Florida / Brevard County

Solar Permit in Brevard County, Florida

Permit required

Yes, a permit is required

Before installing or replacing a residential solar photovoltaic system in unincorporated Brevard County

Quick answer

Brevard County requires a Residential Solar Photovoltaic permit for the installation or replacement of a photovoltaic system on a home in unincorporated Brevard County. The application requires county staff review and construction plans, and licensed contractors (building, electrical, general, residential, or solar) can apply online through BASS; property owners acting as their own contractor must apply in person. Incorporated cities within Brevard County have their own building departments and solar permitting processes.

Issued by
Brevard County Planning and Development Department, Building Permits Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your Florida Department of Business and Professional Regulation license active, and under which business name? Verify it on www.myfloridalicense.com.

Florida's owner-builder rule (F.S. 489.103(7)(a)-(c)) sets what you may do on your own home without hiring anyone. Read the statute.

What a solar permit costs in Brevard County

  • Brevard's Residential Solar Photovoltaic Permit Application fee table lists a Building Code Review fee of $75.00 for the first $1,000 of job value plus $3.25 per $1,000 thereafter, plus a $25.00 Application Processing Fee and state surcharges of 1.5% (BCA) and 1% (FBC);
  • no Land Development, Natural Resources, or Zoning Review line items are listed.
  • No effective date is shown.

How Brevard County compares in Florida

No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Alachua CountyPermit requiredNo solar-specific flat fee is published
Brevard Countythis pagePermit requiredSee schedule
Charlotte CountyPermit requiredAt application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation is $50,000 or more) and a 0.025 x building-fee surcharge
Collier CountyPermit requiredSee schedule
Hernando CountyPermit requiredPhotovoltaic System (Res): $180.00
Hillsborough CountyPermit requiredResidential Photovoltaic trade permit fee is $250 flat, inspection-only with no plan review; the schedule has the rest
JacksonvillePermit requiredCity Fees schedule (Municipal Code Section 320.409): Plumbing Permit Fees lists a Solar water heater line item at $21.00

How to apply in Brevard County

General guide, not specific to this office

What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Brevard County Planning and Development Department, Building Permits Division

Permitting activity in Brevard County

In 2025, Brevard County authorized permits for 4,624 new residential housing units (3,376 single-family, 1,248 in multi-family buildings), valued at $1.6B, up from 4,603 the year before. That works out to about 7 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 663,982.

What else needs a permit in Brevard County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeNot published
Electrical PermitIt dependsPermits are required for the installation or replacement of electrical wiring, meter cans, and breaker panels; this does not include changing fixtures that do not require moving or changing wiring.See schedule
Fence PermitIt dependsPermit not required for repair or replacement of less than 50% of an existing fence using the same size and material in the same location.Brevard's Residential Fence Permit Application fee table lists a $25.00 Application Processing Fee, a $34.00 flat Building Code fee; the schedule has the rest
HVAC PermitPermit requiredAny sizeSee schedule
Plumbing PermitIt dependsPermits are required for the installation or replacement of water, sewer, or gas piping and systems; this does not include changing like-for-like water heaters or fixtures such as sinks.See schedule
Pool PermitIt dependsPermits are issued for in-ground pools and spas, and for above-ground pools with a depth of 24 inches or greater.See schedule
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitIt dependsA permit is required for an accessory structure (shed) over 100 square feet.See schedule

Frequently asked questions

Do you need a solar permit in Brevard County?
Yes, before installing or replacing a residential solar photovoltaic system in unincorporated Brevard County. If you are unsure how that applies to your project, call the Brevard County Planning and Development Department, Building Permits Division at (321) 633-2187 before you start.
How much does a solar permit cost in Brevard County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 8 Aug 2026. For the figure on your own project, call the Brevard County Planning and Development Department, Building Permits Division at (321) 633-2187.
Where do you apply for a solar permit in Brevard County?
You can apply through the Brevard County permit portal or contact the Brevard County Planning and Development Department, Building Permits Division directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Brevard County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Brevard County applies this before you apply.

From the Library

Solar Permit in other Florida localities

Everything above, sourced

How this solar permit page for Brevard County was verified. 2 official sources: brevardfl.gov, brevardfl.gov. Last checked by Mario Bailey, not confirmed with Brevard County Planning and Development Department, Building Permits Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page