Plumbing Permit in Seattle, Washington
By Mario Bailey Last checked 2026-06-18 · 2 official sources
Verified against official sources Confirmed on official pagePermit required
Quick answer
Residential plumbing and gas piping permits in Seattle are issued by Public Health Seattle and King County, not by SDCI. All piping inside the building is regulated by the health department. A permit is required whenever plumbing is installed, relocated, or modified. Homeowners may do their own work but must obtain a permit and schedule inspections.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help
Tell us where your project stands. Free to ask; no obligation.
Where we have a vetted local pro who handles permits in Seattle, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.
When a permit is usually needed
For all residential plumbing and gas piping work in Seattle
What plumbing permit costs in Seattle
No SDCI fee; the Seattle Plumbing Code is enforced by Public Health Seattle and King County, so plumbing permits and fees follow that agency's schedule rather than the city's Fee Subtitle.
How Seattle compares in Washington
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Bellevue | It depends | permit required for new plumbing, concealed piping, and fixture additions; replacing a sink toilet or faucet not concealed in a wall does not require a permit |
| Clark County | Permit required | A plumbing permit is required for installation of any plumbing fixtures, including water heaters, toilets and sinks. |
| King County | Permit required | Not specified |
| Pierce County | Permit required | Not specified |
| Seattlethis page | Permit required | Not specified |
| Snohomish County | Permit required | Not specified |
| Tacoma | Permit required | Not specified |
How to apply in Seattle
You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.
What most plumbing permit applications include:
- A permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
- The application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
- Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
- Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
- Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).
General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. Public Health Seattle and King County sets the exact checklist for Seattle.
Where to apply in Seattle:
Public Health Seattle and King County
- 401 5th Ave Suite 1100, Seattle, WA 98104
- Phone: (206) 263-9566
Inspections and closing out your permit
Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
- Piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
- Rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
- Rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
- The water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
- The framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
- At the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
- Final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Call Seattle at (206) 263-9566 to schedule.
Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Plumbing Permit checklist for Seattle
- Confirm the requirement. Yes, a permit is required. Usually needed: For all residential plumbing and gas piping work in Seattle.
- Budget the fee. No SDCI fee; the Seattle Plumbing Code is enforced by Public Health Seattle and King County, so plumbing permits and fees follow that agency's schedule rather than the city's Fee Subtitle. Official fee schedule.
- Apply. You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit. Start at the official Seattle permit page.
- Keep the office details handy. Public Health Seattle and King County. Phone: (206) 263-9566. Address: 401 5th Ave Suite 1100, Seattle, WA 98104.
- Plan for inspections. Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
Compiled from the official sources on this page. Last checked 2026-06-18.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Permitting activity in Seattle
In 2024, Seattle authorized permits for 5,895 new residential housing units (405 single-family, 5,490 in multi-family buildings), valued at $1.2B, up from5,299 the year before. That works out to about 7.7 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 769,714.
About Seattle
Seattle has about 382,933 housing units. The median home is valued at $912,100, against a median household income of $121,984. About 44% of homes are owner-occupied, and the typical home was built around 1974.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
Frequently asked questions
- Do you need a plumbing permit in Seattle?
- Residential plumbing and gas piping permits in Seattle are issued by Public Health Seattle and King County, not by SDCI. All piping inside the building is regulated by the health department. A permit is required whenever plumbing is installed, relocated, or modified. Homeowners may do their own work but must obtain a permit and schedule inspections. Always confirm with the Public Health Seattle and King County before starting.
- How much does a plumbing permit cost in Seattle?
- No SDCI fee; the Seattle Plumbing Code is enforced by Public Health Seattle and King County, so plumbing permits and fees follow that agency's schedule rather than the city's Fee Subtitle. See the official fee schedule for current amounts.
- Where do you apply for a plumbing permit in Seattle?
- Apply through the Public Health Seattle and King County. The official permit page and contact details are listed on this page.
From the Library
What else needs a permit in Seattle
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | decks more than 18 inches above grade require a permit; decks 18 inches or less above grade and not over a basement do not require a permit | Priced as a subject-to-field-inspection or addition/alteration construction permit by p... |
| Electrical Permit | Permit required | Not specified | Itemized per Fee Subtitle Table D-15: minimum $105.12 for a standard online self-issued... |
| Fence Permit | It depends | fences under 8 feet with no masonry or concrete elements exceeding 6 feet do not require a permit | Fences 8 feet or less with no masonry or concrete elements over 6 feet need no permit p... |
| HVAC Permit | Permit required | Not specified | Ducted HVAC systems are priced by project valuation with a $292 minimum; |
| Patio Permit | No permit needed | Not specified | No standalone patio permit; |
| Pool Permit | Permit required | Not specified | An unenclosed pool accessory to a single-family or duplex home is a flat fee of four ti... |
| Roof Replacement Permit | No permit needed | Not specified | One and two family homes need no permit for a straight reroof that does not change the... |
| Shed Permit | It depends | one-story detached storage sheds with a roof footprint of 120 square feet or less on a slab foundation and not in an environmentally critical area do not require a permit | Sheds of 120 square feet or less that are single story, unattached, and storage-only ne... |
| Solar Permit | Permit required | Not specified | Solar PV is permitted through the electrical permit: systems below 12kW are a flat $438... |
Plumbing Permit in other Washington localities
Official sources
- https://kingcounty.gov/en/dept/dph/health-safety/environmental-health/plumbing-gas-piping/applications-and-permits/
- https://www.seattle.gov/sdci/codes/codes-we-enforce-(a-z)/plumbing-code
- https://www.grantcountywa.gov/DocumentCenter/View/5840/Exempt-R1052
- https://www.oregon.gov/bcd/codes-stand/Documents/2021orsc-ch1.pdf
Verified by a person against the sources above on 2026-06-18, not confirmed with Public Health Seattle and King County. Rules change; confirm before you build. How we verify.
Last checked: 2026-06-18Report an error on this page
Compare Plumbing Permit requirements across Washington localities
Washington rule changes
- Bellevue, WA sets a flat $290 re-roof permit fee (Ordinance 6879)
Ord. 6879 · 2026-07-25