Deck Permit in Miami-Dade County, Florida
It depends
Sometimes, depending on the project
Before building a wood deck more than 18 inches above ground, or when exempt work in a 12-month period would exceed $5,000.00
Quick answer
In unincorporated Miami-Dade County wood decks 18 inches or less above ground do not require a permit. The exemption is for single-family homes, duplexes, townhouses and condominiums, and the total cost of all exempt work in any 12-month period cannot exceed $5,000.00. Decks outside the exemption need a building permit.
- Typical threshold
- wood decks 18 inches or less above ground do not require a permit, as long as all exempt work on the home in any 12-month period does not exceed $5,000.00; other decks need a building permit
- Issued by
- Miami-Dade County Department of Regulatory and Economic Resources
- Phone
- (786) 315-2100
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds your deck, they usually handle the permit as part of the job. Compare a few bids before you commit.
Compare deck contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What your deck permit must meet in Florida
In Florida a residential deck is built to the Florida Building Code, Residential (8th Edition, 2023), which is based on the 2021 IRC with statewide wind amendments. The governing concern is wind rather than frost: the deck and its attachment to the house must be designed for the local ultimate design wind speed, and it must meet the guard, stair, and connection requirements.
- Guards are required on any deck walking surface more than 30 inches above the grade or floor below, with a minimum guard height of 36 inches (FBC-R R312).
- Guard infill and balusters must be spaced so a 4-inch sphere cannot pass through; on the open side of stairs a 4 3/8 inch sphere limit applies (FBC-R R312).
- The deck must be constructed for the local ultimate design wind speed (Vult) taken from Figure R301.2(4), not a fixed minimum (FBC-R R301.2.1).
- Decks must be positively anchored to the primary structure for both vertical and lateral loads; the prescriptive lateral connection uses hold-down tension devices at not less than 2 locations within 24 inches of each end, each rated at least 1,500 lb, and joists framed to a ledger require approved joist hangers (FBC-R R507.8).
- Stairs when present allow a maximum riser height of 7 3/4 inches, a minimum tread depth of 10 inches, and a minimum stair width of 36 inches (FBC-R R311.7).
- Stair handrails are required on any flight with 4 or more risers, mounted 34 to 38 inches above the tread nosing (FBC-R R311.7).
- There is no frost-depth footing requirement in Florida; deck footings and piers are governed by wind uplift and lateral connection detailing. In the High-Velocity Hurricane Zone (Miami-Dade and Broward counties), additional wind-design and product-approval requirements apply.
Based on Florida Building Code, Residential (8th Edition, 2023): R312 guards, R311.7 stairs, R301.2.1 wind speed, R507.8 deck attachment. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.
What a deck permit costs in Miami-Dade County
- Fee schedule in force
- Official scheduleRead .
- No dedicated deck line.
- For single family homes and duplexes the order lists additions at $0.985 per square foot and alterations or repairs at $0.500 per total square foot of the structure with an $870.00 maximum, and does not say which applies to a deck;
- the $150.82 residential minimum applies to both, per Implementing Order 4-63 effective October 1, 2026.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Miami-Dade County compares in Florida
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Alachua County | Permit required | Any size |
| Broward County | Permit required | Any size |
| Charlotte County | Permit required | Any size |
| Clay County | Permit required | an elevated deck, as distinct from other deck work |
| Hernando County | Permit required | Any size |
| Lake County | It depends | A deck built by the property owner on the owner's own personal residence is exempt from a building permit if it does not exceed 30 inches above grade and a 120-square-foot footprint |
| Miami-Dade Countythis page | It depends | wood decks 18 inches or less above ground do not require a permit, as long as all exempt work on the home in any 12-month period does not exceed $5,000.00; other decks need a building permit |
How to apply in Miami-Dade County
General guide, not specific to this office
What a deck permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a deck permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Miami-Dade County Department of Regulatory and Economic Resources
- 11805 SW 26 Street, Miami, FL 33175
- Phone: (786) 315-2100
- Email: permitcenter@miamidade.gov
Your Deck Permit checklist for Miami-Dade County
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: wood decks 18 inches or less above ground do not require a permit, as long as all exempt work on the home in any 12-month period does not exceed $5,000.00; other decks need a building permit. Read the rule where we read it: miamidade.gov: home.page.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Miami-Dade County permit portal.
