Florida / Miami-Dade County

HVAC Permit in Miami-Dade County, Florida

By Mario Bailey Last checked 2026-06-18 · 2 official sources

Verified against official sources Confirmed on official page

Permit required

Quick answer

A mechanical permit is required for HVAC and air conditioning work in Miami-Dade County including equipment replacement. Mechanical permits are classed as subsidiary permits. The county follows the Florida Building Code Mechanical section. Applications are submitted through the EPS Portal by licensed contractors or eligible owner-builders.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Miami-Dade County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

For all HVAC and mechanical equipment installation or replacement

What hvac permit costs in Miami-Dade County

An exact change out air conditioning system is charged $24.17 per ton subject to a $227.90 minimum mechanical permit fee, per the county mechanical fee sheet (rev 9/25).

Official fee schedule

How Miami-Dade County compares in Florida

JurisdictionPermit needed?Threshold
Broward CountyPermit requiredNot specified
Hillsborough CountyPermit requiredNot specified
Lee CountyPermit requiredPortable HVAC equipment and replacement of any part that does not alter the equipment's approval or make it unsafe are exempt per Florida Building Code section 105.2.
Miami-Dade Countythis pagePermit requiredNot specified
Orange CountyPermit requiredNot specified
Palm Beach CountyPermit requiredNot specified
Pasco CountyIt dependsAir conditioning repair of existing equipment is exempt; equipment change outs and new installations require a mechanical permit and mechanical work is excluded from the state exemption for work valued at less than $7,500.

How to apply in Miami-Dade County

A residential HVAC (mechanical) permit application must identify the covered equipment and scope of work, since installing, altering, or replacing a heating or cooling system is regulated work that cannot start until the application is submitted and the permit issued. The equipment itself must be picked by a real sizing calculation rather than a rule of thumb.

What most hvac permit applications include:

  • A mechanical permit is required before anyone may install, alter, repair, remove, convert, or replace a heating, ventilating, or air conditioning system regulated by the code, and the work may not begin until the application is submitted and the permit is issued (IRC R105.1).
  • The application identifies the specific equipment being installed, such as a furnace, heat pump, or air conditioner, since the unit must be installed according to its listing and the manufacturer's installation instructions (IRC M1401.1).
  • The proposed equipment location must leave the clearances needed to clean coils and replace filters, blowers, motors, and controls after installation (IRC M1401.2).
  • The application carries the equipment sizing basis: ACCA Manual J building loads and Manual S equipment selection, or another approved sizing method, not a rule of thumb (IRC M1401.3).
  • For a split system, the work covered by the permit includes refrigerant suction line insulation, since the piping is inspected against that standard once installed (IRC M1411.6).

General submittal guidance from International Residential Code (IRC), 2021 edition, Chapter 1 (Permits) and Chapter 14 (Heating and Cooling Equipment and Appliances). Source. Miami-Dade County Department of Regulatory and Economic Resources sets the exact checklist for Miami-Dade County.

Where to apply in Miami-Dade County:

Miami-Dade County Department of Regulatory and Economic Resources

Inspections and closing out your permit

Mechanical work gets a rough in inspection after the ductwork, refrigerant lines, and gas piping are in but before they are covered or concealed, followed by a final inspection that confirms the equipment operates correctly and its clearances, combustion air, and condensate disposal are in place. A straight equipment changeout with no new ductwork commonly gets a single final inspection instead of a separate rough in trip.

  1. Rough inspection of the mechanical and gas systems must be made before the work is covered or concealed, before fixtures or appliances are set or installed, and before the framing inspection (IRC R109.1.2).
  2. Where a cooling coil is added to an existing warm air furnace, the rough in confirms the coil is not installed upstream of the heat exchanger unless the furnace is listed for it, and that the blower can handle the added static pressure (IRC M1411.2).
  3. The rough in and final both confirm the appliance access opening and working space are large enough to service the unit (IRC M1305.1).
  4. At final inspection, the inspector verifies the equipment has adequate combustion air, with openings kept clear for the distance the code requires (IRC M1402.3).
  5. Final inspection also checks that the condensate line drains to an approved point of disposal with the required slope and does not create a nuisance (IRC M1411.3).
  6. For a straight equipment changeout with no new ductwork, many permit offices require only a single final inspection, while a new installation still gets a rough in inspection before the final (common local inspection practice).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Miami-Dade County permit portal or by phone at (786) 315-2100.

Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109 (Required Inspections) and Chapter 14 (Heating and Cooling Equipment and Appliances). Source. An open permit left un-inspected can surface later in a title search or home sale.

Permitting activity in Miami-Dade County

In 2024, Miami-Dade County authorized permits for 10,608 new residential housing units (2,231 single-family, 8,377 in multi-family buildings), valued at $4.2B, down from12,781 the year before. That works out to about 3.7 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 2,838,461.

About Miami-Dade County

Miami-Dade County has about 1,085,414 housing units. The median home is valued at $425,400, against a median household income of $68,694. About 52% of homes are owner-occupied, and the typical home was built around 1980.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

Frequently asked questions

Do you need a hvac permit in Miami-Dade County?
A mechanical permit is required for HVAC and air conditioning work in Miami-Dade County including equipment replacement. Mechanical permits are classed as subsidiary permits. The county follows the Florida Building Code Mechanical section. Applications are submitted through the EPS Portal by licensed contractors or eligible owner-builders. Always confirm with the Miami-Dade County Department of Regulatory and Economic Resources before starting.
How much does a hvac permit cost in Miami-Dade County?
An exact change out air conditioning system is charged $24.17 per ton subject to a $227.90 minimum mechanical permit fee, per the county mechanical fee sheet (rev 9/25). See the official fee schedule for current amounts.
Where do you apply for a hvac permit in Miami-Dade County?
You can apply through the Miami-Dade County permit portal or contact the Miami-Dade County Department of Regulatory and Economic Resources directly. The links are listed on this page.

From the Library

What else needs a permit in Miami-Dade County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependswood deck 18 inches or less above ground is exempt; decks higher than 18 inches require a building permitNo dedicated deck line;
Electrical PermitPermit requiredNot specifiedResidential wiring for new construction, additions, repairs and alterations is $0.11 pe...
Fence PermitPermit requiredNot specifiedFence type determines permit type: wood and masonry fences require a Building Permit (C...
Patio PermitIt dependsopen concrete slabs and pavers outside the building do not require a building permit; roofed or screened patio enclosures require a permitNo dedicated patio line;
Plumbing PermitPermit requiredNot specifiedSingle family plumbing for new construction, additions or alterations is $0.140 per squ...
Pool PermitPermit requiredNot specifiedInstallation of a residential swimming pool or spa carries a flat $640 building permit...
Roof Replacement PermitIt dependsunder F.S. 553.79(1)(g) (HB 803, ch. 2026-63, effective 2026-07-01), work valued at less than $7,500 on a single-family dwelling qualifies for exemption upon a written exemption request with documentation of the nature and value of the work; the exemption excludes electrical, plumbing, structural, mechanical, and gas work and any property in a flood hazard area; the statute does not name roofing, so a non-structural reroof under that value can qualify; confirm with Miami-Dade County Department of Regulatory and Economic Resources. Much of Miami-Dade County lies in flood hazard areas where this exemption does not apply.Re-roofing is charged per square foot of roof coverage including overhangs at $0.11 for...
Shed PermitPermit requiredonly one utility shed up to 400 sq ft permitted per residential lot under County Code Section 33-20(k)A prefabricated utility shed over 100 sq ft carries a flat $147 building permit fee;
Solar PermitPermit requiredNot specifiedRoof mounted solar photovoltaic systems are $365.63 per system, or $250 per system usin...

HVAC Permit in other Florida localities

Official sources

Verified by a person against the sources above on 2026-06-18, not confirmed with Miami-Dade County Department of Regulatory and Economic Resources. Rules change; confirm before you build. How we verify.

Last checked: 2026-06-18Report an error on this page

Compare HVAC Permit requirements across Florida localities