Washington / Pierce County

Pool Permit in Pierce County, Washington

By Mario Bailey Last checked 2026-07-06 · 3 official sources

Verified against official sources Confirmed on official page

It depends

Quick answer

In unincorporated Pierce County a prefabricated swimming pool accessory to a single family residence does not require a building permit if it is less than 24 inches deep; Pierce County sets no separate gallon volume cap for this exemption. Self-contained spas and hot tubs installed entirely above ground and not connected to the potable water system or to a septic or sewer drain are separately exempt regardless of depth. In-ground pools and pools 24 inches deep or deeper require a building permit applied for through the PALS Online permit portal, and all pools, whether exempt or permitted, must still meet zoning and pool barrier safety requirements.

Typical threshold: Prefabricated swimming pools accessory to a single family residence (Group R-3 occupancy) are exempt if less than 24 inches deep, with no separate gallon volume cap; in-ground pools and pools 24 inches deep or deeper require a building permit. Self-contained spas and hot tubs installed entirely above ground and not connected to the potable water system or a septic or sewer drain are separately exempt regardless of depth.

24 in water depth
Threshold illustrated: 24 in water depth. Whether Pierce County requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-07-06.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Pierce County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

Before installing an in-ground pool, or any prefabricated pool 24 inches deep or deeper, in unincorporated Pierce County

What your pool permit must meet in Washington

Washington's 2021 Residential Code (WAC 51-51, effective statewide March 15, 2024) requires backyard swimming pools, spas, and hot tubs at single-family and duplex homes to be designed and built to the 2021 International Swimming Pool and Spa Code, incorporated by direct statewide reference rather than left to local option.

  • The design and construction of swimming pools, spas, and other aquatic recreation facilities must comply with the 2021 International Swimming Pool and Spa Code whenever the facility falls into one of three defined residential categories (WAC 51-51-0327).
  • That mandatory ISPSC standard covers pools for the sole use of a single-family dwelling's residents and guests, the sole use of a resident-owned duplex, or a facility used exclusively for medical physical therapy under a licensed practitioner's supervision (WAC 51-51-0327).
  • Any other water recreation facility outside those residential categories is regulated under separate Washington Department of Health rules, not the Residential Code (WAC 246-260; WAC 51-50-3109).

Based on 2021 International Swimming Pool and Spa Code (ISPSC), incorporated by WAC 51-51-0327 into the 2021 Washington State Residential Code. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.

What pool permit costs in Pierce County

Where a permit is required: in-ground pool permit $230.00; aboveground pool permit $58.00 if valued under $500 or $115.00 if valued $500 or more (PCC Table 17C.10-1-G, 2026 fees).

Official fee schedule

How Pierce County compares in Washington

JurisdictionPermit needed?Threshold
BellevueIt dependsswimming pools over 24 inches deep require a permit with plan review; above-ground pools 24 inches or less may be exempt
Clark CountyIt dependsA permit is required for any structure intended for swimming or recreational bathing that contains water over 24 inches deep, including in-ground, aboveground and on-ground pools, hot tubs and spas.
King CountyIt dependsprefabricated above-ground pools less than 24 inches deep and not exceeding 5000 gallons are exempt; all other pools require a building permit in unincorporated King County
Pierce Countythis pageIt dependsPrefabricated swimming pools accessory to a single family residence (Group R-3 occupancy) are exempt if less than 24 inches deep, with no separate gallon volume cap; in-ground pools and pools 24 inches deep or deeper require a building permit. Self-contained spas and hot tubs installed entirely above ground and not connected to the potable water system or a septic or sewer drain are separately exempt regardless of depth.
Snohomish CountyIt dependsprefabricated swimming pools regulated under the IRC (one- and two-family dwellings) exempt if less than 24 inches deep, with no gallon-volume cap; in-ground pools or pools 24 inches deep or more require a building permit
TacomaIt dependsprefabricated above-ground pools less than 24 inches deep and not greater than 5000 gallons are exempt; all other pools require a building permit
Thurston CountyIt dependsPools are exempt only if prefabricated, entirely above ground, less than 24 inches deep, and under 5,000 gallons capacity.

