Washington / Pierce County

Deck Permit in Pierce County, Washington

By Mario Bailey Last checked 2026-07-06 · 2 official sources

Verified against official sources Confirmed on official page

It depends

Quick answer

In unincorporated Pierce County a deck does not require a building permit if it is not more than 30 inches above grade at any point and is not built over a story or basement below. Pierce County's own code sets no separate square footage limit for decks, unlike its shed exemption. Decks taller than 30 inches above grade, or built over a story or basement, require a building permit applied for through the PALS Online permit portal.

Typical threshold: Decks not more than 30 inches above grade at any point, and not over any story or basement below, are exempt; Pierce County code sets no separate floor area cap for decks; taller decks, or decks over a story or basement, require a building permit.

30 in above grade
Threshold illustrated: 30 in above grade. Whether Pierce County requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-07-06.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Pierce County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

Before building a deck more than 30 inches above grade at any point, or over a story or basement, in unincorporated Pierce County

What your deck permit must meet in Washington

A residential deck in Washington is built to the 2021 International Residential Code as adopted with state amendments (WAC 51-51, Washington State Residential Code 2021), which among other things raises the deck live load to 60 psf. The prescriptive deck rules cover guards, stairs, footings, and a positive ledger and lateral-load connection.

  • Guards are required whenever the deck walking surface is more than 30 inches above the grade or floor below (R312).
  • Required deck guards must be at least 36 inches high, with openings sized so a 4-inch diameter sphere cannot pass through (R312).
  • Deck stairs (any flight with 4 or more risers) allow a maximum riser height of 7 3/4 inches, require a minimum tread depth of 10 inches, and a minimum stairway width of 36 inches (R311.7).
  • Stairs with 4 or more risers need a handrail on at least one side, with the top 34 to 38 inches above the stair nosing (R311.7.8).
  • Exterior footings must be placed at least 12 inches below undisturbed ground (R403.1.4); frost-protection depth is not a single statewide number but is set by the local jurisdiction, so confirm frost depth with the local building department (R403.1.4.1).
  • The deck ledger must have a positive connection to the band joist using lag screws or bolts spaced per Table R507.9.1.3, not toenails or deck screws, and the band joist must be minimum 2-inch nominal solid-sawn lumber or engineered rim board (R507.9).
  • A lateral load connection is required: hold-down tension devices in at least two locations per deck, each with a capacity of not less than 1,500 pounds (R507.9.2).

Based on Washington State Residential Code 2021 (2021 IRC with WA amendments, WAC 51-51): R312, R311.7, R403.1.4, R507.9. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.

What deck permit costs in Pierce County

Building permit fee follows PCC Table 17C.10-1-B (valuation based): $69.00 for construction valued at $500 or less, plus $2.00 for each additional $100 or fraction up to $2,000, plus a plan review fee equal to 65 percent of the building permit fee (PCC Table 17C.10-1-C).

Official fee schedule

How Pierce County compares in Washington

Across the Washington jurisdictions we have verified, the same threshold runs from 18 to 30, so a project that is exempt here may still need a permit one county over.

JurisdictionPermit needed?Threshold
BellevueIt dependsdecks where the highest walking surface is 30 inches or less above grade do not require a permit; decks over 30 inches above grade require a permit with plan review
Clark CountyIt dependsExempt only if the deck does not exceed 200 square feet, is not more than 30 inches above grade at any point, is not attached to a dwelling, does not serve a required exit door, and is not used for a hot tub or pool; all other decks require a permit.
King CountyIt dependsuncovered decks 30 inches or less above ground do not require a building permit in unincorporated King County; decks over 30 inches above grade require a permit
Pierce Countythis pageIt dependsDecks not more than 30 inches above grade at any point, and not over any story or basement below, are exempt; Pierce County code sets no separate floor area cap for decks; taller decks, or decks over a story or basement, require a building permit.
SeattleIt dependsdecks more than 18 inches above grade require a permit; decks 18 inches or less above grade and not over a basement do not require a permit
Snohomish CountyIt dependsuncovered decks, deck steps, and uncovered porches for residential buildings exempt if 30 inches or less above adjacent grade at any point, not over a basement or story below, and not part of a required accessible route; covered or taller decks require a permit
Thurston CountyIt dependsDecks are exempt if the surface is 30 inches or less from the ground to the top of the deck.

