Permit required

Yes, a permit is required

Before constructing an in ground pool or spa

From an official source Verified

Issued byBuilding Construction Services

By Mario Bailey, verified against official sources

Quick answer

Pool and spa work is a listed residential permit type in Pasco County, and the posted county fee schedule sets a permit fee line for residential in ground swimming pools and spas. Residential pool resurfacing is exempt from permitting. Applications are submitted through the Pasco Gateway online portal, and the county forms library includes a pool, spa, and hot tub affidavit.

Typical threshold: Only residential pool resurfacing is exempt; new pool or spa construction requires a building permit.

Who is pulling this permit?

Hire it out

Sponsored

Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.

Compare pool builder quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

Before constructing an in ground pool or spa

What your pool permit must meet in Florida

Florida residential pools are built under the Florida Building Code, Residential, 8th Edition (2023), which the Legislature requires to incorporate the safety-feature and barrier standards of the Residential Swimming Pool Safety Act (Florida Statutes Chapter 515).

  • State law requires the Florida Building Code to uniformly implement the pool-safety statutes by including standards for residential swimming pool barriers, pool covers, latching devices, and door and window exit alarms (F.S. 553.73).
  • A new residential pool must be built with at least one of five listed safety features, not necessarily a fence: a compliant barrier, an approved safety pool cover, exit alarms on doors and windows with access to the pool, self-closing self-latching doors, or a certified pool alarm (F.S. 515.27).
  • If a barrier is used, it must be at least 4 feet high on the outside and may not have gaps, openings, indentations, or structural components that could let a young child crawl under, squeeze through, or climb over it, placed far enough from the water's edge that a child who gets past it does not immediately fall in (F.S. 515.29).
  • Pool gates must open outward away from the pool, be self-closing, and have a self-latching device with its release mechanism on the pool side, positioned out of a young child's reach (F.S. 515.29).
  • Where a removable mesh safety barrier is used, it must comply with ASTM F2286 and may not be installed on top of an above-ground or on-ground pool (FBC-R, 8th Edition change).

Based on Florida Statutes Chapter 515 (Residential Swimming Pool Safety Act, ss. 515.27, 515.29) as implemented by the Florida Building Code, Residential, 8th Edition (2023), Chapter 45. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.

What a pool permit costs in Pasco County

Line item
pool permitBy formulaBase permit fee $45 plus $25 per unit for residential in ground swimming pools and spas per posted fee Resolution 18-17.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Pasco County compares in Florida

JurisdictionPermit needed?Threshold
Alachua CountyPermit requiredNot specified
Brevard CountyIt dependsPermits are issued for in-ground pools and spas, and for above-ground pools with a depth of 24 inches or greater.
Broward CountyPermit requiredNot specified
Charlotte CountyPermit requiredThis residential pool/spa permit type includes spas, swim spas, and above-ground pools that are 24 inches or greater in depth.
Clay CountyPermit requiredNot specified
Collier CountyPermit requiredNot specified
Pasco Countythis pagePermit requiredOnly residential pool resurfacing is exempt; new pool or spa construction requires a building permit.

How to apply in Pasco County

In Pasco County, a residential pool permit application covers both construction and safety: a scaled site plan, structural plans for the pool, a barrier plan showing how the pool will be enclosed, and an electrical plan covering bonding and the equipment disconnect.

What most pool permit applications include:

  • Pool and spa design and construction fall under the residential code chapter that folds in the swimming pool and spa code, and permit review checks plans against that chapter (IRC R326).
  • For Pasco County, the site plan must show pool equipment such as pumps, filters, and heaters set back at least 36 inches from the outside of the required barrier (ISPSC 305.2.9).
  • For an in-ground pool, engineered structural plans covering the shell and reinforcing steel, with the responsible structural engineer's license information, are a standard part of the submittal (per official pool submittal checklists).
  • For Pasco County, a barrier plan identifying the fence, pool structure, or dwelling wall that will enclose the pool must be submitted and must comply with the code's barrier chapter (ISPSC 305).
  • Electrical plans must show the pool's equipotential bonding design, since the shell, perimeter surfaces, and metal fittings within 5 feet of the water must all tie into a common bonding grid (NEC 680.26).
  • For Pasco County, the electrical plan must also show a disconnecting means for the pool equipment that is readily accessible and within sight of the equipment (NEC 680.13).

General submittal guidance from 2021 IRC R326 (adopting the ISPSC), ISPSC 2021 Section 305, and NEC 2020 Article 680. Source. Building Construction Services sets the exact checklist for Pasco County.

Where to apply in Pasco County:

Building Construction Services

Pool Permit in Pasco County compared with nearby Florida localities

LocalityPermit needed?ThresholdWhat each Florida schedule saysVerified
Pasco CountyPermit requiredOnly residential pool resurfacing is exempt; new pool or spa construction requires a building permit.Base permit fee $45 plus $25 per unit for residential in ground swimming pools and spas...
Alachua CountyPermit requiredNot specifiedFlat fees: swimming pool (in-ground) $380.00, swimming pool (above-ground) $205.00, per...
Brevard CountyIt dependsPermits are issued for in-ground pools and spas, and for above-ground pools with a depth of 24 inches or greater.Brevard's Residential Pool Permit Application fee table lists a Building Code Review fee...
Broward CountyPermit requiredNot specifiedPool work needs separate Structural, Plumbing, Mechanical and Electrical permit...
Charlotte CountyPermit requiredThis residential pool/spa permit type includes spas, swim spas, and above-ground pools that are 24 inches or greater in depth.At application: $94 flat fee for above-ground pools or $200 for in-ground pools, plus a...

