Shed Permit in Broward County, Florida
By Mario Bailey Last checked 2026-06-18 · 2 official sources
Verified against official sources Confirmed on official pagePermit required
Quick answer
A building permit is required for sheds in unincorporated Broward County. Applications must include two complete sets of building plans and a Registered Land Surveyor's Certificate. A Notice of Commencement is required for projects valued at $5000 or more. This applies to the Broward Municipal Services District (BMSD); incorporated cities have their own requirements.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help
Tell us where your project stands. Free to ask; no obligation.
Where we have a vetted local pro who handles permits in Broward County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.
When a permit is usually needed
Before constructing any shed or accessory storage structure
What your shed permit must meet in Florida
Florida sheds are built under the Florida Building Code, Residential, 8th Edition (2023), which requires structures to be designed for the state's wind loads, but Florida Statutes carve out two specific size-based reductions in what a shed must resist or include.
- As a structure, a shed is generally subject to the Florida Building Code's baseline wind-design requirement that applies to buildings and structures statewide (FBC Section 1609.1).
- Storage sheds not designed for human habitation with a floor area of 720 square feet or less are exempt from the code's mandatory windborne-debris-impact (opening protection) standard (F.S. 553.73(10)).
- Buildings of 400 square feet or less used in conjunction with a one- or two-family residence, which covers most sheds, are exempt from the code's door height and width requirements (F.S. 553.73(10)).
Based on Florida Statutes 553.73(10); Florida Building Code, 8th Edition (2023), Section 1609.1. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.
What shed permit costs in Broward County
No separate shed fee line; sheds fall under the Structural permit schedule, the greater of a $125 minimum base fee or 3.0% of job value, per Section 40.29 (Ord. 2025-038, eff. 5-1-25).
How Broward County compares in Florida
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Broward Countythis page | Permit required | Not specified |
| Hillsborough County | It depends | sheds under 150 sq ft are exempt; 150 sq ft or larger require a building permit |
| Lee County | Permit required | Not specified |
| Miami-Dade County | Permit required | only one utility shed up to 400 sq ft permitted per residential lot under County Code Section 33-20(k) |
| Orange County | Permit required | structures 120 sq ft or less require a zoning permit; structures over 120 sq ft require a full building permit with engineered plans |
| Palm Beach County | Permit required | Accessory storage enclosures (sheds) up to 6 ft x 6 ft x 6 ft high, for single-family dwellings only, qualify for a Type 1 Site Plan Review Permit (zoning review only, no Building Code plan review or inspection); sheds larger than that footprint or height require a standard Type 2(A) Building Permit with plan review and inspections. |
| Pasco County | It depends | Sheds of 150 square feet or less are exempt only if approved by and on file with the Florida DBPR Manufactured Building Program, with tie-downs installed and setbacks met, and not in a special flood hazard area. |
How to apply in Broward County
A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.
What most shed permit applications include:
- A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
- A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
- Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
- Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
- Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).
General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. Broward County Building Code Division sets the exact checklist for Broward County.
Where to apply in Broward County:
Broward County Building Code Division
- 2307 W Broward Blvd Suite 300, Fort Lauderdale, FL 33312
- Phone: (954) 765-4400
- Email: building@broward.org
Inspections and closing out your permit
A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
- Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
- Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
- Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
- For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Broward County permit portal or by phone at (954) 765-4400.
Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Shed Permit checklist for Broward County
- Confirm the requirement. Yes, a permit is required. Usually needed: Before constructing any shed or accessory storage structure.
- Budget the fee. No separate shed fee line; sheds fall under the Structural permit schedule, the greater of a $125 minimum base fee or 3.0% of job value, per Section 40.29 (Ord. 2025-038, eff. 5-1-25). Official fee schedule.
- Apply. A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing. Start at the Broward County permit portal.
- Keep the office details handy. Broward County Building Code Division. Phone: (954) 765-4400. Address: 2307 W Broward Blvd Suite 300, Fort Lauderdale, FL 33312.
