Florida / Escambia County

Solar Permit in Escambia County, Florida

Permit required

Yes, a permit is required

Before installing a solar photovoltaic system in unincorporated Escambia County or the Town of Century

Quick answer

Escambia County processes residential solar photovoltaic installations through its Electrical Permit Application, which lists 'Solar Photovoltaic' as one of its scope-of-work checkbox items alongside other electrical work types. The county does not publish a standalone Solar Permit application or page; solar water heaters and solar pool heaters are not separately named on any official Escambia County permitting page found. This applies to unincorporated Escambia County and the Town of Century; the City of Pensacola runs its own building department.

Issued by
Escambia County Building Services Department (Building Inspections Division / Plan Review Division)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your Florida Department of Business and Professional Regulation license active, and under which business name? Verify it on www.myfloridalicense.com.

Florida's owner-builder rule (F.S. 489.103(7)(a)-(c)) sets what you may do on your own home without hiring anyone. Read the statute.

What a solar permit costs in Escambia County

Permit fee
Not published

Escambia County publishes no fee for this permit type in a schedule we can verify. Ask Escambia County Building Services Department (Building Inspections Division / Plan Review Division) how the fee is calculated for your project.

How Escambia County compares in Florida

No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Alachua CountyPermit requiredNo solar-specific flat fee is published
Brevard CountyPermit requiredSee schedule
Charlotte CountyPermit requiredAt application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation is $50,000 or more) and a 0.025 x building-fee surcharge
Collier CountyPermit requiredSee schedule
Escambia Countythis pagePermit requiredNot published
Hernando CountyPermit requiredPhotovoltaic System (Res): $180.00
Hillsborough CountyPermit requiredResidential Photovoltaic trade permit fee is $250 flat, inspection-only with no plan review; the schedule has the rest

How to apply in Escambia County

General guide, not specific to this office

What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Escambia County Building Services Department (Building Inspections Division / Plan Review Division)

Permitting activity in Escambia County

In 2025, Escambia County authorized permits for 1,398 new residential housing units (1,366 single-family, 32 in multi-family buildings), valued at $411M, down from 1,462 the year before. That works out to about 4.2 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 333,834.

What else needs a permit in Escambia County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?Threshold
Deck PermitPermit requiredAny size
Electrical PermitPermit requiredAny size
Fence PermitNo permit neededExempt
HVAC PermitPermit requiredAny size
Patio PermitPermit requiredAny size
Plumbing PermitPermit requiredAny size
Pool PermitPermit requiredAny size
Roof Replacement PermitIt dependsA Re-Roofing Permit is required for re-roofs exceeding 2 squares (1 square equals 100 square feet, so 2 squares equals 200 square feet); roof repair work under two squares does not require a permit.
Shed PermitIt dependsA portable, skid-mounted utility shed under 120 square feet does not require a permit; any utility shed with a poured slab or a post installed into the earth requires a permit regardless of size.

Frequently asked questions

Do you need a solar permit in Escambia County?
Yes, before installing a solar photovoltaic system in unincorporated Escambia County or the Town of Century. If you are unsure how that applies to your project, call the permit office at (850) 595-3550 before you start.
How much does a solar permit cost in Escambia County?
We found no published fee for a solar permit in Escambia County. To learn how it is calculated for your project, call the permit office at (850) 595-3550.
Where do you apply for a solar permit in Escambia County?
You can apply through the Escambia County permit portal or contact the Escambia County Building Services Department (Building Inspections Division / Plan Review Division) directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Escambia County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Escambia County applies this before you apply.

From the Library

Solar Permit in other Florida localities

Everything above, sourced

How this solar permit page for Escambia County was verified. 2 official sources: myescambia.com, myescambia.com. Last checked by Mario Bailey, not confirmed with Escambia County Building Services Department (Building Inspections Division / Plan Review Division). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project