Plumbing Permit in Bellevue, Washington
By Mario Bailey Last checked 2026-06-18 · 2 official sources
Verified against official sources Confirmed on official pageIt depends
Quick answer
A plumbing permit is required in Bellevue for new plumbing installations, altering concealed piping, and replacing major fixtures such as water heaters. Replacing a sink, toilet, or faucet not concealed in a wall does not require a permit. Permits without plan review can be issued the same day. Submit applications through MyBuildingPermit.com.
Typical threshold: permit required for new plumbing, concealed piping, and fixture additions; replacing a sink toilet or faucet not concealed in a wall does not require a permit.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help
Tell us where your project stands. Free to ask; no obligation.
Where we have a vetted local pro who handles permits in Bellevue, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.
When a permit is usually needed
Before adding new plumbing, altering concealed piping, or replacing major fixtures in Bellevue
What plumbing permit costs in Bellevue
Plumbing permit fee per Table 11 of Ordinance 6879, $50 for the first fixture plus $17.34 for each additional fixture, plus separate piping fees starting at $46 for pipe up to 1 inch, effective 2026-01-01.
How Bellevue compares in Washington
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Bellevuethis page | It depends | permit required for new plumbing, concealed piping, and fixture additions; replacing a sink toilet or faucet not concealed in a wall does not require a permit |
| Clark County | Permit required | A plumbing permit is required for installation of any plumbing fixtures, including water heaters, toilets and sinks. |
| King County | Permit required | Not specified |
| Pierce County | Permit required | Not specified |
| Seattle | Permit required | Not specified |
| Snohomish County | Permit required | Not specified |
| Tacoma | Permit required | Not specified |
How to apply in Bellevue
You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.
What most plumbing permit applications include:
- A permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
- The application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
- Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
- Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
- Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).
General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. City of Bellevue Development Services sets the exact checklist for Bellevue.
Where to apply in Bellevue:
City of Bellevue Development Services
- 450 110th Ave NE, Bellevue, WA 98004
- Phone: (425) 452-6873
- Email: MEPreview@bellevuewa.gov
Inspections and closing out your permit
Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
- Piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
- Rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
- Rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
- The water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
- The framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
- At the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
- Final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Bellevue permit portal or by phone at (425) 452-6873.
Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Plumbing Permit checklist for Bellevue
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: permit required for new plumbing, concealed piping, and fixture additions; replacing a sink toilet or faucet not concealed in a wall does not require a permit. Usually needed: Before adding new plumbing, altering concealed piping, or replacing major fixtures in Bellevue.
- Budget the fee. Plumbing permit fee per Table 11 of Ordinance 6879, $50 for the first fixture plus $17.34 for each additional fixture, plus separate piping fees starting at $46 for pipe up to 1 inch, effective 2026-01-01. Official fee schedule.
- Apply. You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit. Start at the Bellevue permit portal.
- Keep the office details handy. City of Bellevue Development Services. Phone: (425) 452-6873. Address: 450 110th Ave NE, Bellevue, WA 98004.
- Plan for inspections. Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
Compiled from the official sources on this page. Last checked 2026-06-18.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Permitting activity in Bellevue
In 2024, Bellevue authorized permits for 589 new residential housing units (254 single-family, 335 in multi-family buildings), valued at $274M, down from802 the year before. That works out to about 4 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 148,073.
About Bellevue
Bellevue has about 65,536 housing units. The median home is valued at $1,203,100, against a median household income of $161,300. About 52% of homes are owner-occupied, and the typical home was built around 1981.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
Frequently asked questions
- Do you need a plumbing permit in Bellevue?
- A plumbing permit is required in Bellevue for new plumbing installations, altering concealed piping, and replacing major fixtures such as water heaters. Replacing a sink, toilet, or faucet not concealed in a wall does not require a permit. Permits without plan review can be issued the same day. Submit applications through MyBuildingPermit.com. Permit required for new plumbing, concealed piping, and fixture additions; replacing a sink toilet or faucet not concealed in a wall does not require a permit. Always confirm with the office before starting.
- How much does a plumbing permit cost in Bellevue?
- Plumbing permit fee per Table 11 of Ordinance 6879, $50 for the first fixture plus $17.34 for each additional fixture, plus separate piping fees starting at $46 for pipe up to 1 inch, effective 2026-01-01. See the official fee schedule for current amounts.
- Where do you apply for a plumbing permit in Bellevue?
- You can apply through the Bellevue permit portal or contact the City of Bellevue Development Services directly. The links are listed on this page.
From the Library
What else needs a permit in Bellevue
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | decks where the highest walking surface is 30 inches or less above grade do not require a permit; decks over 30 inches above grade require a permit with plan review | Building permit fee by valuation per Table 4 of Ordinance 6879, $44 inspection fee mini... |
| Electrical Permit | Permit required | Not specified | Electrical permit fee by valuation per Table 6 of Ordinance 6879, $79 inspection fee mi... |
| Fence Permit | It depends | fences over 8 feet in height require a building permit; fences 8 feet or under do not require a permit | No separate fence line item; |
| HVAC Permit | Permit required | Not specified | Flat single-family mechanical inspection fees per Table 8 of Ordinance 6879: furnace up... |
| Patio Permit | No permit needed | Not specified | No separate patio line item; |
| Pool Permit | It depends | swimming pools over 24 inches deep require a permit with plan review; above-ground pools 24 inches or less may be exempt | Pool equipment electrical inspection fee of $94 without plan review per Table 7 of Ordi... |
| Roof Replacement Permit | It depends | permit required when modifying or replacing the roof sheathing or making structural changes; simple shingle replacement may not require a permit | Flat Re-roof Permit inspection fee of $290 due at issuance per Table 5 of Ordinance 687... |
| Shed Permit | It depends | detached storage sheds playhouses or gazebos with a floor area of 200 square feet or less do not require a building permit; structures over 200 square feet require a permit | No separate shed line item; |
| Solar Permit | It depends | electrical permit required for all solar systems; building permit not required for rooftop single-family systems with dead load under 3.5 lbs per sq ft and panels no more than 18 inches above roof surface | Solar panel installations are electrical permits with fee by valuation per Table 6 of O... |
Plumbing Permit in other Washington localities
Official sources
- https://bellevuewa.gov/city-government/departments/development/permits/electrical-mechanical-plumbing-permits/plumbing-permits
- https://bellevuewa.gov/city-government/departments/development/permits/faqs/work-requiring-permits
- https://www.grantcountywa.gov/DocumentCenter/View/5840/Exempt-R1052
- https://www.oregon.gov/bcd/codes-stand/Documents/2021orsc-ch1.pdf
Verified by a person against the sources above on 2026-06-18, not confirmed with City of Bellevue Development Services. Rules change; confirm before you build. How we verify.
Last checked: 2026-06-18Report an error on this page
Compare Plumbing Permit requirements across Washington localities
Washington rule changes
- Bellevue, WA sets a flat $290 re-roof permit fee (Ordinance 6879)
Ord. 6879 · 2026-07-25