Solar Permit in Milwaukee, Wisconsin
Permit required
Yes, a permit is required
Before starting any solar installation; the permit must be approved and issued first, and a separate building permit is required if the roof structure has to be altered to carry the array
Quick answer
Every solar project in Milwaukee needs a solar permit, called an ESPV, and it must be approved and issued before installation begins; the Does It Need a Permit page gives the same one-word answer for Solar. The permit is an electrical permit in substance and is priced off system size in kilowatts, and for a house or duplex that needs no structural work there is no separate plan review or building permit fee on top. Residential projects can take an expedited route if the system is under 10 kilowatts, the panels are flush-mounted on the roof, and the total load is under 5 pounds per square foot. An installer with proper credentials compiles the submittal, files through LMS with a line diagram and spec sheets, a plan examiner reviews, fees are paid, and the permit issues. If the roof structure has to be altered to support the array, a building permit is required in addition.
- Issued by
- City of Milwaukee Department of Neighborhood Services (DNS), Permit and Development Center
- Phone
- 414-286-8210
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your Wisconsin Department of Safety and Professional Services (DSPS) license active, and under which business name? Verify it on license.wi.gov.
Wisconsin's owner-builder rule (Wis. Stat. 101.654(1)(a) and (1)(b); Wis. Admin. Code SPS 305.31(1), SPS 320.09(9)(a)2., 3. and 4.; Wis. Stat. 101.65(1m) and (1r); Wis. Stat. 101.862(4)(a); Wis. Stat. 145.06(4)(a)) sets what you may do on your own home without hiring anyone. Read the statute.
What a solar permit costs in Milwaukee
- Fee schedule in force
- Official scheduleRead .
The Residential Solar Permit Process sheet (DNS soc 06/02/2021) states "Expedited solar permits cost $70 (with a $10 processing fee)" and lists Electrical Permit Fees for Solar PV of $70 for 0-20 kilowatts, $100 for 20.1-35 kW, $150 for 35.1-50 kW, $200 for 50.1-75 kW, $250 for 75.1-100 kW and $300 over 100 kW, plus a feeder fee of $40 up to 400 amps or $100 for 401-600 amps, each with a 1.6% IT fee and a $10.00 permit processing fee.
It also says "There is no Plan Review fee or Building Permit fee for the installation of a solar PV system on 1 or 2-family dwellings not required to undergo structural reinforcement or alterations."
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Milwaukee
General guide, not specific to this office
What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Milwaukee Department of Neighborhood Services (DNS), Permit and Development Center
- Permit and Development Center, 809 N. Broadway, 1st Floor, Milwaukee, WI 53202
- Phone: 414-286-8210
- Email: DevelopmentCenterInfo@milwaukee.gov
Solar Permit in Milwaukee compared with nearby Wisconsin localities
| Locality | Permit needed? | Threshold | What each Wisconsin schedule says | Verified |
|---|---|---|---|---|
| Milwaukee | Permit required | Any size | See schedule | |
| Madison | Permit required | Any size | See schedule |
Your Solar Permit checklist for Milwaukee
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: city.milwaukee.gov: permits.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Milwaukee permit portal.
- Keep the office details handy. City of Milwaukee Department of Neighborhood Services (DNS), Permit and Development Center. Phone: 414-286-8210. Email: DevelopmentCenterInfo@milwaukee.gov. Address: Permit and Development Center, 809 N. Broadway, 1st Floor, Milwaukee, WI 53202.
Compiled from the official sources on this page. Last checked .
Permitting activity in Milwaukee
In 2025, Milwaukee authorized permits for 71 new residential housing units (63 single-family, 8 in multi-family buildings), valued at $25M, down from 236 the year before. That works out to about 0.1 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 589,067.
What else needs a permit in Milwaukee
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | Before building a new deck or porch or rebuilding an existing one | See schedule |
| Electrical Permit | It depends | Before any electrical work beyond swapping a switch, dimmer or light fixture, or... | See schedule |
| Fence Permit | Permit required | Any size | See schedule |
| HVAC Permit | It depends | Before installing or replacing a furnace, a central air conditioning or refrigeration... | See schedule |
| Patio Permit | No permit needed | Exempt | No permit and therefore no DNS permit fee |
| Plumbing Permit | It depends | Before any plumbing work other than swapping a fixture without touching the water... | For non-dwelling work, plumbing plan examination is priced by fixture count starting at $350 for 11 to 15 fixtures; the schedule has the rest |
| Pool Permit | It depends | pool at least 15 feet by 3 feet in size or holding 3,965 gallons | See schedule |
| Roof Replacement Permit | It depends | No permit for stripping and replacing shingles or roof covering on a house or duplex | No permit fee for a one- or two-family re-roof, because no permit is required |
| Shed Permit | It depends | detached tool or storage sheds located in the rear yard and at least three feet from the property lines | See schedule |
Frequently asked questions
- Do you need a solar permit in Milwaukee?
- Yes, before starting any solar installation; the permit must be approved and issued first, and a separate building permit is required if the roof structure has to be altered to carry the array. If you are unsure how that applies to your project, call the permit office at 414-286-8210 before you start.
- How much does a solar permit cost in Milwaukee?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Aug 2026. For the figure on your own project, call the permit office at 414-286-8210.
- Where do you apply for a solar permit in Milwaukee?
- You can apply through the Milwaukee permit portal or contact the City of Milwaukee Department of Neighborhood Services (DNS), Permit and Development Center directly. The links are listed on this page.
- Can a homeowner pull a solar permit themselves in Milwaukee?
- Under Wisconsin law (Wis. Stat. 101.654(1)(a) and (1)(b); Wis. Admin. Code SPS 305.31(1), SPS 320.09(9)(a)2., 3. and 4.; Wis. Stat. 101.65(1m) and (1r); Wis. Stat. 101.862(4)(a); Wis. Stat. 145.06(4)(a)): A Wisconsin homeowner may pull the permit and do the work on their own dwelling. The general rule is that nobody may obtain a building permit for a one- or two-family dwelling without a DSPS dwelling contractor certification plus a dwelling contractor qualifier credential, but the statute exempts an owner of a dwelling who resides or will reside in the dwelling and who applies for a building permit to perform work on that dwelling. Neither the statute nor the implementing rule places any cap on how often that exemption may be used, and Wisconsin has no counterpart to Florida's one-year resale restriction. The trade-off is a disclosure: the permit issuer must have the owner sign a statement warning that if the owner hires a contractor who is not bonded or insured, the owner may be held liable for injury or property damage arising from the work and may be unable to collect damages from that contractor. Trade licensing carries its own homeowner carve-outs, both defeasible by local ordinance: a residential property owner may do electrical wiring on premises the owner owns and occupies as a residence, and a property owner may do plumbing work in a one-family building owned and occupied as the owner's home. Confirm how Milwaukee applies this before you apply.
From the Library
Solar Permit in other Wisconsin localities
Everything above, sourced
How this solar permit page for Milwaukee was verified. 2 official sources: city.milwaukee.gov, city.milwaukee.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Milwaukee Department of Neighborhood Services (DNS), Permit and Development Center. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page