Florida / Seminole County

Roof Replacement Permit in Seminole County, Florida

Permit required

Yes, a permit is required

Before replacing a roof in unincorporated Seminole County (minor roof repairs of 100 square feet or less are exempt)

Quick answer

Seminole County's Storm Damage Repair guidance lists roof repairs exceeding 100 square feet among the work that requires a building permit, while roof repairs not exceeding 100 square feet are listed as not requiring one; a full roof replacement, which virtually always exceeds that area, is billed under the county's Re-roof fee-schedule category. This applies to unincorporated Seminole County; the cities of Sanford, Altamonte Springs, Casselberry, Lake Mary, Longwood, Oviedo, and Winter Springs operate their own building departments. Starting July 1, 2026, a new state law (ch. 2026-63, F.S. 553.79) lets an owner request a written, documented exemption for qualifying single-family home work valued under $7,500, but the county's own new-state-legislation page does not name roofing among the work categories eligible for that request.

Typical threshold
Roof repairs not exceeding 100 square feet do not require a permit; roof repairs exceeding 100 square feet do require one
Issued by
Building Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Roofers handle the permit in most localities when one is required. Comparing bids before you sign is the useful next step.

Compare roofing quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a roof replacement permit costs in Seminole County

Fee schedule in force
Official scheduleRead .

Re-roof Residential: $175.00 flat fee, per the Building Division's Seminole County Permit Fees schedule (Revised October 2026), whose fees are temporary under Resolution 2026-R-61.

The schedule also lists a $75.00 Administrative Fee that applies to all permits unless otherwise noted.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Seminole County compares in Florida

Across the Florida jurisdictions we have verified, the same threshold runs from 100 to 500, so a project that is exempt here may still need a permit one county over.

JurisdictionPermit needed?Threshold
Alachua CountyIt dependsarea of roof repair or replacement
Brevard CountyPermit requiredAny size
Charlotte CountyPermit requiredRoof repairs less than 100 square feet (one square) where the work does not include repairs to trusses or rafters do not require a permit.
Hernando CountyPermit requiredRoof repairs covering less than 100 square feet of existing roof are exempt from a building permit; this exemption does not extend to a full roof replacement
Marion CountyPermit requiredRoofing repair of 100 square feet or less does not require a permit
Seminole Countythis pagePermit requiredRoof repairs not exceeding 100 square feet do not require a permit; roof repairs exceeding 100 square feet do require one
TampaIt dependsArea of new roof covering, or of re-covering, re-roofing or repair of an existing roof covering

How to apply in Seminole County

General guide, not specific to this office

What a roof replacement permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a roof replacement permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Building Division

Permitting activity in Seminole County

In 2025, Seminole County authorized permits for 1,997 new residential housing units (893 single-family, 1,104 in multi-family buildings), valued at $547M, down from 2,280 the year before. That works out to about 4.1 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 491,884.

What else needs a permit in Seminole County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeIts Residential Accessory Structure lines are a $75.00 Admin Fee; the schedule has the rest
Electrical PermitPermit requiredAny sizeElectrical Permit, Residential: $165.00 per inspection; the schedule has the rest
Fence PermitPermit requiredAny sizeFence: $150.00 flat fee
HVAC PermitIt dependsA self-contained refrigeration system with 10 pounds or less of refrigerant, actuated by a motor of 1 horsepower or less, does not require a permit; portable heating, ventilation, and cooling equipment is also exemptMechanical/HVAC Change-out (Residential Only): $175.00 flat fee
Plumbing PermitPermit requiredAny sizePlumbing Permit, Residential: $165.00 per inspection
Pool PermitIt dependsPrefabricated above-ground swimming pools accessory to a one- or two-family home that are less than 24 inches deep and hold 5,000 gallons or less are exempt from permitResidential Pools: $860.00 flat fee, per the Building Division's Seminole County Permit Fees schedule (Revised October 2026); the schedule has the rest
Shed PermitPermit requiredAny sizeSheds, Pre-built: $200.00 flat fee
Solar PermitPermit requiredAny sizeThe schedule lists a $75.00 Administrative Fee that applies to all permits unless otherwise noted

Frequently asked questions

Do you need a roof replacement permit in Seminole County?
Yes, before replacing a roof in unincorporated Seminole County (minor roof repairs of 100 square feet or less are exempt). If you are unsure how that applies to your project, call the Building Division at 407-665-7050 before you start.
How much does a roof replacement permit cost in Seminole County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the Building Division at 407-665-7050.
Where do you apply for a roof replacement permit in Seminole County?
You can apply through the Seminole County permit portal or contact the Building Division directly. The links are listed on this page.
Can a homeowner pull a roof replacement permit themselves in Seminole County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Seminole County applies this before you apply.

From the Library

Roof Replacement Permit in other Florida localities

Everything above, sourced

How this roof replacement permit page for Seminole County was verified. 2 official sources: seminolecountyfl.gov, seminolecountyfl.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Building Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project