- Plan for inspections. A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
Compiled from the official sources on this page. Last checked 2026-06-18.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Permitting activity in Broward County
In 2024, Broward County authorized permits for 1,655 new residential housing units (697 single-family, 958 in multi-family buildings), valued at $409M, down from3,047 the year before. That works out to about 0.8 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 2,037,472.
About Broward County
Broward County has about 863,128 housing units. The median home is valued at $380,400, against a median household income of $74,534. About 63% of homes are owner-occupied, and the typical home was built around 1980.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
Frequently asked questions
- Do you need a shed permit in Broward County?
- A building permit is required for sheds in unincorporated Broward County. Applications must include two complete sets of building plans and a Registered Land Surveyor's Certificate. A Notice of Commencement is required for projects valued at $5000 or more. This applies to the Broward Municipal Services District (BMSD); incorporated cities have their own requirements. Always confirm with the Broward County Building Code Division before starting.
- How much does a shed permit cost in Broward County?
- No separate shed fee line; sheds fall under the Structural permit schedule, the greater of a $125 minimum base fee or 3.0% of job value, per Section 40.29 (Ord. 2025-038, eff. 5-1-25). See the official fee schedule for current amounts.
- Where do you apply for a shed permit in Broward County?
- You can apply through the Broward County permit portal or contact the Broward County Building Code Division directly. The links are listed on this page.
From the Library
What else needs a permit in Broward County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Not specified | No separate deck fee line; |
| Electrical Permit | Permit required | Not specified | Electrical permit is the greater of a $125 minimum base fee or 3.0% of job value, per S... |
| Fence Permit | Permit required | Not specified | No separate fence fee line; |
| HVAC Permit | Permit required | Not specified | Mechanical (air conditioning and ventilation) permit is the greater of a $125 minimum b... |
| Patio Permit | Permit required | Not specified | No separate patio fee line; |
| Plumbing Permit | Permit required | Not specified | Plumbing permit is the greater of a $125 minimum base fee or 3.0% of job value, per Sec... |
| Pool Permit | Permit required | Not specified | Pool work needs separate Structural, Plumbing, Mechanical and Electrical permit applica... |
| Roof Replacement Permit | It depends | under F.S. 553.79(1)(g) (HB 803, ch. 2026-63, effective 2026-07-01), work valued at less than $7,500 on a single-family dwelling qualifies for exemption upon a written exemption request with documentation of the nature and value of the work; the exemption excludes electrical, plumbing, structural, mechanical, and gas work and any property in a flood hazard area; the statute does not name roofing, so a non-structural reroof under that value can qualify; confirm with Broward County Building Code Division. | Structural permit with a roofing-specific minimum: the greater of a $250 minimum base r... |
| Solar Permit | Permit required | Not specified | Not published |
Shed Permit in other Florida localities
Official sources
- https://www.broward.org/Building/BuildingPermits/Pages/BuildingPermits.aspx
- https://www.broward.org/Building/Forms/Pages/Building-Code-and-Permits.aspx
- https://calhouncounty.sc.gov/sites/calhouncounty/files/Documents/Calhoun%20County/Departments/Building%20and%20Planning/2018IRC/2018%20IRC%20Building%20Guide_Accessory%20Structure.pdf
- https://www.botetourtva.gov/DocumentCenter/View/739/Accessory-Structure-Guide-pdf
- https://www.flsenate.gov/laws/statutes/2023/553.73
Verified by a person against the sources above on 2026-06-18, not confirmed with Broward County Building Code Division. Rules change; confirm before you build. How we verify.
Last checked: 2026-06-18Report an error on this page
Florida rule changes
- Broward County, FL updates building permit fee schedule (Ordinance 2025-038)
Ord. 2025-038 · 2026-07-25
- Florida waives permits for small single-family jobs under $7,500 (HB 803)
ch. 2026-63 (HB 803), F.S. 553.79 · 2026-07-25
Compare
Shed Permit across Florida