Closest pool permit thresholds outside Washington

Jurisdictions we cover whose limit sits nearest Pierce County's 24 inches.

  • Lee County, Florida, All in-ground pool construction or renovation requires a permit; an above-ground pool requires a permit when its water depth is 24 inches or more.
  • Palm Beach County, Florida, Portable or manufactured pools and spas less than 24 inches deep need no permit; all in-ground pools, larger above-ground pools, and spas require a Building Permit (Type 3(E) for 1 and 2 unit dwellings) plus applicable electrical, plumbing, and pool-barrier sub-permits, and must satisfy Florida's residential pool safety-feature requirements under F.S. 515.27 before final inspection.
  • Polk County, Florida, In-ground pools and spas always require a permit; above-ground pools and spas require one only when more than 24 inches deep.
  • Virginia Beach, Virginia, Permits are required for pools, hot tubs, and spas holding 24 inches or more of water; state code exempts only pools with a surface area of 150 square feet or less that are under 24 inches deep.

How to apply in Pierce County

A residential pool permit application covers both construction and safety: a scaled site plan, structural plans for the pool, a barrier plan showing how the pool will be enclosed, and an electrical plan covering bonding and the equipment disconnect.

What most pool permit applications include:

  • Pool and spa design and construction fall under the residential code chapter that folds in the swimming pool and spa code, and permit review checks plans against that chapter (IRC R326).
  • The site plan must show pool equipment such as pumps, filters, and heaters set back at least 36 inches from the outside of the required barrier (ISPSC 305.2.9).
  • For an in-ground pool, engineered structural plans covering the shell and reinforcing steel, with the responsible structural engineer's license information, are a standard part of the submittal (per official pool submittal checklists).
  • A barrier plan identifying the fence, pool structure, or dwelling wall that will enclose the pool must be submitted and must comply with the code's barrier chapter (ISPSC 305).
  • Electrical plans must show the pool's equipotential bonding design, since the shell, perimeter surfaces, and metal fittings within 5 feet of the water must all tie into a common bonding grid (NEC 680.26).
  • The electrical plan must also show a disconnecting means for the pool equipment that is readily accessible and within sight of the equipment (NEC 680.13).

General submittal guidance from 2021 IRC R326 (adopting the ISPSC), ISPSC 2021 Section 305, and NEC 2020 Article 680. Source. Pierce County Planning and Public Works sets the exact checklist for Pierce County.

Where to apply in Pierce County:

Pierce County Planning and Public Works

Inspections and closing out your permit

Pool inspections track the concrete pour: the steel and bonding grid are checked before gunite or shotcrete goes in, bonding is checked again before decking is poured, and the permanent barrier and remaining electrical work are checked at final before the pool can be filled and used.

  1. Before gunite or shotcrete is sprayed, the inspector checks the rebar against the engineered plans and confirms the equipotential bonding wire is stubbed out and tied into the steel, since it will be buried in concrete afterward (NEC 680.26).
  2. A bonding inspection separately confirms coping, decking, ladders, handrail cups, and any other metal within 5 feet of the water are tied to the bonding grid, and it must pass before coping is installed (NEC 680.26).
  3. A temporary barrier at least 4 feet high must enclose the site from the moment excavation starts until the permanent barrier is finished, and inspectors check for it throughout construction (ISPSC 305.1.1).
  4. A pre-plaster inspection confirms the circulation equipment's electrical work is installed and all bonding is complete before the pool's interior finish goes on (NEC 680.26).
  5. At final inspection the permanent barrier is checked against the code's requirements and the equipment and cover-mechanism bonding must be complete before the pool can be filled and used (ISPSC 305, NEC 680.26).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Pierce County permit portal or by phone at (253) 798-3739.

