Electrical Permit in Miami-Dade County, Florida
Permit required
Yes, a permit is required
For new wiring, service changes and other electrical work that is not on the county exemption list
Quick answer
Electrical work in unincorporated Miami-Dade County requires a permit. The county exempts a short list of minor items, such as repair or replacement of wall switches and wall outlet receptacles and low-voltage systems in single-family homes.
- Issued by
- Miami-Dade County Department of Regulatory and Economic Resources
- Phone
- (786) 315-2100
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What an electrical permit costs in Miami-Dade County
- Fee schedule in force
- Official scheduleRead .
Residential wiring for new construction, additions, alterations and repairs is $0.113 per square foot, calculated on the square footage on the master permit, and the fee sheet states a $233.82 minimum fee for electrical permits, per the county electrical fee sheet (form 123_01-5 10/26)
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Miami-Dade County compares in Florida
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Alachua County | Permit required | Any size |
| Brevard County | It depends | Permits are required for the installation or replacement of electrical wiring, meter cans, and breaker panels; this does not include changing fixtures that do not require moving or changing wiring. |
| Broward County | Permit required | Any size |
| Charlotte County | Permit required | Any size |
| Clay County | Permit required | Any size |
| Collier County | Permit required | Permits shall not be required for the following: ... Electrical: 1. Repair work performed by licensed electrical contractors that does not exceed $1,500.00 in value of materials and labor. 2. Repair or replace existing light fixtures and ceiling fans. 3. Repair or replace electrical wall switches and wall outlet devices of 20 amps or less and 120 volts. 4. Repair/replace low voltage (under 77 volts) devices. |
| Miami-Dade Countythis page | Permit required | Any size |
How to apply in Miami-Dade County
General guide, not specific to this office
What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Miami-Dade County Department of Regulatory and Economic Resources
- 11805 SW 26 Street, Miami, FL 33175
- Phone: (786) 315-2100
- Email: permitcenter@miamidade.gov
Your Electrical Permit checklist for Miami-Dade County
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: miamidade.gov: permit.page.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Miami-Dade County permit portal.
- Keep the office details handy. Miami-Dade County Department of Regulatory and Economic Resources. Phone: (786) 315-2100. Email: permitcenter@miamidade.gov. Address: 11805 SW 26 Street, Miami, FL 33175.
Compiled from the official sources on this page. Last checked .
Permitting activity in Miami-Dade County
In 2025, Miami-Dade County authorized permits for 16,535 new residential housing units (2,666 single-family, 13,869 in multi-family buildings), valued at $4.7B, up from 10,608 the year before. That works out to about 5.9 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 2,802,029.
About Miami-Dade County
Miami-Dade County has about 1,085,414 housing units. The median home is valued at $425,400, against a median household income of $68,694. About 52% of homes are owner-occupied, and the typical home was built around 1980.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
What else needs a permit in Miami-Dade County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | wood decks 18 inches or less above ground do not require a permit, as long as all exempt work on the home in any 12-month period does not exceed $5,000.00; other decks need a building permit | See schedule |
| Fence Permit | Permit required | Any size | See schedule |
| HVAC Permit | Permit required | Any size | An exact change out air conditioning system is charged $24.80 per ton, and the fee sheet states a $233.82 minimum fee for mechanical permits |
| Patio Permit | It depends | open patio slabs, walkways and pavers outside the building do not require a building permit, as long as all exempt work on the home in any 12-month period does not exceed $5,000.00; slabs for screened patios and pool slabs are not covered by that exemption; patio covers need a building permit | An unreinforced residential slab on grade is listed at $90.85; the schedule has the rest |
| Plumbing Permit | Permit required | when done by a licensed plumbing contractor, replacement of an electric water heater up to 50-gallon capacity and repair or replacement of faucets, toilets and sinks are exempt | Single family plumbing for new construction, additions, alterations or repairs is $0.143 per square foot; the schedule has the rest |
| Pool Permit | Permit required | in-ground pools need a building permit; above-ground pools need a Zoning Improvement Permit (ZIP) | Installation of a residential swimming pool or spa carries a flat $656.64 building permit fee |
| Roof Replacement Permit | It depends | Roofing work needs a roofing permit, except replacement or repair of a roof covering by a licensed roofing contractor not exceeding $2,000.00 in materials and labor and not exceeding two roofing squares. Work valued under $7,500 on a single-family home, duplex or townhouse may qualify for the state exemption on written request, but not in a flood hazard area and not for structural, electrical, plumbing, mechanical or gas work; the county does not say whether a roof replacement qualifies. | See schedule |
| Shed Permit | Permit required | only one utility shed up to 400 sq ft permitted per residential lot under County Code Section 33-20(k) | A prefabricated utility shed with slab over 100 sq ft carries a flat $150.82 building permit fee per unit |
| Solar Permit | Permit required | Any size | Roof mounted solar photovoltaic systems are $375.14 per system; the schedule has the rest |
Frequently asked questions
- Do you need an electrical permit in Miami-Dade County?
- Yes, for new wiring, service changes and other electrical work that is not on the county exemption list. If you are unsure how that applies to your project, call the Miami-Dade County Department of Regulatory and Economic Resources at (786) 315-2100 before you start.
- How much does an electrical permit cost in Miami-Dade County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the Miami-Dade County Department of Regulatory and Economic Resources at (786) 315-2100.
- Where do you apply for an electrical permit in Miami-Dade County?
- You can apply through the Miami-Dade County permit portal or contact the Miami-Dade County Department of Regulatory and Economic Resources directly. The links are listed on this page.
- Can a homeowner pull an electrical permit themselves in Miami-Dade County?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Miami-Dade County applies this before you apply.
From the Library
Electrical Permit in other Florida localities
Everything above, sourced
How this electrical permit page for Miami-Dade County was verified. 3 official sources: miamidade.gov, miamidade.gov, miamidade.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Miami-Dade County Department of Regulatory and Economic Resources. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page