Solar Permit in Madison, Wisconsin
Permit required
Yes, a permit is required
Before installing a solar energy system. A building permit plus an electrical permit is the normal package; solar domestic hot water also pulls a plumbing permit and a heating permit.
Quick answer
Madison requires permits to install a solar energy system: the Development Services Center chart lists "Solar Energy System - install" as Yes with Building Inspection at 608-266-4551 ext. 2, and the fee schedule carries a dedicated $21.00 solar panel or collector system permit. The city's How to Go Solar guide walks through the building permit documents (structural drawings and calculations, a section of the existing roof showing the attachment, a catalog cut sheet with the panel weight, and a site and placement plan) and the trade permit documents (a UL-listed cut sheet for the PV device, and for solar hot water proof of a non-toxic transfer fluid or a double-walled heat exchanger). Calculations may be done by a knowledgeable person for residential buildings and commercial buildings up to 50,000 cubic feet; larger buildings need a licensed professional engineer or architect.
- Issued by
- City of Madison Building Inspection Division, Department of Planning and Community and Economic Development
- Phone
- 608-266-4551
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your Wisconsin Department of Safety and Professional Services (DSPS) license active, and under which business name? Verify it on license.wi.gov.
Wisconsin's owner-builder rule (Wis. Stat. 101.654(1)(a) and (1)(b); Wis. Admin. Code SPS 305.31(1), SPS 320.09(9)(a)2., 3. and 4.; Wis. Stat. 101.65(1m) and (1r); Wis. Stat. 101.862(4)(a); Wis. Stat. 145.06(4)(a)) sets what you may do on your own home without hiring anyone. Read the statute.
What a solar permit costs in Madison
- Fee schedule in force
- Official scheduleRead .
"Solar panels or collector system: $21.00 each permit" (MGO 29.09(3)(a), Group IV; amended by ORD-25-00034, 6-13-25).
The electrical permit is billed separately at $25.00 for the first ten openings and $1.00 each additional opening (MGO 19.11, Group IV).
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Madison
General guide, not specific to this office
What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Madison Building Inspection Division, Department of Planning and Community and Economic Development
- 215 Martin Luther King Jr. Blvd., Suite 017, Madison, WI 53703
- Phone: 608-266-4551
- Email: binspection@cityofmadison.com
Solar Permit in Madison compared with nearby Wisconsin localities
| Locality | Permit needed? | Threshold | What each Wisconsin schedule says | Verified |
|---|---|---|---|---|
| Madison | Permit required | Any size | See schedule | |
| Milwaukee | Permit required | Any size | See schedule |
Your Solar Permit checklist for Madison
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: cityofmadison.com: building inspection.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Madison permit portal.
- Keep the office details handy. City of Madison Building Inspection Division, Department of Planning and Community and Economic Development. Phone: 608-266-4551. Email: binspection@cityofmadison.com. Address: 215 Martin Luther King Jr. Blvd., Suite 017, Madison, WI 53703.
Compiled from the official sources on this page. Last checked .
Permitting activity in Madison
In 2025, Madison authorized permits for 3,383 new residential housing units (250 single-family, 3,133 in multi-family buildings), valued at $610M, up from 2,812 the year before. That works out to about 12.9 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 263,094.
What else needs a permit in Madison
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Any size | See schedule |
| Electrical Permit | It depends | Before starting any electrical installation, wiring, alteration or change other than... | See schedule |
| Fence Permit | No permit needed | Exempt | No fence permit is issued, so there is no permit fee |
| HVAC Permit | It depends | Before installing, altering, repairing or replacing a furnace, boiler, central air... | See schedule |
| Patio Permit | No permit needed | Exempt | No patio permit is issued, so there is no permit fee |
| Plumbing Permit | It depends | Before starting any plumbing work, other than minor repairs to part of an existing... | See schedule |
| Pool Permit | Permit required | Any size | See schedule |
| Roof Replacement Permit | Permit required | Any size | See schedule |
| Shed Permit | It depends | shed or accessory building floor area; heated sheds and sheds within ten feet of dwelling units on the property need a permit at any size | See schedule |
Frequently asked questions
- Do you need a solar permit in Madison?
- Yes, before installing a solar energy system. A building permit plus an electrical permit is the normal package; solar domestic hot water also pulls a plumbing permit and a heating permit. If you are unsure how that applies to your project, call the permit office at 608-266-4551 before you start.
- How much does a solar permit cost in Madison?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Aug 2026. For the figure on your own project, call the permit office at 608-266-4551.
- How long does a solar permit take in Madison?
- If all documents are complete and acceptable the permit is issued at the counter right away. A Planned Development alteration adds about two weeks plus the time needed to get the alder's signature. Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for a solar permit in Madison?
- You can apply through the Madison permit portal or contact the City of Madison Building Inspection Division, Department of Planning and Community and Economic Development directly. The links are listed on this page.
- Can a homeowner pull a solar permit themselves in Madison?
- Under Wisconsin law (Wis. Stat. 101.654(1)(a) and (1)(b); Wis. Admin. Code SPS 305.31(1), SPS 320.09(9)(a)2., 3. and 4.; Wis. Stat. 101.65(1m) and (1r); Wis. Stat. 101.862(4)(a); Wis. Stat. 145.06(4)(a)): A Wisconsin homeowner may pull the permit and do the work on their own dwelling. The general rule is that nobody may obtain a building permit for a one- or two-family dwelling without a DSPS dwelling contractor certification plus a dwelling contractor qualifier credential, but the statute exempts an owner of a dwelling who resides or will reside in the dwelling and who applies for a building permit to perform work on that dwelling. Neither the statute nor the implementing rule places any cap on how often that exemption may be used, and Wisconsin has no counterpart to Florida's one-year resale restriction. The trade-off is a disclosure: the permit issuer must have the owner sign a statement warning that if the owner hires a contractor who is not bonded or insured, the owner may be held liable for injury or property damage arising from the work and may be unable to collect damages from that contractor. Trade licensing carries its own homeowner carve-outs, both defeasible by local ordinance: a residential property owner may do electrical wiring on premises the owner owns and occupies as a residence, and a property owner may do plumbing work in a one-family building owned and occupied as the owner's home. Confirm how Madison applies this before you apply.
From the Library
Solar Permit in other Wisconsin localities
Everything above, sourced
How this solar permit page for Madison was verified. 2 official sources: cityofmadison.com, cityofmadison.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Madison Building Inspection Division, Department of Planning and Community and Economic Development. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page