Plumbing Permit in Lee County, Florida
Permit required
Yes, a permit is required
Installing, replacing, or relocating fixtures or sewer connections
Issued byLee County Community Development, Building and Permitting Services
By Mario Bailey, verified against official sources
Quick answer
Lee County requires a Plumbing permit for the installation, replacement, or relocation of plumbing fixtures or the sewer connections. A separate Irrigation permit is required to install lawn irrigation that connects to a potable water source. Plumbing work is expressly excluded from the $7,500 residential permit exemption in s. 553.79(1)(g) F.S.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Plumbing permits are usually pulled by the plumber doing the job. If you are still choosing one, compare a few quotes first.
Compare plumber quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Installing, replacing, or relocating fixtures or sewer connections
What a plumbing permit costs in Lee County
How Lee County compares in Florida
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Alachua County | Permit required | Not specified |
| Brevard County | It depends | Permits are required for the installation or replacement of water, sewer, or gas piping and systems; this does not include changing like-for-like water heaters or fixtures such as sinks. |
| Broward County | Permit required | Not specified |
| Charlotte County | Permit required | Not specified |
| Clay County | Permit required | Not specified |
| Collier County | Permit required | Permits shall not be required for the following: ... Plumbing: 1. Repair work performed by licensed plumbing contractors that does not exceed $1,500.00 in value of materials and labor. [Followed by 16 specific exempted repairs/replacements, e.g. faucets, water closets, sinks, garbage disposals, dishwashers, and like-for-like electric water heaters up to 52-gallon capacity.] |
| Lee Countythis page | Permit required | Not specified |
How to apply in Lee County
In Lee County, you apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.
What most plumbing permit applications include:
- For Lee County, a permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
- For Lee County, the application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
- Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
- Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
- Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).
General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. Lee County Community Development, Building and Permitting Services sets the exact checklist for Lee County.
Where to apply in Lee County:
Lee County Community Development, Building and Permitting Services
- 1500 Monroe St., Fort Myers, FL 33901
- Phone: 239-533-8329
- Email: econnect@leegov.com
Plumbing Permit in Lee County compared with nearby Florida localities
| Locality | Permit needed? | Threshold | What each Florida schedule says | Verified |
|---|---|---|---|---|
| Lee County | Permit required | Not specified | Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per... | |
| Alachua County | Permit required | Not specified | No plumbing-specific flat fee is published | |
| Brevard County | It depends | Permits are required for the installation or replacement of water, sewer, or gas piping and systems; this does not include changing like-for-like water heaters or fixtures such as sinks. | Brevard's Residential Plumbing Permit Application fee table lists a Building Code Review... | |
| Broward County | Permit required | Not specified | Plumbing permit is the greater of a $125 minimum base fee or 3.0% of job value, per... | |
| Charlotte County | Permit required | Not specified | At application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation... |
Inspections and closing out your permit
In Lee County, plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
- In Lee County: piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
- In Lee County: rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
- In Lee County: rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
- In Lee County: the water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
- In Lee County: the framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
- In Lee County: at the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
- In Lee County: final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Lee County permit portal or by phone at 239-533-8329.
Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Plumbing Permit checklist for Lee County
- Confirm the requirement. Yes, a permit is required. Usually needed: Installing, replacing, or relocating fixtures or sewer connections.
- Budget the fee. Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per application plus an operational support fee; residential plumbing plan review $25 initial, inspections $75 per record covering up to 2 inspections. Official fee schedule.
- Apply. In Lee County, you apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit. Start at the Lee County permit portal.
- Keep the office details handy. Lee County Community Development, Building and Permitting Services. Phone: 239-533-8329. Address: 1500 Monroe St., Fort Myers, FL 33901.
- Plan for inspections. In Lee County, plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a plumbing permit in Lee County?
- Lee County requires a Plumbing permit for the installation, replacement, or relocation of plumbing fixtures or the sewer connections. A separate Irrigation permit is required to install lawn irrigation that connects to a potable water source. Plumbing work is expressly excluded from the $7,500 residential permit exemption in s. 553.79(1)(g) F.S. Always confirm with the Lee County Community Development, Building and Permitting Services before starting.
- How much does a plumbing permit cost in Lee County?
- Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per application plus an operational support fee; residential plumbing plan review $25 initial, inspections $75 per record covering up to 2 inspections. See the official fee schedule for current amounts.
- Where do you apply for a plumbing permit in Lee County?
- You can apply through the Lee County permit portal or contact the Lee County Community Development, Building and Permitting Services directly. The links are listed on this page.
- Can a homeowner pull a plumbing permit themselves in Lee County?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Lee County applies this before you apply.
From the Library
What else needs a permit in Lee County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee per application plus an operational support fee, for every permit type below. The fee column shows what differs by project.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Not specified | Residential accessory structure plan review $35 to $50 initial, regulatory review $25... |
| Electrical Permit | Permit required | Not specified | Electrical trade plan review $35 initial, inspections $75 per record covering up to 2... |
| Fence Permit | Permit required | Not specified | Residential fence plan review $35 initial, regulatory review $25, structural inspections... |
| HVAC Permit | Permit required | Portable HVAC equipment and replacement of any part that does not alter the equipment's approval or make it unsafe are exempt per Florida Building Code section 105.2. | Residential mechanical plan review $25 initial, inspections $75 per record covering up... |
| Patio Permit | It depends | A permit is required to construct, enlarge, alter, or repair a structure, including structural slabs, unenclosed structures, porches, and screen, glass, or vinyl rooms; the county refers residents to Florida Building Code 105.2 and Land Development Code 6-117 for work not requiring a permit. | Fees follow the residential accessory structure table when the patio is permitted as an... |
| Pool Permit | It depends | All in-ground pool construction or renovation requires a permit; an above-ground pool requires a permit when its water depth is 24 inches or more. | Residential pool plan review $35 initial, regulatory review $25, structural, electrical... |
| Roof Replacement Permit | It depends | Under s. 553.79(1)(g) F.S., effective 2026-07-01, the county must exempt work on a single-family dwelling valued at less than $7,500 upon written request, but the exemption does not apply to structural, electrical, plumbing, mechanical, or gas work or to property in a flood hazard area. | Roofing plan review $25 initial, structural inspection $100, roofing fees assessed per... |
| Shed Permit | Permit required | Not specified | Residential accessory structure plan review $35 to $50 initial, regulatory review $25... |
| Solar Permit | Permit required | Not specified | Solar plan review $25 initial, regulatory review $25, ground or roof mounted PV... |
Plumbing Permit in other Florida localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Lee County documents; the office above sets the local rules.
How this plumbing permit page for Lee County was verified. 4 official sources: leegov.com, leegov.com, leegov.com, flsenate.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Lee County Community Development, Building and Permitting Services. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Plumbing Permit requirements across Florida localities
Permit office
Lee County Community Development, Building and Permitting Services
239-533-8329Permit portalFlorida rule changes
- Broward County, FL updates building permit fee schedule (Ordinance 2025-038)
Ord. 2025-038 ·
- Florida waives permits for small single-family jobs under $7,500 (HB 803)
ch. 2026-63 (HB 803), F.S. 553.79 ·