Permit records

Clay County permit search

Clay County permit records are public. The county publishes them through Citizens Access Portal (CAP), Clay County's Tyler Technologies EPL system, and searching does not require an account.

By Mario Bailey Last checked · 10 official sources

Project types verified
10
in Clay County
Search verified
13 Aug 2026
we opened it ourselves

How to search

  1. Open the Clay County permit record search.
  2. Enter an address, or switch the search type to look up permits by permit number, contractor, or parcel information.
  3. Open a result to see the permit's status, inspection history, and issue date.
The Clay County permit portal search screen
The Clay County permit portal as we captured it on .

If the permit does not turn up

Older permits are often missing from online records, and a permit filed under a contractor's name will not surface in an address search that expects the owner. Clay County Building Division can check the paper file.

What needs a permit in Clay County

Every project type we have verified in Clay County, with the rule, the threshold, and the fee that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredan elevated deck, as distinct from other deck workNo deck-specific line item appears in the FY24/25 Building Fee Schedule (Resolution No.
Electrical PermitPermit requiredNot specifiedFY24/25 Building Fee Schedule, Electrical Permits (Section 208.2), effective January 1...
Fence PermitIt dependsvalue of repair or replacement work to existing wood fence pickets or panels, not including fence postsThe FY 2024/2025 Building Fee Schedule (Resolution No.
HVAC PermitPermit requiredNot specifiedFY24/25 Building Fee Schedule, Mechanical Permits (Section 208.4), effective January 1...
Patio PermitNot confirmedNot specifiedNot published
Plumbing PermitPermit requiredNot specifiedFY24/25 Building Fee Schedule, Plumbing Permits (Section 208.3), effective January 1...
Pool PermitPermit requiredNot specifiedFY24/25 Building Fee Schedule, Pool Permits (Section 208.5), effective January 1, 2025:...
Roof Replacement PermitPermit requiredNot specifiedFY24/25 Building Fee Schedule: 'Roofing per 100 square feet' $10.00.
Shed PermitPermit requiredNot specifiedFY24/25 Building Fee Schedule: 'Garages, Accessory Buildings per 100 square feet'...
Solar PermitNot confirmedNot specifiedNot published

Everything we have verified about permits in Clay County