Florida / Santa Rosa County

Pool Permit in Santa Rosa County, Florida

Permit required

Yes, a permit is required

Needed to install any pool or spa. A recorded Notice of Commencement is required if the project's cost of construction is $5,000 or more, and a notarized Barrier/Alarm Acknowledgment Form is required for all pools before the pool is filled with water.

Quick answer

Santa Rosa County requires a building permit application for all residential and commercial pool and spa installations, along with an engineered lot grading plan (for lots in unincorporated areas), a site plan or city approval, a pool layout drawing, and a notarized Barrier/Alarm Acknowledgment Form documenting compliance with Chapter 515, F.S. barrier or alarm requirements. Projects on Navarre Beach or in FEMA Flood Zone V need plans sealed by a Florida-certified architect or engineer.

Issued by
Development Services (Permitting & Building Compliance Division)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.

Compare pool builder quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What your pool permit must meet in Florida

Florida residential pools are built under the Florida Building Code, Residential, 8th Edition (2023), which the Legislature requires to incorporate the safety-feature and barrier standards of the Residential Swimming Pool Safety Act (Florida Statutes Chapter 515).

  • State law requires the Florida Building Code to uniformly implement the pool-safety statutes by including standards for residential swimming pool barriers, pool covers, latching devices, and door and window exit alarms (F.S. 553.73).
  • A new residential pool must be built with at least one of five listed safety features, not necessarily a fence: a compliant barrier, an approved safety pool cover, exit alarms on doors and windows with access to the pool, self-closing self-latching doors, or a certified pool alarm (F.S. 515.27).
  • If a barrier is used, it must be at least 4 feet high on the outside and may not have gaps, openings, indentations, or structural components that could let a young child crawl under, squeeze through, or climb over it, placed far enough from the water's edge that a child who gets past it does not immediately fall in (F.S. 515.29).
  • Pool gates must open outward away from the pool, be self-closing, and have a self-latching device with its release mechanism on the pool side, positioned out of a young child's reach (F.S. 515.29).
  • Where a removable mesh safety barrier is used, it must comply with ASTM F2286 and may not be installed on top of an above-ground or on-ground pool (FBC-R, 8th Edition change).

Based on Florida Statutes Chapter 515 (Residential Swimming Pool Safety Act, ss. 515.27, 515.29) as implemented by the Florida Building Code, Residential, 8th Edition (2023), Chapter 45. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.

What a pool permit costs in Santa Rosa County

Fee schedule in force
Official scheduleRead .
  • Per the Pool Permit checklist: Residential In-Ground Pool $313.17;
  • Residential Spa, Hot Tub, or Above-Ground Pool $203.57;
  • Commercial In-Ground Pool $277.08.
  • Residential pool permit fees include an $85.00 site permit fee and a $25.00 zoning review fee, which do not apply if the property is in the city limits of Jay, Milton, or Gulf Breeze.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Santa Rosa County compares in Florida

JurisdictionPermit needed?Threshold
Alachua CountyPermit requiredAny size
Brevard CountyIt dependsPermits are issued for in-ground pools and spas, and for above-ground pools with a depth of 24 inches or greater.
Broward CountyPermit requiredAny size
Charlotte CountyPermit requiredThis residential pool/spa permit type includes spas, swim spas, and above-ground pools that are 24 inches or greater in depth.
Clay CountyPermit requiredAny size
Collier CountyPermit requiredAny size
Santa Rosa Countythis pagePermit requiredAny size

How to apply in Santa Rosa County

General guide, not specific to this office

What a pool permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a pool permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Development Services (Permitting & Building Compliance Division)

Permitting activity in Santa Rosa County

In 2025, Santa Rosa County authorized permits for 1,929 new residential housing units, valued at $456M, down from 1,983 the year before. That works out to about 9.1 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 211,115.

What else needs a permit in Santa Rosa County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeSee schedule
Electrical PermitPermit requiredAny sizeSee schedule
Fence PermitNo permit neededExemptNot published
HVAC PermitPermit requiredAny sizeSee schedule
Plumbing PermitPermit requiredAny sizeSee schedule
Roof Replacement PermitPermit requiredAny sizeResolution No. 2025-29 lists 'Roofing Permit New or Re-roof' at $67.00 (single-family detached) / $133.00 (all other construction); the schedule has the rest
Shed PermitIt dependsgross floor area, plus all covered area, of a residential storage accessory building, for eligibility to request the no-permit exemption under Ordinance 2010-17See schedule
Solar PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a pool permit in Santa Rosa County?
Yes. Needed to install any pool or spa. A recorded Notice of Commencement is required if the project's cost of construction is $5,000 or more, and a notarized Barrier/Alarm Acknowledgment Form is required for all pools before the pool is filled with water. If you are unsure how that applies to your project, call the permit office at 850-981-7000 before you start.
How much does a pool permit cost in Santa Rosa County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 850-981-7000.
Where do you apply for a pool permit in Santa Rosa County?
You can apply through the Santa Rosa County permit portal or contact the Development Services (Permitting & Building Compliance Division) directly. The links are listed on this page.
Can a homeowner pull a pool permit themselves in Santa Rosa County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Santa Rosa County applies this before you apply.

From the Library

Pool Permit in other Florida localities

Everything above, sourced

How this pool permit page for Santa Rosa County was verified. 2 official sources: santarosa.fl.gov, santarosa.fl.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Development Services (Permitting & Building Compliance Division). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project