Florida / Alachua County

Fence Permit in Alachua County, Florida

Permit required

Yes, a permit is required

Before erecting, enlarging, or altering a fence on unincorporated county property, since a fence is a structure under the county's general permit-required rule and is not on the county's published list of work exempt from a permit.

Quick answer

Alachua County's general rule requires a permit to construct, enlarge, alter, or erect any building or structure. The county's own "Work Exempt from Permit" section of its adopted local building code lists specific carve-outs for gas, mechanical, plumbing, and building work (minor repairs under $500, finish work, playground equipment, retractable awnings, small movable fixtures, and one qualifying storage shed) but does not list fences, so fences remain subject to the general permit requirement. This applies to unincorporated Alachua County; Gainesville, Alachua, High Springs, Newberry, Waldo, Hawthorne, Archer, Micanopy, and La Crosse each run their own building departments.

Issued by
Alachua County Department of Growth Management, Building Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Fence installers usually handle any required permit as part of the job. Compare a few bids before you commit.

Compare fence installer quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a fence permit costs in Alachua County

Fee schedule in force
Official scheduleRead .

No fence-specific flat fee is published.

Fences fall under the $150.00 minimum base permit fee for "all other building permits not charged a flat rate fee (i.e., mechanical, electrical, plumbing, aluminum, accessory buildings, etc.)" plus the dollar-value-of-construction fee, per the Building Fee Schedule effective 11/01/2025.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Alachua County compares in Florida

JurisdictionPermit needed?Threshold
Alachua Countythis pagePermit requiredAny size
Brevard CountyIt dependsPermit not required for repair or replacement of less than 50% of an existing fence using the same size and material in the same location.
Broward CountyPermit requiredAny size
Charlotte CountyPermit requiredA permit is not required for fence enclosures of garbage containers or mechanical equipment with three panels or less and one gate.
Clay CountyIt dependsvalue of repair or replacement work to existing wood fence pickets or panels, not including fence posts
Collier CountyPermit requiredAny size
Escambia CountyNo permit neededExempt

How to apply in Alachua County

General guide, not specific to this office

What a fence permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a fence permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Alachua County Department of Growth Management, Building Division

Permitting activity in Alachua County

In 2025, Alachua County authorized permits for 3,336 new residential housing units (689 single-family, 2,647 in multi-family buildings), valued at $598M, up from 1,750 the year before. That works out to about 11.5 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 290,028.

What else needs a permit in Alachua County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeNo deck-specific flat fee is published
Electrical PermitPermit requiredAny sizeNo electrical-specific flat fee is published
HVAC PermitPermit requiredAny sizeFlat fee: Res Mechanical Alt/Repair $110.00, per the Building Fee Schedule effective 11/01/2025
Plumbing PermitPermit requiredAny sizeNo plumbing-specific flat fee is published
Pool PermitPermit requiredAny sizeFlat fees: swimming pool (in-ground) $380.00, swimming pool (above-ground) $205.00, per the Building Fee Schedule effective 11/01/2025
Roof Replacement PermitIt dependsarea of roof repair or replacementFlat fee: Roof: New Residential $220.00, Roof: Repair Residential $220.00, per the Building Fee Schedule effective 11/01/2025
Shed PermitIt dependsarea of a single storage shed, exemption available once per propertyNo shed-specific flat fee is published for sheds that don't qualify for the exemption
Solar PermitPermit requiredAny sizeNo solar-specific flat fee is published

Frequently asked questions

Do you need a fence permit in Alachua County?
Yes, before erecting, enlarging, or altering a fence on unincorporated county property, since a fence is a structure under the county's general permit-required rule and is not on the county's published list of work exempt from a permit. If you are unsure how that applies to your project, call the Alachua County Department of Growth Management, Building Division at 352-374-5243 before you start.
How much does a fence permit cost in Alachua County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 13 Aug 2026. For the figure on your own project, call the Alachua County Department of Growth Management, Building Division at 352-374-5243.
Where do you apply for a fence permit in Alachua County?
You can apply through the Alachua County permit portal or contact the Alachua County Department of Growth Management, Building Division directly. The links are listed on this page.
Can a homeowner pull a fence permit themselves in Alachua County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Alachua County applies this before you apply.

From the Library

Fence Permit in other Florida localities

Everything above, sourced

How this fence permit page for Alachua County was verified. 2 official sources: growth-management.alachuacounty.us, growth-management.alachuacounty.us; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Alachua County Department of Growth Management, Building Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project