2026-04-15: $50 application fee and $35 technology fee per appli...
HVAC PermitPermit requiredPortable HVAC equipment and replacement of any part that does not alter the equipment's approval or make it unsafe are exempt per Florida Building Code section 105.2.Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per appli...
Patio PermitIt dependsA permit is required to construct, enlarge, alter, or repair a structure, including structural slabs, unenclosed structures, porches, and screen, glass, or vinyl rooms; the county refers residents to Florida Building Code 105.2 and Land Development Code 6-117 for work not requiring a permit.Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per appli...
Plumbing PermitPermit requiredNot specifiedFee schedule effective 2026-04-15: $50 application fee and $35 technology fee per appli...
Pool PermitIt dependsAll in-ground pool construction or renovation requires a permit; an above-ground pool requires a permit when its water depth is 24 inches or more.Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per appli...
Roof Replacement PermitIt dependsUnder s. 553.79(1)(g) F.S., effective 2026-07-01, the county must exempt work on a single-family dwelling valued at less than $7,500 upon written request, but the exemption does not apply to structural, electrical, plumbing, mechanical, or gas work or to property in a flood hazard area.Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per appli...
Shed PermitPermit requiredNot specifiedFee schedule effective 2026-04-15: $50 application fee and $35 technology fee per appli...
Solar PermitPermit requiredNot specifiedFee schedule effective 2026-04-15: $50 application fee and $35 technology fee per appli...

Electrical Permit in other Florida localities

Official sources

Verified by a person against the sources above on 2026-07-19, not confirmed with Lee County Community Development, Building and Permitting Services. Rules change; confirm before you build. How we verify.

Last checked: 2026-07-19Report an error on this page