Pool Permit in Bellevue, Washington
It depends
Sometimes, depending on the project
Before installing any swimming pool over 24 inches deep in Bellevue
Issued byCity of Bellevue Development Services
By Mario Bailey, verified against official sources
Quick answer
In Bellevue a permit with plan review is required for installing a swimming pool over 24 inches deep. Prefabricated above-ground pools 24 inches or less may not require a building permit; confirm with Development Services before proceeding. Pool fencing and barrier requirements apply regardless of permit status. Submit applications through MyBuildingPermit.com.
Typical threshold: swimming pools over 24 inches deep require a permit with plan review; above-ground pools 24 inches or less may be exempt.

Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.
Compare pool builder quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before installing any swimming pool over 24 inches deep in Bellevue
What your pool permit must meet in Washington
Washington's 2021 Residential Code (WAC 51-51, effective statewide March 15, 2024) requires backyard swimming pools, spas, and hot tubs at single-family and duplex homes to be designed and built to the 2021 International Swimming Pool and Spa Code, incorporated by direct statewide reference rather than left to local option.
- The design and construction of swimming pools, spas, and other aquatic recreation facilities must comply with the 2021 International Swimming Pool and Spa Code whenever the facility falls into one of three defined residential categories (WAC 51-51-0327).
- That mandatory ISPSC standard covers pools for the sole use of a single-family dwelling's residents and guests, the sole use of a resident-owned duplex, or a facility used exclusively for medical physical therapy under a licensed practitioner's supervision (WAC 51-51-0327).
- Any other water recreation facility outside those residential categories is regulated under separate Washington Department of Health rules, not the Residential Code (WAC 246-260; WAC 51-50-3109).
Based on 2021 International Swimming Pool and Spa Code (ISPSC), incorporated by WAC 51-51-0327 into the 2021 Washington State Residential Code. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.
What a pool permit costs in Bellevue
How Bellevue compares in Washington
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Bellevuethis page | It depends | swimming pools over 24 inches deep require a permit with plan review; above-ground pools 24 inches or less may be exempt |
| Clark County | It depends | A permit is required for any structure intended for swimming or recreational bathing that contains water over 24 inches deep, including in-ground, aboveground and on-ground pools, hot tubs and spas. |
| King County | It depends | prefabricated above-ground pools less than 24 inches deep and not exceeding 5000 gallons are exempt; all other pools require a building permit in unincorporated King County |
| Pierce County | It depends | Prefabricated swimming pools accessory to a single family residence (Group R-3 occupancy) are exempt if less than 24 inches deep, with no separate gallon volume cap; in-ground pools and pools 24 inches deep or deeper require a building permit. Self-contained spas and hot tubs installed entirely above ground and not connected to the potable water system or a septic or sewer drain are separately exempt regardless of depth. |
| Snohomish County | It depends | prefabricated swimming pools regulated under the IRC (one- and two-family dwellings) exempt if less than 24 inches deep, with no gallon-volume cap; in-ground pools or pools 24 inches deep or more require a building permit |
| Tacoma | It depends | prefabricated above-ground pools less than 24 inches deep and not greater than 5000 gallons are exempt; all other pools require a building permit |
| Thurston County | It depends | Pools are exempt only if prefabricated, entirely above ground, less than 24 inches deep, and under 5,000 gallons capacity. |
Closest pool permit thresholds outside Washington
Jurisdictions we cover whose limit sits nearest Bellevue's 24 inches.
- Brevard County, Florida, Permits are issued for in-ground pools and spas, and for above-ground pools with a depth of 24 inches or greater.
- Charlotte County, Florida, This residential pool/spa permit type includes spas, swim spas, and above-ground pools that are 24 inches or greater in depth.
- Hernando County, Florida, Manufactured pools less than 24 inches deep are exempt from a building permit
- Lee County, Florida, All in-ground pool construction or renovation requires a permit; an above-ground pool requires a permit when its water depth is 24 inches or more.
How to apply in Bellevue
In Bellevue, a residential pool permit application covers both construction and safety: a scaled site plan, structural plans for the pool, a barrier plan showing how the pool will be enclosed, and an electrical plan covering bonding and the equipment disconnect.
What most pool permit applications include:
- Pool and spa design and construction fall under the residential code chapter that folds in the swimming pool and spa code, and permit review checks plans against that chapter (IRC R326).
- For Bellevue, the site plan must show pool equipment such as pumps, filters, and heaters set back at least 36 inches from the outside of the required barrier (ISPSC 305.2.9).
- For an in-ground pool, engineered structural plans covering the shell and reinforcing steel, with the responsible structural engineer's license information, are a standard part of the submittal (per official pool submittal checklists).
