Solar Permit in Brevard County, Florida
Permit required
Yes, a permit is required
Before installing or replacing a residential solar photovoltaic system in unincorporated Brevard County
By Mario Bailey, verified against official sources
Quick answer
Brevard County requires a Residential Solar Photovoltaic permit for the installation or replacement of a photovoltaic system on a home in unincorporated Brevard County. The application requires county staff review and construction plans, and licensed contractors (building, electrical, general, residential, or solar) can apply online through BASS; property owners acting as their own contractor must apply in person. Incorporated cities within Brevard County have their own building departments and solar permitting processes.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
When a permit is usually needed
Before installing or replacing a residential solar photovoltaic system in unincorporated Brevard County
What a solar permit costs in Brevard County
How Brevard County compares in Florida
No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Alachua County | Permit required | No solar-specific flat fee is published |
| Brevard Countythis page | Permit required | Brevard's Residential Solar Photovoltaic Permit Application fee table lists a... |
| Charlotte County | Permit required | At application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if... |
| Collier County | Permit required | Fee Schedule (Resolution 2025-231, effective January 1, 2026), Solar Permit... |
| Hernando County | Permit required | Photovoltaic System (Res): $180.00 |
| Hillsborough County | Permit required | Residential Photovoltaic trade permit fee is $250 flat, inspection-only with... |
| Jacksonville | Permit required | City Fees schedule (Municipal Code Section 320.409): Plumbing Permit Fees... |
How to apply in Brevard County
A rooftop solar PV permit application is a combined structural and electrical plan set: a site plan and roof framing details proving the array's mounting can carry its added loads, plus a one line electrical diagram covering listed modules and inverters, disconnects, and the rapid shutdown design. Utility interconnection is a separate approval that runs in parallel with the permit.
What most solar permit applications include:
- Both a building permit and a separate electrical permit are required, since the array must be designed and installed to the residential code's solar provisions and to the National Electrical Code (IRC R324.3).
- The plan set identifies listed equipment: PV modules listed to UL 1703 (or both UL 61730-1 and UL 61730-2), and inverters listed to UL 1741, with grid-tied inverters listed for utility interaction (IRC R324.3.1).
- Structural drawings show that the roof framing is designed to structurally support the array and withstand the gravity loads it adds (IRC R324.4.1).
- The site plan lays out roof access pathways at least 36 inches wide, plus a ridge setback sized to how much of the roof the array covers, so firefighters retain pathways and ventilation access (IRC R324.6.1, IRC R324.6.2).
- The one line electrical diagram shows the rapid shutdown method and the location of its single initiation device, since one control point must bring all system conductors down to safe levels (NEC 690.12, NEC 690.56(C)).
- Interconnecting the array to the utility grid at a defined point of connection is a separate application process from the local building or electrical permit and must be approved before the system can operate (NEC 705.12).
- Some permitting offices route applications through SolarAPP+, an automated review platform that checks the plan set against code requirements and issues eligible permits instantly (DOE SolarAPP+).
General submittal guidance from IRC 2021 R324 (Solar Energy Systems) and NEC 2020 Article 690 (Solar Photovoltaic Systems) and Article 705 (Interconnected Power Production Sources). Source. Brevard County Planning and Development Department, Building Permits Division sets the exact checklist for Brevard County.
Where to apply in Brevard County:
Brevard County Planning and Development Department, Building Permits Division
- 2725 Judge Fran Jamieson Way, Room A114, Viera, FL 32940
- Phone: (321) 633-2187
- Email: Building.Licensing@BrevardFL.gov
Inspections and closing out your permit
Inspectors verify the installed array against the approved plans, and some agencies run a rough check of roof attachments and penetrations while they are still exposed before the wiring and roofing close them in. The final inspection confirms rapid shutdown, disconnects, grounding, and required labels are installed correctly, and the system cannot be energized until the utility separately approves interconnection.
- Where an agency runs a rough or pre-inspection, it checks the array's roof penetrations while they are still exposed, confirming they are flashed and sealed (IRC R324.4.3).
- The inspector confirms whether rapid shutdown is required, how it is accomplished, and that it is properly identified (NEC 690.12, NEC 690.56(C)).
- PV disconnecting means must be permanently marked and installed where they are readily accessible, which the inspector confirms in the field (NEC 690.13).
- Bonding and grounding of the array, including every exposed non current carrying metal part and the grounding electrode system, is checked before sign off (NEC 690.43, NEC 690.47).
- At the service equipment, the inspector looks for the required rapid shutdown placard, a labeled diagram showing the initiation device's location in the specified colors and letter sizes (NEC 690.56(C)).
- Utility interconnection is inspected and approved separately from the local building department's sign off, and the system cannot be energized until both approvals are in hand (NEC 705.12).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Brevard County permit portal or by phone at (321) 633-2187.
