Roof Replacement Permit in Santa Rosa County, Florida

Permit required

Yes, a permit is required

Needed for new roofs, tear-off/re-roof replacement of roof covering, and recovering an existing roof where Florida Building Code R907.3 recover-versus-replace criteria allow it. Commercial roofing needs prior Plan Review approval, and any product other than standard asphalt shingles needs a Florida Product Approval number. A roofing inspection affidavit certifying roof-deck nailing and secondary water barrier work must be submitted before final inspection.

Quick answer

Santa Rosa County requires a building permit for new roofs, full roof replacement (tear-off/re-roof), and recovering an existing roof, subject to Florida Building Code criteria on when recovering (versus full tear-off) is allowed. A Notice of Commencement must be recorded for roofing work costing $2,500 or more. In July 2026 the county publicly clarified that Florida's new exemption for residential work under $7,500 (which it calls House Bill 803 / HB 803, matching the ch. 2026-63 amendment to F.S. 553.79 described in this brief) does not cover roofing: the county's guidance lists roof replacement among the Florida Building Code work that 'continue[s] to require permits regardless of project cost.'

Issued by
Development Services (Permitting & Building Compliance Division)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Roofers handle the permit in most localities when one is required. Comparing bids before you sign is the useful next step.

Compare roofing quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a roof replacement permit costs in Santa Rosa County

Fee schedule in force
Official scheduleRead .

Resolution No. 2025-29 lists 'Roofing Permit New or Re-roof' at $67.00 (single-family detached) / $133.00 (all other construction), plus $199.50 (all other construction) for a 'Special Membrane Roof that requires multiple inspections'.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Santa Rosa County compares in Florida

JurisdictionPermit needed?Threshold
Alachua CountyIt dependsarea of roof repair or replacement
Brevard CountyPermit requiredAny size
Broward CountyIt dependsA roofing permit is required for reroofing. Florida law exempts work valued at less than $7,500 on a single-family dwelling on written request, but not structural, electrical, plumbing, mechanical or gas work and not property in a flood hazard area; no Broward County page says whether a reroof can use that exemption, so confirm with the Building Code Division.
Charlotte CountyPermit requiredRoof repairs less than 100 square feet (one square) where the work does not include repairs to trusses or rafters do not require a permit.
Clay CountyPermit requiredAny size
Collier CountyPermit requiredCollier County's locally adopted building code amendment exempts from permit only the repair of any roof covering not exceeding $1,500.00 in value of materials and labor, or repair work not exceeding two roofing squares (200 square feet) in extent; this exemption is for roof repair, not for roof replacement/reroofing (removing and replacing the covering), which requires a standard Reroof permit.
Santa Rosa Countythis pagePermit requiredAny size

How to apply in Santa Rosa County

General guide, not specific to this office

What a roof replacement permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a roof replacement permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Development Services (Permitting & Building Compliance Division)

Permitting activity in Santa Rosa County

In 2025, Santa Rosa County authorized permits for 1,929 new residential housing units, valued at $456M, down from 1,983 the year before. That works out to about 9.1 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 211,115.

What else needs a permit in Santa Rosa County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeSee schedule
Electrical PermitPermit requiredAny sizeSee schedule
Fence PermitNo permit neededExemptNot published
HVAC PermitPermit requiredAny sizeSee schedule
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitPermit requiredAny sizePer the Pool Permit checklist: Residential In-Ground Pool $313.17
Shed PermitIt dependsgross floor area, plus all covered area, of a residential storage accessory building, for eligibility to request the no-permit exemption under Ordinance 2010-17See schedule
Solar PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a roof replacement permit in Santa Rosa County?
Yes. Needed for new roofs, tear-off/re-roof replacement of roof covering, and recovering an existing roof where Florida Building Code R907.3 recover-versus-replace criteria allow it. Commercial roofing needs prior Plan Review approval, and any product other than standard asphalt shingles needs a Florida Product Approval number. A roofing inspection affidavit certifying roof-deck nailing and secondary water barrier work must be submitted before final inspection. If you are unsure how that applies to your project, call the permit office at 850-981-7000 before you start.
How much does a roof replacement permit cost in Santa Rosa County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 850-981-7000.
Where do you apply for a roof replacement permit in Santa Rosa County?
You can apply through the Santa Rosa County permit portal or contact the Development Services (Permitting & Building Compliance Division) directly. The links are listed on this page.
Can a homeowner pull a roof replacement permit themselves in Santa Rosa County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Santa Rosa County applies this before you apply.

From the Library

Roof Replacement Permit in other Florida localities

Everything above, sourced

How this roof replacement permit page for Santa Rosa County was verified. 2 official sources: santarosa.fl.gov, santarosa.fl.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Development Services (Permitting & Building Compliance Division). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project