- For Bellevue, a barrier plan identifying the fence, pool structure, or dwelling wall that will enclose the pool must be submitted and must comply with the code's barrier chapter (ISPSC 305).
- Electrical plans must show the pool's equipotential bonding design, since the shell, perimeter surfaces, and metal fittings within 5 feet of the water must all tie into a common bonding grid (NEC 680.26).
- For Bellevue, the electrical plan must also show a disconnecting means for the pool equipment that is readily accessible and within sight of the equipment (NEC 680.13).
General submittal guidance from 2021 IRC R326 (adopting the ISPSC), ISPSC 2021 Section 305, and NEC 2020 Article 680. Source. City of Bellevue Development Services sets the exact checklist for Bellevue.
Where to apply in Bellevue:
City of Bellevue Development Services
- 450 110th Ave NE, Bellevue, WA 98004
- Phone: (425) 452-4898
- Email: permits@bellevuewa.gov
Pool Permit in Bellevue compared with nearby Washington localities
| Locality | Permit needed? | Threshold | What each Washington schedule says | Verified |
|---|---|---|---|---|
| Bellevue | It depends | swimming pools over 24 inches deep require a permit with plan review; above-ground pools 24 inches or less may be exempt | Pool equipment electrical inspection fee of $94 without plan review per Table 7 of... | |
| Clark County | It depends | A permit is required for any structure intended for swimming or recreational bathing that contains water over 24 inches deep, including in-ground, aboveground and on-ground pools, hot tubs and spas. | Fees are established by county ordinance and calculated automatically during the... | |
| King County | It depends | prefabricated above-ground pools less than 24 inches deep and not exceeding 5000 gallons are exempt; all other pools require a building permit in unincorporated King County | Most permit fees increased approximately 14% on January 1 2026 plus a $126 application... | |
| Pierce County | It depends | Prefabricated swimming pools accessory to a single family residence (Group R-3 occupancy) are exempt if less than 24 inches deep, with no separate gallon volume cap; in-ground pools and pools 24 inches deep or deeper require a building permit. Self-contained spas and hot tubs installed entirely above ground and not connected to the potable water system or a septic or sewer drain are separately exempt regardless of depth. | Where a permit is required: in-ground pool permit $230.00 | |
| Seattle | Permit required | Not specified | An unenclosed pool accessory to a single-family or duplex home is a flat fee of four... |
Inspections and closing out your permit
In Bellevue, pool inspections track the concrete pour: the steel and bonding grid are checked before gunite or shotcrete goes in, bonding is checked again before decking is poured, and the permanent barrier and remaining electrical work are checked at final before the pool can be filled and used.
- In Bellevue: before gunite or shotcrete is sprayed, the inspector checks the rebar against the engineered plans and confirms the equipotential bonding wire is stubbed out and tied into the steel, since it will be buried in concrete afterward (NEC 680.26).
- In Bellevue: a bonding inspection separately confirms coping, decking, ladders, handrail cups, and any other metal within 5 feet of the water are tied to the bonding grid, and it must pass before coping is installed (NEC 680.26).
- In Bellevue: a temporary barrier at least 4 feet high must enclose the site from the moment excavation starts until the permanent barrier is finished, and inspectors check for it throughout construction (ISPSC 305.1.1).
- In Bellevue: a pre-plaster inspection confirms the circulation equipment's electrical work is installed and all bonding is complete before the pool's interior finish goes on (NEC 680.26).
- In Bellevue: at final inspection the permanent barrier is checked against the code's requirements and the equipment and cover-mechanism bonding must be complete before the pool can be filled and used (ISPSC 305, NEC 680.26).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Bellevue permit portal or by phone at (425) 452-4898.
Inspection sequence from NEC 2020 Article 680.26 (equipotential bonding) and ISPSC 2021 Section 305 (barriers). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Pool Permit checklist for Bellevue
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: swimming pools over 24 inches deep require a permit with plan review; above-ground pools 24 inches or less may be exempt. Usually needed: Before installing any swimming pool over 24 inches deep in Bellevue.
- Budget the fee. Pool equipment electrical inspection fee of $94 without plan review per Table 7 of Ordinance 6879; the pool structure itself is a building permit by valuation under Table 4 plus a $25 state building code fee, effective 2026-01-01. Official fee schedule.
- Apply. In Bellevue, a residential pool permit application covers both construction and safety: a scaled site plan, structural plans for the pool, a barrier plan showing how the pool will be enclosed, and an electrical plan covering bonding and the equipment disconnect. Start at the Bellevue permit portal.
- Keep the office details handy. City of Bellevue Development Services. Phone: (425) 452-4898. Address: 450 110th Ave NE, Bellevue, WA 98004.