Inspection sequence from NEC 2020 Article 690 (690.12 rapid shutdown, 690.13 disconnects, 690.43/690.47 grounding, 690.56 labeling) and IRC 2021 R324.4.3 (roof penetrations). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Solar Permit checklist for Brevard County
- Confirm the requirement. Yes, a permit is required. Usually needed: Before installing or replacing a residential solar photovoltaic system in unincorporated Brevard County.
- Budget the fee. Brevard's Residential Solar Photovoltaic Permit Application fee table lists a Building Code Review fee of $75.00 for the first $1,000 of job value plus $3.25 per $1,000 thereafter, plus a $25.00 Application Processing Fee and state surcharges of 1.5% (BCA) and 1% (FBC); no Land Development, Natural Resources, or Zoning Review line items are listed. No effective date is shown.
- Apply. A rooftop solar PV permit application is a combined structural and electrical plan set: a site plan and roof framing details proving the array's mounting can carry its added loads, plus a one line electrical diagram covering listed modules and inverters, disconnects, and the rapid shutdown design. Utility interconnection is a separate approval that runs in parallel with the permit. Start at the Brevard County permit portal.
- Keep the office details handy. Brevard County Planning and Development Department, Building Permits Division. Phone: (321) 633-2187. Address: 2725 Judge Fran Jamieson Way, Room A114, Viera, FL 32940.
- Plan for inspections. Inspectors verify the installed array against the approved plans, and some agencies run a rough check of roof attachments and penetrations while they are still exposed before the wiring and roofing close them in. The final inspection confirms rapid shutdown, disconnects, grounding, and required labels are installed correctly, and the system cannot be energized until the utility separately approves interconnection.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a solar permit in Brevard County?
- Brevard County requires a Residential Solar Photovoltaic permit for the installation or replacement of a photovoltaic system on a home in unincorporated Brevard County. The application requires county staff review and construction plans, and licensed contractors (building, electrical, general, residential, or solar) can apply online through BASS; property owners acting as their own contractor must apply in person. Incorporated cities within Brevard County have their own building departments and solar permitting processes. Always confirm with the Brevard County Planning and Development Department, Building Permits Division before starting.
- How much does a solar permit cost in Brevard County?
- Brevard's Residential Solar Photovoltaic Permit Application fee table lists a Building Code Review fee of $75.00 for the first $1,000 of job value plus $3.25 per $1,000 thereafter, plus a $25.00 Application Processing Fee and state surcharges of 1.5% (BCA) and 1% (FBC); no Land Development, Natural Resources, or Zoning Review line items are listed. No effective date is shown. Contact the office for current amounts.
- Where do you apply for a solar permit in Brevard County?
- You can apply through the Brevard County permit portal or contact the Brevard County Planning and Development Department, Building Permits Division directly. The links are listed on this page.
- Can a homeowner pull a solar permit themselves in Brevard County?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Brevard County applies this before you apply.
From the Library
What else needs a permit in Brevard County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Not specified | Not published |
| Electrical Permit | It depends | Permits are required for the installation or replacement of electrical wiring, meter cans, and breaker panels; this does not include changing fixtures that do not require moving or changing wiring. | Brevard's Residential Electrical Permit Application fee table lists a Building Code... |
| Fence Permit | It depends | Permit not required for repair or replacement of less than 50% of an existing fence using the same size and material in the same location. | Brevard's Residential Fence Permit Application fee table lists a $25.00 Application... |
| HVAC Permit | Permit required | Not specified | Brevard's Residential HVAC/Mechanical Permit Application fee table lists a Building Code... |
| Plumbing Permit | It depends | Permits are required for the installation or replacement of water, sewer, or gas piping and systems; this does not include changing like-for-like water heaters or fixtures such as sinks. | Brevard's Residential Plumbing Permit Application fee table lists a Building Code Review... |
| Pool Permit | It depends | Permits are issued for in-ground pools and spas, and for above-ground pools with a depth of 24 inches or greater. | Brevard's Residential Pool Permit Application fee table lists a Building Code Review fee... |
| Roof Replacement Permit | Permit required | Not specified | Brevard's Residential Reroof Permit Application fee table lists a Building Code Review... |
| Shed Permit | It depends | A permit is required for an accessory structure (shed) over 100 square feet. | Sheds are filed under the Residential Addition permit category, whose fee table lists a... |
Solar Permit in other Florida localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Brevard County documents; the office above sets the local rules.
Verified by a person against the sources above on , not confirmed with Brevard County Planning and Development Department, Building Permits Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Permit office
Brevard County Planning and Development Department, Building Permits Division
(321) 633-2187Permit portalFlorida rule changes
- Broward County, FL updates building permit fee schedule (Ordinance 2025-038)
Ord. 2025-038 ·
- Florida waives permits for small single-family jobs under $7,500 (HB 803)
ch. 2026-63 (HB 803), F.S. 553.79 ·
Compare
Solar Permit across Florida