Solar Permit in Santa Rosa County, Florida
Permit required
Yes, a permit is required
Needed for a residential solar installation as a combined Building and Electrical permit; the electrical permit covers the interconnection work.
Quick answer
Santa Rosa County prices solar installation as its own line item under both the Building Permits and Electrical Permits tables of its Development Services Fee Schedule, and the county's Electrical Permit Application form lists Solar as a distinct job type alongside items like Pool and Accessory Building. No dedicated county web page, checklist, or prose statement specifically describing residential solar permitting was found; the fee-schedule listings and the application checkbox are the county's own documentary evidence that solar work is permitted (and charged) separately from general electrical work.
- Issued by
- Development Services (Permitting & Building Compliance Division)
- Phone
- 850-981-7000
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your Florida Department of Business and Professional Regulation license active, and under which business name? Verify it on www.myfloridalicense.com.
Florida's owner-builder rule (F.S. 489.103(7)(a)-(c)) sets what you may do on your own home without hiring anyone. Read the statute.
What a solar permit costs in Santa Rosa County
- Fee schedule in force
- Official scheduleRead .
Resolution No. 2025-29 lists 'Solar Systems' as its own Building Permits line item at $67.00 (single-family detached) / $66.50 (all other construction), and a separate 'Solar System' line item under Electrical Permits, New Construction, at $150.00 (single-family detached) / $250.00 (all other construction).
The Electrical Permit Application form also lists 'Solar' as one of its job-type checkboxes.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Santa Rosa County compares in Florida
No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Alachua County | Permit required | No solar-specific flat fee is published |
| Brevard County | Permit required | See schedule |
| Charlotte County | Permit required | At application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation is $50,000 or more) and a 0.025 x building-fee surcharge |
| Collier County | Permit required | See schedule |
| Hernando County | Permit required | Photovoltaic System (Res): $180.00 |
| Hillsborough County | Permit required | Residential Photovoltaic trade permit fee is $250 flat, inspection-only with no plan review; the schedule has the rest |
| Santa Rosa Countythis page | Permit required | See schedule |
How to apply in Santa Rosa County
General guide, not specific to this office
What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Development Services (Permitting & Building Compliance Division)
- 6051 Old Bagdad Highway, Suite 202, Milton, FL 32583
- Phone: 850-981-7000
- Email: srcpermits@santarosa.fl.gov
Your Solar Permit checklist for Santa Rosa County
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: santarosa.fl.gov: Development Services.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Santa Rosa County permit portal.
- Keep the office details handy. Development Services (Permitting & Building Compliance Division). Phone: 850-981-7000. Email: srcpermits@santarosa.fl.gov. Address: 6051 Old Bagdad Highway, Suite 202, Milton, FL 32583.
Compiled from the official sources on this page. Last checked .
Permitting activity in Santa Rosa County
In 2025, Santa Rosa County authorized permits for 1,929 new residential housing units, valued at $456M, down from 1,983 the year before. That works out to about 9.1 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 211,115.
What else needs a permit in Santa Rosa County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Any size | See schedule |
| Electrical Permit | Permit required | Any size | See schedule |
| Fence Permit | No permit needed | Exempt | Not published |
| HVAC Permit | Permit required | Any size | See schedule |
| Plumbing Permit | Permit required | Any size | See schedule |
| Pool Permit | Permit required | Any size | Per the Pool Permit checklist: Residential In-Ground Pool $313.17 |
| Roof Replacement Permit | Permit required | Any size | Resolution No. 2025-29 lists 'Roofing Permit New or Re-roof' at $67.00 (single-family detached) / $133.00 (all other construction); the schedule has the rest |
| Shed Permit | It depends | gross floor area, plus all covered area, of a residential storage accessory building, for eligibility to request the no-permit exemption under Ordinance 2010-17 | See schedule |
Frequently asked questions
- Do you need a solar permit in Santa Rosa County?
- Yes. Needed for a residential solar installation as a combined Building and Electrical permit; the electrical permit covers the interconnection work. If you are unsure how that applies to your project, call the permit office at 850-981-7000 before you start.
- How much does a solar permit cost in Santa Rosa County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 850-981-7000.
- Where do you apply for a solar permit in Santa Rosa County?
- You can apply through the Santa Rosa County permit portal or contact the Development Services (Permitting & Building Compliance Division) directly. The links are listed on this page.
- Can a homeowner pull a solar permit themselves in Santa Rosa County?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Santa Rosa County applies this before you apply.
From the Library
Solar Permit in other Florida localities
Everything above, sourced
How this solar permit page for Santa Rosa County was verified. 2 official sources: santarosa.fl.gov, santarosa.fl.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Development Services (Permitting & Building Compliance Division). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page