- Keep the office details handy. Miami-Dade County Department of Regulatory and Economic Resources. Phone: (786) 315-2100. Email: permitcenter@miamidade.gov. Address: 11805 SW 26 Street, Miami, FL 33175.
Compiled from the official sources on this page. Last checked .
Permitting activity in Miami-Dade County
In 2025, Miami-Dade County authorized permits for 16,535 new residential housing units (2,666 single-family, 13,869 in multi-family buildings), valued at $4.7B, up from 10,608 the year before. That works out to about 5.9 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 2,802,029.
About Miami-Dade County
Miami-Dade County has about 1,085,414 housing units. The median home is valued at $425,400, against a median household income of $68,694. About 52% of homes are owner-occupied, and the typical home was built around 1980.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
What else needs a permit in Miami-Dade County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Electrical Permit | Permit required | Any size | Residential wiring for new construction, additions, alterations and repairs is $0.113 per square foot; the schedule has the rest |
| Fence Permit | Permit required | Any size | See schedule |
| HVAC Permit | Permit required | Any size | An exact change out air conditioning system is charged $24.80 per ton, and the fee sheet states a $233.82 minimum fee for mechanical permits |
| Patio Permit | It depends | open patio slabs, walkways and pavers outside the building do not require a building permit, as long as all exempt work on the home in any 12-month period does not exceed $5,000.00; slabs for screened patios and pool slabs are not covered by that exemption; patio covers need a building permit | An unreinforced residential slab on grade is listed at $90.85; the schedule has the rest |
| Plumbing Permit | Permit required | when done by a licensed plumbing contractor, replacement of an electric water heater up to 50-gallon capacity and repair or replacement of faucets, toilets and sinks are exempt | Single family plumbing for new construction, additions, alterations or repairs is $0.143 per square foot; the schedule has the rest |
| Pool Permit | Permit required | in-ground pools need a building permit; above-ground pools need a Zoning Improvement Permit (ZIP) | Installation of a residential swimming pool or spa carries a flat $656.64 building permit fee |
| Roof Replacement Permit | It depends | Roofing work needs a roofing permit, except replacement or repair of a roof covering by a licensed roofing contractor not exceeding $2,000.00 in materials and labor and not exceeding two roofing squares. Work valued under $7,500 on a single-family home, duplex or townhouse may qualify for the state exemption on written request, but not in a flood hazard area and not for structural, electrical, plumbing, mechanical or gas work; the county does not say whether a roof replacement qualifies. | See schedule |
| Shed Permit | Permit required | only one utility shed up to 400 sq ft permitted per residential lot under County Code Section 33-20(k) | A prefabricated utility shed with slab over 100 sq ft carries a flat $150.82 building permit fee per unit |
| Solar Permit | Permit required | Any size | Roof mounted solar photovoltaic systems are $375.14 per system; the schedule has the rest |
Frequently asked questions
- Do you need a deck permit in Miami-Dade County?
- It depends on the project. Wood decks 18 inches or less above ground do not require a permit, as long as all exempt work on the home in any 12-month period does not exceed $5,000.00; other decks need a building permit. If you are unsure how that applies to your project, call the Miami-Dade County Department of Regulatory and Economic Resources at (786) 315-2100 before you start.
- How much does a deck permit cost in Miami-Dade County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the Miami-Dade County Department of Regulatory and Economic Resources at (786) 315-2100.
- Where do you apply for a deck permit in Miami-Dade County?
- You can apply through the Miami-Dade County permit portal or contact the Miami-Dade County Department of Regulatory and Economic Resources directly. The links are listed on this page.
- Can a homeowner pull a deck permit themselves in Miami-Dade County?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Miami-Dade County applies this before you apply.
From the Library
Deck Permit in other Florida localities
Everything above, sourced
How this deck permit page for Miami-Dade County was verified. 2 official sources: miamidade.gov, miamidade.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Miami-Dade County Department of Regulatory and Economic Resources. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page