Wisconsin / Madison

Shed Permit in Madison, Wisconsin

It depends

Sometimes, depending on the project

Before building, replacing or moving in a shed or accessory building that is over 150 square feet, or that is heated, or that sits less than ten feet from dwelling units on the same property. Sheds built elsewhere and moved onto the lot, and prefabricated sheds, count.

Quick answer

Madison requires a permit for a shed or accessory building that is over 150 square feet, heated, or less than ten feet from dwelling units on the same property. A shed that is 150 square feet or less, unheated, and ten feet or more from dwelling units needs no permit, but it still has to meet the city's size and placement rules. The Development Services Center permit chart answers "Maybe. See shed page." for "Shed - build or replace" and sends the question to Zoning. Construction documents are required if the shed is over 150 square feet, heated, within 10 feet of another structure, or more than one story.

Diagram of the 150 sq ft footprint area threshold for a shed permit in Madison, Wisconsin
Threshold illustrated: 150 sq ft. Whether Madison requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-08-16.
Typical threshold
shed or accessory building floor area; heated sheds and sheds within ten feet of dwelling units on the property need a permit at any size
Issued by
City of Madison Building Inspection Division, Department of Planning and Community and Economic Development
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.

Compare contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a shed permit costs in Madison

Fee schedule in force
Official scheduleRead .

"Accessory buildings or detached garage serving a single or two family residential building: $.06 per sq. ft., Minimum fee $25.00" (MGO 29.09(3)(a), Group IV, Alterations And Special Fees; amended by ORD-25-00034, 6-13-25).

MGO 28.206 adds a zoning review fee of $0.03 per sq. ft., minimum $25.00, collected when the building permit is issued.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Madison

General guide, not specific to this office

What a shed permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a shed permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Madison Building Inspection Division, Department of Planning and Community and Economic Development

Shed Permit in Madison compared with nearby Wisconsin localities

LocalityPermit needed?ThresholdWhat each Wisconsin schedule saysVerified
MadisonIt dependsshed or accessory building floor area; heated sheds and sheds within ten feet of dwelling units on the property need a permit at any sizeSee schedule
MilwaukeeIt dependsdetached tool or storage sheds located in the rear yard and at least three feet from the property linesSee schedule

Permitting activity in Madison

In 2025, Madison authorized permits for 3,383 new residential housing units (250 single-family, 3,133 in multi-family buildings), valued at $610M, up from 2,812 the year before. That works out to about 12.9 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 263,094.

What else needs a permit in Madison

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeSee schedule
Electrical PermitIt dependsBefore starting any electrical installation, wiring, alteration or change other than...See schedule
Fence PermitNo permit neededExemptNo fence permit is issued, so there is no permit fee
HVAC PermitIt dependsBefore installing, altering, repairing or replacing a furnace, boiler, central air...See schedule
Patio PermitNo permit neededExemptNo patio permit is issued, so there is no permit fee
Plumbing PermitIt dependsBefore starting any plumbing work, other than minor repairs to part of an existing...See schedule
Pool PermitPermit requiredAny sizeSee schedule
Roof Replacement PermitPermit requiredAny sizeSee schedule
Solar PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a shed permit in Madison?
It depends on the project. Shed or accessory building floor area; heated sheds and sheds within ten feet of dwelling units on the property need a permit at any size. If you are unsure how that applies to your project, call the permit office at 608-266-4551 before you start.
How much does a shed permit cost in Madison?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Aug 2026. For the figure on your own project, call the permit office at 608-266-4551.
How long does a shed permit take in Madison?
For simple projects staff review the plans for structural and zoning compliance while you wait and the permit can be issued immediately; more complex projects take longer. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a shed permit in Madison?
You can apply through the Madison permit portal or contact the City of Madison Building Inspection Division, Department of Planning and Community and Economic Development directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Madison?
Under Wisconsin law (Wis. Stat. 101.654(1)(a) and (1)(b); Wis. Admin. Code SPS 305.31(1), SPS 320.09(9)(a)2., 3. and 4.; Wis. Stat. 101.65(1m) and (1r); Wis. Stat. 101.862(4)(a); Wis. Stat. 145.06(4)(a)): A Wisconsin homeowner may pull the permit and do the work on their own dwelling. The general rule is that nobody may obtain a building permit for a one- or two-family dwelling without a DSPS dwelling contractor certification plus a dwelling contractor qualifier credential, but the statute exempts an owner of a dwelling who resides or will reside in the dwelling and who applies for a building permit to perform work on that dwelling. Neither the statute nor the implementing rule places any cap on how often that exemption may be used, and Wisconsin has no counterpart to Florida's one-year resale restriction. The trade-off is a disclosure: the permit issuer must have the owner sign a statement warning that if the owner hires a contractor who is not bonded or insured, the owner may be held liable for injury or property damage arising from the work and may be unable to collect damages from that contractor. Trade licensing carries its own homeowner carve-outs, both defeasible by local ordinance: a residential property owner may do electrical wiring on premises the owner owns and occupies as a residence, and a property owner may do plumbing work in a one-family building owned and occupied as the owner's home. Confirm how Madison applies this before you apply.

From the Library

Shed Permit in other Wisconsin localities

Everything above, sourced

How this shed permit page for Madison was verified. 2 official sources: cityofmadison.com, cityofmadison.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Madison Building Inspection Division, Department of Planning and Community and Economic Development. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project