Closest deck permit thresholds outside Washington

Jurisdictions we cover whose limit sits nearest Pierce County's 30 inches.

  • Peoria, Arizona, Platforms not more than 30 inches above adjacent grade that are not over a basement or story below and are not part of an accessible route are exempt from a permit.
  • Miami-Dade County, Florida, wood deck 18 inches or less above ground is exempt; decks higher than 18 inches require a building permit
  • Prince William County, Virginia, building permit required if deck floor is 16.5 inches or more above finished grade

How to apply in Pierce County

A residential deck permit application is a set of construction documents that show what will be built and prove it meets the IRC deck provisions. In practice that means a scaled site plan locating the deck and its setbacks, plus deck plans and structural details covering the footings, posts, beams, joists, ledger, guards, and stairs.

What most deck permit applications include:

  • A permit application identifying the work, the deck's size (square footage), and whether electrical work such as lights or receptacles is included, submitted for plan review before construction begins (IRC R106).
  • A scaled site plan (for example 1/4 inch to 1 foot) showing the new deck's location relative to the house, its overall length and width, and dimensioned distances from the deck to all property lines and other structures so required setbacks can be verified (IRC R106.1.1).
  • A deck plan drawn to scale showing overall dimensions and the framing layout: joist size, spacing, span, and species; beam size and span; post size and height; and footing or pier size and depth (IRC R507.4 posts, R507.5 beams, R507.6 joists, R507.3 footings).
  • A section or side elevation with connection details showing the ledger attachment to the house band joist with flashing, the fastener or bolt schedule, joist hangers, post-to-beam and post-to-footing connections, and the required lateral load connection (IRC R507.9 ledger connection, R507.9.2 lateral connection, R507.2.4 flashing).
  • Footing sizing derived from tributary area, the soil bearing value, and design loads per IRC Table R507.3.1, with footings shown bearing on undisturbed soil at the frost depth required by the jurisdiction (IRC R507.3).
  • Details for the guards required where the walking surface is more than 30 inches above grade, and for the stairs and handrails, showing guard height and opening limits, stair riser and tread dimensions, and handrail location (IRC R312 guards, R311.7 stairs and handrails).
  • For designs that fall outside the prescriptive R507 tables (for example multi-story or stacked decks, or a ledger attached to a cantilever), engineered and stamped structural plans are submitted in place of the prescriptive details (IRC R507.1 and R301).

General submittal guidance from IRC R106.1.1 (construction documents) and IRC R507 (exterior decks), 2021 IRC. Source. Pierce County Planning and Public Works sets the exact checklist for Pierce County.

Where to apply in Pierce County:

Pierce County Planning and Public Works

Inspections and closing out your permit

Deck work is inspected in sequence as it is built: the footings before concrete is placed, the framing before the decking boards go down, and a final inspection once the deck is complete. Each stage checks the items that would be hidden or unsafe if missed.

  1. Footing or pier inspection: after the holes are dug and any forms or reinforcing are set but before concrete is placed, the inspector checks footing depth and diameter, a flat undisturbed bearing surface, and that the holes are free of water (IRC R109.1.1 foundation inspection; R507.3 footings).
  2. Framing inspection: after the deck is framed but before the decking conceals it, the inspector verifies the ledger attachment and its flashing, the fastener and bolt schedule, joist hangers and metal connectors, post-to-beam and post-to-footing connections, and the lateral load connection; call it before decking is installed (IRC R109.1.4 frame inspection; R507.9 ledger and flashing).
  3. Final inspection: after the deck is complete and before it is used, the inspector confirms guard height and opening limits (a 4 inch sphere must not pass, 4 3/8 inch at stairs), stair riser and tread dimensions, handrail height and graspability where there are 4 or more risers, stair landings, and required stair lighting (IRC R109.1.6 final inspection; R312 guards, R311.7 stairs and handrails).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Pierce County permit portal or by phone at (253) 798-3739.