Inspection sequence from NEC 2020 Article 680.26 (equipotential bonding) and ISPSC 2021 Section 305 (barriers). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a pool permit in Pierce County?
In unincorporated Pierce County a prefabricated swimming pool accessory to a single family residence does not require a building permit if it is less than 24 inches deep; Pierce County sets no separate gallon volume cap for this exemption. Self-contained spas and hot tubs installed entirely above ground and not connected to the potable water system or to a septic or sewer drain are separately exempt regardless of depth. In-ground pools and pools 24 inches deep or deeper require a building permit applied for through the PALS Online permit portal, and all pools, whether exempt or permitted, must still meet zoning and pool barrier safety requirements. Prefabricated swimming pools accessory to a single family residence (Group R-3 occupancy) are exempt if less than 24 inches deep, with no separate gallon volume cap; in-ground pools and pools 24 inches deep or deeper require a building permit. Self-contained spas and hot tubs installed entirely above ground and not connected to the potable water system or a septic or sewer drain are separately exempt regardless of depth. Always confirm with the office before starting.
How much does a pool permit cost in Pierce County?
Where a permit is required: in-ground pool permit $230.00; aboveground pool permit $58.00 if valued under $500 or $115.00 if valued $500 or more (PCC Table 17C.10-1-G, 2026 fees). See the official fee schedule for current amounts.
Where do you apply for a pool permit in Pierce County?
You can apply through the Pierce County permit portal or contact the Pierce County Planning and Public Works directly. The links are listed on this page.

From the Library

What else needs a permit in Pierce County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsDecks not more than 30 inches above grade at any point, and not over any story or basement below, are exempt; Pierce County code sets no separate floor area cap for decks; taller decks, or decks over a story or basement, require a building permit.Building permit fee follows PCC Table 17C.10-1-B (valuation based): $69.00 for construc...
Electrical PermitPermit requiredNot specifiedNo county fee;
Fence PermitIt dependsFences 6 feet or less in height, measured from grade, are exempt; taller fences require a building permit.Building permit fee follows PCC Table 17C.10-1-B (valuation based): $69.00 for construc...
HVAC PermitPermit requiredNot specifiedIssue each mechanical permit fee $58.00, plus unit fees per equipment type (for example...
Patio PermitIt dependsAt-grade patios, treated the same as exempt sidewalks and driveways, are exempt if not more than 30 inches above grade at any point and not over any story or basement below; an attached, roofed patio cover requires a building permit regardless of size.Attached patio covers use the same valuation based building permit fee as other buildin...
Plumbing PermitPermit requiredNot specifiedIssue each plumbing permit fee $58.00, plus unit fees per fixture (for example $8.00 pe...
Roof Replacement PermitIt dependsRe-roofing of a Group R, Division 3 one or two family dwelling, or a Group U private garage, carport, or accessory structure, with a roof slope greater than 2:12, is exempt if the total load of all roof coverings does not exceed 7.5 lbs per sq ft; the exemption does not apply to vegetated roofs or to replacement of roof sheathing.Building permit fee follows PCC Table 17C.10-1-B (valuation based): $69.00 for construc...
Shed PermitIt dependsOne-story detached accessory structure used as an unheated tool or storage shed, playhouse, or similar use is exempt if its floor area is 200 sq ft or less and it is at least 3 feet from a property line; larger or closer structures require a building permit.Building permit fee follows PCC Table 17C.10-1-B (valuation based): $69.00 for construc...
Solar PermitPermit requiredNot specifiedResidential rooftop solar panel building permit base fee $173.00, plus $201.00 for syst...

Pool Permit in other Washington localities

Official sources

Verified by a person against the sources above on 2026-07-06, not confirmed with Pierce County Planning and Public Works. Rules change; confirm before you build. How we verify.

Last checked: 2026-07-06Report an error on this page

Compare Pool Permit requirements across Washington localities