Wisconsin / Madison

HVAC Permit in Madison, Wisconsin

It depends

Sometimes, depending on the project

Before installing, altering, repairing or replacing a furnace, boiler, central air conditioner, ductless split system, exhaust system or ventilating system. In a genuine emergency the contractor may start work and file the application within 24 hours, Sundays and city holidays excepted.

Quick answer

Madison requires an HVAC permit for essentially all heating, ventilating and air conditioning work, with one narrow published exemption: no heating permit is needed to install electric baseboard or bathroom heaters used as auxiliary heat to supplement an existing system already sized for the space. The Development Services Center chart lists both "Central Air Conditioner - install" and "Furnace - install" as Yes. The permit application must be submitted by someone holding a valid HVAC certification under Wis. Stat. 101.178(3)(a), except that an owner may do HVAC work in a single-family residence they themselves occupy. A plot plan showing the location of the condensing unit is required with an air conditioning application, and the condenser may not sit in a required front or side yard.

Issued by
City of Madison Building Inspection Division, Department of Planning and Community and Economic Development
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

HVAC contractors usually pull this permit as part of the job. If you have not picked one yet, compare a few quotes before you commit.

Compare HVAC contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an HVAC permit costs in Madison

Fee schedule in force
Official scheduleRead .
  • MGO 30.01(5)(a), Group IV, Alterations and Special Fees (amended by ORD-21-00016, 3-8-21): "Replacement Heating Equipment: Up to 100,000 BTU $25; 100,001 to 165,000 BTU $50; 165,001 and greater BTU $75";
  • "Air Conditioning Unit $25 ... The fee applies to any new or replacement air conditioning unit. This fee does not apply to temporary window units";
  • "Ductless Split System or Wall Pack Unit $25".
  • New residential HVAC is $.09 per sq. ft. with a $25 minimum, and alterations and repairs to existing structures are $11 for each $1,000 of value.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Madison

General guide, not specific to this office

What an HVAC permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an HVAC permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Madison Building Inspection Division, Department of Planning and Community and Economic Development

HVAC Permit in Madison compared with nearby Wisconsin localities

LocalityPermit needed?ThresholdWhat each Wisconsin schedule saysVerified
MadisonIt dependsBefore installing, altering, repairing or replacing a furnace, boiler, central air...See schedule
MilwaukeeIt dependsBefore installing or replacing a furnace, a central air conditioning or refrigeration...See schedule

Permitting activity in Madison

In 2025, Madison authorized permits for 3,383 new residential housing units (250 single-family, 3,133 in multi-family buildings), valued at $610M, up from 2,812 the year before. That works out to about 12.9 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 263,094.

What else needs a permit in Madison

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeSee schedule
Electrical PermitIt dependsBefore starting any electrical installation, wiring, alteration or change other than...See schedule
Fence PermitNo permit neededExemptNo fence permit is issued, so there is no permit fee
Patio PermitNo permit neededExemptNo patio permit is issued, so there is no permit fee
Plumbing PermitIt dependsBefore starting any plumbing work, other than minor repairs to part of an existing...See schedule
Pool PermitPermit requiredAny sizeSee schedule
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitIt dependsshed or accessory building floor area; heated sheds and sheds within ten feet of dwelling units on the property need a permit at any sizeSee schedule
Solar PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need an HVAC permit in Madison?
Sometimes: before installing, altering, repairing or replacing a furnace, boiler, central air conditioner, ductless split system, exhaust system or ventilating system. In a genuine emergency the contractor may start work and file the application within 24 hours, Sundays and city holidays excepted. If you are unsure how that applies to your project, call the permit office at 608-266-4551 before you start.
How much does an HVAC permit cost in Madison?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Aug 2026. For the figure on your own project, call the permit office at 608-266-4551.
Where do you apply for an HVAC permit in Madison?
You can apply through the Madison permit portal or contact the City of Madison Building Inspection Division, Department of Planning and Community and Economic Development directly. The links are listed on this page.
Can a homeowner pull an HVAC permit themselves in Madison?
Under Wisconsin law (Wis. Stat. 101.654(1)(a) and (1)(b); Wis. Admin. Code SPS 305.31(1), SPS 320.09(9)(a)2., 3. and 4.; Wis. Stat. 101.65(1m) and (1r); Wis. Stat. 101.862(4)(a); Wis. Stat. 145.06(4)(a)): A Wisconsin homeowner may pull the permit and do the work on their own dwelling. The general rule is that nobody may obtain a building permit for a one- or two-family dwelling without a DSPS dwelling contractor certification plus a dwelling contractor qualifier credential, but the statute exempts an owner of a dwelling who resides or will reside in the dwelling and who applies for a building permit to perform work on that dwelling. Neither the statute nor the implementing rule places any cap on how often that exemption may be used, and Wisconsin has no counterpart to Florida's one-year resale restriction. The trade-off is a disclosure: the permit issuer must have the owner sign a statement warning that if the owner hires a contractor who is not bonded or insured, the owner may be held liable for injury or property damage arising from the work and may be unable to collect damages from that contractor. Trade licensing carries its own homeowner carve-outs, both defeasible by local ordinance: a residential property owner may do electrical wiring on premises the owner owns and occupies as a residence, and a property owner may do plumbing work in a one-family building owned and occupied as the owner's home. Confirm how Madison applies this before you apply.

From the Library

HVAC Permit in other Wisconsin localities

Everything above, sourced

How this HVAC permit page for Madison was verified. 2 official sources: cityofmadison.com, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Madison Building Inspection Division, Department of Planning and Community and Economic Development. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page