Florida / Lee County

Plumbing Permit in Lee County, Florida

By Mario Bailey Last checked 2026-07-19 · 4 official sources

Verified against official sources Confirmed on official page

Permit required

Quick answer

Lee County requires a Plumbing permit for the installation, replacement, or relocation of plumbing fixtures or the sewer connections. A separate Irrigation permit is required to install lawn irrigation that connects to a potable water source. Plumbing work is expressly excluded from the $7,500 residential permit exemption in s. 553.79(1)(g) F.S.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Lee County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

Installing, replacing, or relocating fixtures or sewer connections

What plumbing permit costs in Lee County

Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per application plus an operational support fee; residential plumbing plan review $25 initial, inspections $75 per record covering up to 2 inspections.

Official fee schedule

How Lee County compares in Florida

No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Broward CountyPermit requiredPlumbing permit is the greater of a $125 minimum base fee or 3.0% of job valu...
Hillsborough CountyPermit requiredResidential Plumbing (General) trade permit fee is $130 flat, inspection-only...
Lee Countythis pagePermit requiredFee schedule effective 2026-04-15: $50 application fee and $35 technology fee...
Miami-Dade CountyPermit requiredSingle family plumbing for new construction, additions or alterations is $0.1...
Orange CountyPermit requiredBase Plumbing Permit fee for new construction, addition or alteration is $75...
Palm Beach CountyPermit requiredCharged by value of construction with a $75 minimum, per the PZB Building Div...
Pasco CountyIt dependsBase fee $45;

How to apply in Lee County

You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.

What most plumbing permit applications include:

  • A permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
  • The application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
  • Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
  • Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
  • Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).

General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. Lee County Community Development, Building and Permitting Services sets the exact checklist for Lee County.

Where to apply in Lee County:

Lee County Community Development, Building and Permitting Services

Inspections and closing out your permit

Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.

  1. Piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
  2. Rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
  3. Rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
  4. The water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
  5. The framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
  6. At the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
  7. Final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Lee County permit portal or by phone at 239-533-8329.

Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a plumbing permit in Lee County?
Lee County requires a Plumbing permit for the installation, replacement, or relocation of plumbing fixtures or the sewer connections. A separate Irrigation permit is required to install lawn irrigation that connects to a potable water source. Plumbing work is expressly excluded from the $7,500 residential permit exemption in s. 553.79(1)(g) F.S. Always confirm with the Lee County Community Development, Building and Permitting Services before starting.
How much does a plumbing permit cost in Lee County?
Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per application plus an operational support fee; residential plumbing plan review $25 initial, inspections $75 per record covering up to 2 inspections. See the official fee schedule for current amounts.
Where do you apply for a plumbing permit in Lee County?
You can apply through the Lee County permit portal or contact the Lee County Community Development, Building and Permitting Services directly. The links are listed on this page.

From the Library

What else needs a permit in Lee County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedFee schedule effective 2026-04-15: $50 application fee and $35 technology fee per appli...
Electrical PermitPermit requiredNot specifiedFee schedule effective 2026-04-15: $50 application fee and $35 technology fee per appli...
Fence PermitPermit requiredNot specifiedFee schedule effective 2026-04-15: $50 application fee and $35 technology fee per appli...
HVAC PermitPermit requiredPortable HVAC equipment and replacement of any part that does not alter the equipment's approval or make it unsafe are exempt per Florida Building Code section 105.2.Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per appli...
Patio PermitIt dependsA permit is required to construct, enlarge, alter, or repair a structure, including structural slabs, unenclosed structures, porches, and screen, glass, or vinyl rooms; the county refers residents to Florida Building Code 105.2 and Land Development Code 6-117 for work not requiring a permit.Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per appli...
Pool PermitIt dependsAll in-ground pool construction or renovation requires a permit; an above-ground pool requires a permit when its water depth is 24 inches or more.Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per appli...
Roof Replacement PermitIt dependsUnder s. 553.79(1)(g) F.S., effective 2026-07-01, the county must exempt work on a single-family dwelling valued at less than $7,500 upon written request, but the exemption does not apply to structural, electrical, plumbing, mechanical, or gas work or to property in a flood hazard area.Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per appli...
Shed PermitPermit requiredNot specifiedFee schedule effective 2026-04-15: $50 application fee and $35 technology fee per appli...
Solar PermitPermit requiredNot specifiedFee schedule effective 2026-04-15: $50 application fee and $35 technology fee per appli...

Plumbing Permit in other Florida localities

Official sources

Verified by a person against the sources above on 2026-07-19, not confirmed with Lee County Community Development, Building and Permitting Services. Rules change; confirm before you build. How we verify.

Last checked: 2026-07-19Report an error on this page

Compare Plumbing Permit requirements across Florida localities