- Plan for inspections. In Bellevue, pool inspections track the concrete pour: the steel and bonding grid are checked before gunite or shotcrete goes in, bonding is checked again before decking is poured, and the permanent barrier and remaining electrical work are checked at final before the pool can be filled and used.
Compiled from the official sources on this page. Last checked .
Permitting activity in Bellevue
In 2024, Bellevue authorized permits for 589 new residential housing units (254 single-family, 335 in multi-family buildings), valued at $274M, down from 802 the year before. That works out to about 4 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 148,073.
About Bellevue
Bellevue has about 65,536 housing units. The median home is valued at $1,203,100, against a median household income of $161,300. About 52% of homes are owner-occupied, and the typical home was built around 1981.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
Frequently asked questions
- Do you need a pool permit in Bellevue?
- In Bellevue a permit with plan review is required for installing a swimming pool over 24 inches deep. Prefabricated above-ground pools 24 inches or less may not require a building permit; confirm with Development Services before proceeding. Pool fencing and barrier requirements apply regardless of permit status. Submit applications through MyBuildingPermit.com. Swimming pools over 24 inches deep require a permit with plan review; above-ground pools 24 inches or less may be exempt. Always confirm with the office before starting.
- How much does a pool permit cost in Bellevue?
- Pool equipment electrical inspection fee of $94 without plan review per Table 7 of Ordinance 6879; the pool structure itself is a building permit by valuation under Table 4 plus a $25 state building code fee, effective 2026-01-01. See the official fee schedule for current amounts.
- Where do you apply for a pool permit in Bellevue?
- You can apply through the Bellevue permit portal or contact the City of Bellevue Development Services directly. The links are listed on this page.
- Can a homeowner pull a pool permit themselves in Bellevue?
- Under Washington law (RCW 18.27.090(11), (12); RCW 19.28.261(1); RCW 18.106.150(1)): Washington lets homeowners do their own construction work, including the licensed trades, on property they own. RCW 18.27.090(12) exempts any person working on his or her own property from contractor registration, but the exemption does not apply if you do contractor type work for the purpose of selling, demolishing, or leasing the property, and the separate owner exemption in RCW 18.27.090(11) is lost if you sell or lease improved property owned less than 12 months. For electrical work, RCW 19.28.261 lets you wire your own residence, farm, or place of business without an electrician license, unless the work is on construction of a new building intended for rent, sale, or lease, or on property offered for sale within 12 months after you obtained it. RCW 18.106.150(1) gives the same kind of exemption for plumbing work at your own residence, farm, or place of business. These exemptions waive the license, not the permit: an owner doing electrical work still buys an L&I electrical work permit and passes inspection (WAC 296-46B-901), and building and plumbing permits still come from your local building department. Confirm how Bellevue applies this before you apply.
From the Library
What else needs a permit in Bellevue
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | decks where the highest walking surface is 30 inches or less above grade do not require a permit; decks over 30 inches above grade require a permit with plan review | Building permit fee by valuation per Table 4 of Ordinance 6879, $44 inspection fee... |
| Electrical Permit | Permit required | Not specified | Electrical permit fee by valuation per Table 6 of Ordinance 6879, $79 inspection fee... |
| Fence Permit | It depends | fences over 8 feet in height require a building permit; fences 8 feet or under do not require a permit | No separate fence line item |
| HVAC Permit | Permit required | Not specified | Flat single-family mechanical inspection fees per Table 8 of Ordinance 6879: furnace up... |
| Patio Permit | No permit needed | Not specified | No separate patio line item |
| Plumbing Permit | It depends | permit required for new plumbing, concealed piping, and fixture additions; replacing a sink toilet or faucet not concealed in a wall does not require a permit | Plumbing permit fee per Table 11 of Ordinance 6879, $50 for the first fixture plus... |
| Roof Replacement Permit | It depends | permit required when modifying or replacing the roof sheathing or making structural changes; simple shingle replacement may not require a permit | Flat Re-roof Permit inspection fee of $290 due at issuance per Table 5 of Ordinance... |
| Shed Permit | It depends | detached storage sheds playhouses or gazebos with a floor area of 200 square feet or less do not require a building permit; structures over 200 square feet require a permit | No separate shed line item |
| Solar Permit | It depends | electrical permit required for all solar systems; building permit not required for rooftop single-family systems with dead load under 3.5 lbs per sq ft and panels no more than 18 inches above roof surface | Solar panel installations are electrical permits with fee by valuation per Table 6 of... |
Pool Permit in other Washington localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Bellevue documents; the office above sets the local rules.
How this pool permit page for Bellevue was verified. 1 official source: bellevuewa.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Bellevue Development Services. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Pool Permit requirements across Washington localities