Inspection sequence from IRC R109 (inspections: R109.1.1 footing before concrete, R109.1.4 frame, R109.1.6 final), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a deck permit in Pierce County?
In unincorporated Pierce County a deck does not require a building permit if it is not more than 30 inches above grade at any point and is not built over a story or basement below. Pierce County's own code sets no separate square footage limit for decks, unlike its shed exemption. Decks taller than 30 inches above grade, or built over a story or basement, require a building permit applied for through the PALS Online permit portal. Decks not more than 30 inches above grade at any point, and not over any story or basement below, are exempt; Pierce County code sets no separate floor area cap for decks; taller decks, or decks over a story or basement, require a building permit. Always confirm with the office before starting.
How much does a deck permit cost in Pierce County?
Building permit fee follows PCC Table 17C.10-1-B (valuation based): $69.00 for construction valued at $500 or less, plus $2.00 for each additional $100 or fraction up to $2,000, plus a plan review fee equal to 65 percent of the building permit fee (PCC Table 17C.10-1-C). See the official fee schedule for current amounts.
Where do you apply for a deck permit in Pierce County?
You can apply through the Pierce County permit portal or contact the Pierce County Planning and Public Works directly. The links are listed on this page.

From the Library

What else needs a permit in Pierce County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Electrical PermitPermit requiredNot specifiedNo county fee;
Fence PermitIt dependsFences 6 feet or less in height, measured from grade, are exempt; taller fences require a building permit.Building permit fee follows PCC Table 17C.10-1-B (valuation based): $69.00 for construc...
HVAC PermitPermit requiredNot specifiedIssue each mechanical permit fee $58.00, plus unit fees per equipment type (for example...
Patio PermitIt dependsAt-grade patios, treated the same as exempt sidewalks and driveways, are exempt if not more than 30 inches above grade at any point and not over any story or basement below; an attached, roofed patio cover requires a building permit regardless of size.Attached patio covers use the same valuation based building permit fee as other buildin...
Plumbing PermitPermit requiredNot specifiedIssue each plumbing permit fee $58.00, plus unit fees per fixture (for example $8.00 pe...
Pool PermitIt dependsPrefabricated swimming pools accessory to a single family residence (Group R-3 occupancy) are exempt if less than 24 inches deep, with no separate gallon volume cap; in-ground pools and pools 24 inches deep or deeper require a building permit. Self-contained spas and hot tubs installed entirely above ground and not connected to the potable water system or a septic or sewer drain are separately exempt regardless of depth.Where a permit is required: in-ground pool permit $230.00;
Roof Replacement PermitIt dependsRe-roofing of a Group R, Division 3 one or two family dwelling, or a Group U private garage, carport, or accessory structure, with a roof slope greater than 2:12, is exempt if the total load of all roof coverings does not exceed 7.5 lbs per sq ft; the exemption does not apply to vegetated roofs or to replacement of roof sheathing.Building permit fee follows PCC Table 17C.10-1-B (valuation based): $69.00 for construc...
Shed PermitIt dependsOne-story detached accessory structure used as an unheated tool or storage shed, playhouse, or similar use is exempt if its floor area is 200 sq ft or less and it is at least 3 feet from a property line; larger or closer structures require a building permit.Building permit fee follows PCC Table 17C.10-1-B (valuation based): $69.00 for construc...
Solar PermitPermit requiredNot specifiedResidential rooftop solar panel building permit base fee $173.00, plus $201.00 for syst...

Deck Permit in other Washington localities

Official sources

Verified by a person against the sources above on 2026-07-06, not confirmed with Pierce County Planning and Public Works. Rules change; confirm before you build. How we verify.

Last checked: 2026-07-06Report an error on this page

Compare Deck Permit requirements across Washington localities