Inspections and closing out your permit

In Pasco County, pool inspections track the concrete pour: the steel and bonding grid are checked before gunite or shotcrete goes in, bonding is checked again before decking is poured, and the permanent barrier and remaining electrical work are checked at final before the pool can be filled and used.

  1. In Pasco County: before gunite or shotcrete is sprayed, the inspector checks the rebar against the engineered plans and confirms the equipotential bonding wire is stubbed out and tied into the steel, since it will be buried in concrete afterward (NEC 680.26).
  2. In Pasco County: a bonding inspection separately confirms coping, decking, ladders, handrail cups, and any other metal within 5 feet of the water are tied to the bonding grid, and it must pass before coping is installed (NEC 680.26).
  3. In Pasco County: a temporary barrier at least 4 feet high must enclose the site from the moment excavation starts until the permanent barrier is finished, and inspectors check for it throughout construction (ISPSC 305.1.1).
  4. In Pasco County: a pre-plaster inspection confirms the circulation equipment's electrical work is installed and all bonding is complete before the pool's interior finish goes on (NEC 680.26).
  5. In Pasco County: at final inspection the permanent barrier is checked against the code's requirements and the equipment and cover-mechanism bonding must be complete before the pool can be filled and used (ISPSC 305, NEC 680.26).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Pasco County permit portal or by phone at 727-847-8126.

Inspection sequence from NEC 2020 Article 680.26 (equipotential bonding) and ISPSC 2021 Section 305 (barriers). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a pool permit in Pasco County?
Pool and spa work is a listed residential permit type in Pasco County, and the posted county fee schedule sets a permit fee line for residential in ground swimming pools and spas. Residential pool resurfacing is exempt from permitting. Applications are submitted through the Pasco Gateway online portal, and the county forms library includes a pool, spa, and hot tub affidavit. Always confirm with the Building Construction Services before starting.
How much does a pool permit cost in Pasco County?
Base permit fee $45 plus $25 per unit for residential in ground swimming pools and spas per posted fee Resolution 18-17. See the official fee schedule for current amounts.
Where do you apply for a pool permit in Pasco County?
You can apply through the Pasco County permit portal or contact the Building Construction Services directly. The links are listed on this page.
Can a homeowner pull a pool permit themselves in Pasco County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Pasco County applies this before you apply.

From the Library

What else needs a permit in Pasco County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNo exemption threshold applies because decks are absent from the county exemptions list and structural work is excluded from the state exemption for work valued at less than $7,500.Base permit fee $45 for all permits
Electrical PermitIt dependsReplacement of existing light fixtures or switches and garage door openers on existing electrical are exempt; other electrical work requires a permit and electrical work is excluded from the state exemption for work valued at less than $7,500.Base fee $45
Fence PermitIt dependsA permit is required only when the fence is supported by brick, block, or concrete columns; ordinary residential fences are exempt but setbacks must be checked with Development Code Review.Base permit fee $45 for all permits per posted fee Resolution 18-17
HVAC PermitIt dependsAir conditioning repair of existing equipment is exempt; equipment change outs and new installations require a mechanical permit and mechanical work is excluded from the state exemption for work valued at less than $7,500.Base fee $45
Patio PermitIt dependsNon structural concrete flatwork under 500 square feet per parcel that will not be built on is exempt outside special flood hazard areas; slabs intended for a future structure require a permit with sealed plans.Base permit fee $45
Plumbing PermitIt dependsReplacement of existing faucets, sinks, or toilets and French drains not tied into public sewer are exempt; other plumbing work requires a permit and plumbing work is excluded from the state exemption for work valued at less than $7,500.Base fee $45
Roof Replacement PermitIt dependsUnder F.S. 553.79(1)(g) effective 2026-07-01, work valued at less than $7,500 on a single family dwelling that is not structural, electrical, plumbing, mechanical, or gas work is exempt outside flood hazard areas after a written exemption request with documentation; Pasco separately exempts roof repairs of 1.5 squares or less and liquid roof coatings.Base permit fee $45 plus $40 per unit for residential reroof with mitigation or $20 per...
Shed PermitIt dependsSheds of 150 square feet or less are exempt only if approved by and on file with the Florida DBPR Manufactured Building Program, with tie-downs installed and setbacks met, and not in a special flood hazard area.Base permit fee $45 for all permits
Solar PermitPermit requiredNo exemption threshold applies because solar installations involve electrical or plumbing trade work, which is excluded from the state exemption for work valued at less than $7,500.Base permit fee $45

Pool Permit in other Florida localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Pasco County documents; the office above sets the local rules.

How this pool permit page for Pasco County was verified. 4 official sources: pascocountyfl.gov, pascocountyfl.gov, pascocountyfl.net, pascocountyfl.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Building Construction Services. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page