Permit records

Milwaukee permit search

Milwaukee permit records are public. The city publishes them through Land Management System, and searching does not require an account.

Project types verified
10
in Milwaukee
Search verified
8 Sep 2026
we opened it ourselves

How to search

  1. Open the Milwaukee permit record search.
  2. Enter an address, or switch the search type to look up permits by record number, parcel number, or contact name.
  3. Open a result to see the permit's status, inspection history, and issue date.

If the permit does not turn up

Older permits are often missing from online records, and a permit filed under a contractor's name will not surface in an address search that expects the owner. City of Milwaukee Department of Neighborhood Services (DNS), Permit and Development Center can check the paper file.

What needs a permit in Milwaukee

Every project type we have verified in Milwaukee, with the rule, the threshold, and the fee that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsBefore building a new deck or porch or rebuilding an existing oneSee schedule
Electrical PermitIt dependsBefore any electrical work beyond swapping a switch, dimmer or light fixture, or...See schedule
Fence PermitPermit requiredAny sizeSee schedule
HVAC PermitIt dependsBefore installing or replacing a furnace, a central air conditioning or refrigeration...See schedule
Patio PermitNo permit neededExemptNo permit and therefore no DNS permit fee
Plumbing PermitIt dependsBefore any plumbing work other than swapping a fixture without touching the water...For non-dwelling work, plumbing plan examination is priced by fixture count starting at $350 for 11 to 15 fixtures; the schedule has the rest
Pool PermitIt dependspool at least 15 feet by 3 feet in size or holding 3,965 gallonsSee schedule
Roof Replacement PermitIt dependsNo permit for stripping and replacing shingles or roof covering on a house or duplexNo permit fee for a one- or two-family re-roof, because no permit is required
Shed PermitIt dependsdetached tool or storage sheds located in the rear yard and at least three feet from the property linesSee schedule
Solar PermitPermit requiredAny sizeSee schedule

Everything we have verified about permits in Milwaukee