Roof Replacement Permit in Lake County, Florida
Permit required
Yes, a permit is required
Before replacing, recovering, or roofing over an existing roof in unincorporated Lake County
Quick answer
Lake County's fee schedule prices residential roofing by square footage, and the Office of Building Services publishes a dedicated Re-Roof/Roof Over checklist (CL16) requiring a permit application, a notarized Reroof Scope of Work/Roofing Affidavit (BF61), and progress photographs of sheathing and underlayment for the final inspection. No exemption for roof replacement or recovering appears in the county's published exempt-work list. This applies to unincorporated Lake County; the cities of Clermont, Leesburg, Eustis, Mount Dora, Tavares, and other incorporated municipalities in the county run their own building departments.
- Issued by
- Office of Building Services
- Phone
- 352-343-9653
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Roofers handle the permit in most localities when one is required. Comparing bids before you sign is the useful next step.
Compare roofing quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a roof replacement permit costs in Lake County
- Fee schedule in force
- Official scheduleRead .
Residential Roofing (per square foot): $0.03, per the county's FY 2026 Adopted Fee Schedule (Office of Building Services).
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Lake County compares in Florida
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Alachua County | It depends | area of roof repair or replacement |
| Brevard County | Permit required | Any size |
| Broward County | It depends | A roofing permit is required for reroofing. Florida law exempts work valued at less than $7,500 on a single-family dwelling on written request, but not structural, electrical, plumbing, mechanical or gas work and not property in a flood hazard area; no Broward County page says whether a reroof can use that exemption, so confirm with the Building Code Division. |
| Charlotte County | Permit required | Roof repairs less than 100 square feet (one square) where the work does not include repairs to trusses or rafters do not require a permit. |
| Clay County | Permit required | Any size |
| Collier County | Permit required | Collier County's locally adopted building code amendment exempts from permit only the repair of any roof covering not exceeding $1,500.00 in value of materials and labor, or repair work not exceeding two roofing squares (200 square feet) in extent; this exemption is for roof repair, not for roof replacement/reroofing (removing and replacing the covering), which requires a standard Reroof permit. |
| Lake Countythis page | Permit required | Any size |
How to apply in Lake County
General guide, not specific to this office
What a roof replacement permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a roof replacement permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Office of Building Services
- 320 W. Main St., Tavares, FL 32778 (mailing: P.O. Box 7800, Tavares, FL 32778)
- Phone: 352-343-9653
- Email: permitting@lakecountyfl.gov
Your Roof Replacement Permit checklist for Lake County
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: lakecountyfl.gov: building services.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Lake County permit portal.
- Keep the office details handy. Office of Building Services. Phone: 352-343-9653. Email: permitting@lakecountyfl.gov. Address: 320 W. Main St., Tavares, FL 32778 (mailing: P.O. Box 7800, Tavares, FL 32778).
Compiled from the official sources on this page. Last checked .
Permitting activity in Lake County
In 2025, Lake County authorized permits for 5,342 new residential housing units (3,999 single-family, 1,343 in multi-family buildings), valued at $1.5B, up from 4,990 the year before. That works out to about 11.7 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 456,068.
What else needs a permit in Lake County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | A deck built by the property owner on the owner's own personal residence is exempt from a building permit if it does not exceed 30 inches above grade and a 120-square-foot footprint | See schedule |
| Electrical Permit | Permit required | Any size | Residential Trades - Electric, Plumbing, Mechanical, Gas (to include new, change-outs, upgrades): $0.03 per square foot, $100 minimum; the schedule has the rest |
| Fence Permit | It depends | Masonry or concrete fences 4 feet or less in height, and fences of any other material 6 feet or less in height, are exempt from a building permit under the county's Chapter 6 building-code amendment | See schedule |
| HVAC Permit | Permit required | Any size | Residential Trades - Electric, Plumbing, Mechanical, Gas (to include new, change-outs, upgrades): $0.03 per square foot, $100 minimum; the schedule has the rest |
| Plumbing Permit | Permit required | Any size | Residential Trades - Electric, Plumbing, Mechanical, Gas (to include new, change-outs, upgrades): $0.03 per square foot, $100 minimum; the schedule has the rest |
| Pool Permit | It depends | Storable swimming or wading pools capable of holding water to a maximum depth of 42 inches, or pools with nonmetallic molded polymeric or inflatable fabric walls regardless of dimension, are exempt from a building permit except for non-cord-and-plug electrical work | Private Above-ground Swimming Pools or self contained spa (includes electric): $91.00 |
| Shed Permit | It depends | A shed built by the property owner on the owner's own personal residence, with no electrical, HVAC, fuel gas, or plumbing, is exempt from a building permit up to a 120-square-foot footprint | See schedule |
| Solar Permit | Permit required | Any size | See schedule |
Frequently asked questions
- Do you need a roof replacement permit in Lake County?
- Yes, before replacing, recovering, or roofing over an existing roof in unincorporated Lake County. If you are unsure how that applies to your project, call the Office of Building Services at 352-343-9653 before you start.
- How much does a roof replacement permit cost in Lake County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 13 Aug 2026. For the figure on your own project, call the Office of Building Services at 352-343-9653.
- Where do you apply for a roof replacement permit in Lake County?
- You can apply through the Lake County permit portal or contact the Office of Building Services directly. The links are listed on this page.
- Can a homeowner pull a roof replacement permit themselves in Lake County?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Lake County applies this before you apply.
From the Library
Roof Replacement Permit in other Florida localities
Everything above, sourced
How this roof replacement permit page for Lake County was verified. 2 official sources: lakecountyfl.gov, cdn.lakecountyfl.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Office of Building Services. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page