Wisconsin / Madison

Plumbing Permit in Madison, Wisconsin

It depends

Sometimes, depending on the project

Before starting any plumbing work, other than minor repairs to part of an existing plumbing system. Water heater and water softener installations are explicitly listed as Yes on the city's permit chart.

Confirmed on official page Verified City of Madison Building Inspection Division, Department of Planning and Community and Economic Development

By Mario Bailey, verified against official sources

Quick answer

Madison requires a plumbing permit application to be filed before any plumbing work starts, with a stated exception: "A permit application is not required when minor repairs are made to part of an existing plumbing system." The Development Services Center chart lists "Plumbing - All" as Yes, along with "Water Heater - install" and "Water Softener - install". Applications must be signed by a person qualified as a licensed plumber registered with the Wisconsin Department of Safety and Professional Services, and the application with the correct inspection fee must be filed no later than three working days after work begins. Plumbers can apply online for a repair-or-replace plumbing permit covering interior alterations in one and two family homes, direct fixture replacements, and water heaters and softeners.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before starting any plumbing work, other than minor repairs to part of an existing plumbing system. Water heater and water softener installations are explicitly listed as Yes on the city's permit chart.

What a plumbing permit costs in Madison

Line item
plumbing permitBy formulaMGO 18.09, Group IV, Alterations And Special Fees (repealed and recreated by ORD-21-00025, 3-26-21; amended by ORD-21-00041, 6-14-21): "$8.00 per fixture Minimum Fee $25.00", where water heater and water softener replacements, capped openings left for future fixtures, and each altered or repaired building sewer, building drain, soil, waste or vent pipe inside an existing building each count as one fixture. New residential plumbing is $.09 per sq. ft. with a $25.00 minimum. Plumbing plan examination fees follow the state schedule in SPS 302.64, Table 302.64-1.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Madison

You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.

What most plumbing permit applications include:

  • A permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
  • The application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
  • Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
  • Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
  • Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).

General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. City of Madison Building Inspection Division, Department of Planning and Community and Economic Development sets the exact checklist for Madison.

Where to apply in Madison:

City of Madison Building Inspection Division, Department of Planning and Community and Economic Development

Inspections and closing out your permit

Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.

  1. Piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
  2. Rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
  3. Rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
  4. The water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
  5. The framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
  6. At the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
  7. Final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Madison permit portal or by phone at 608-266-4551.

Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a plumbing permit in Madison?
Madison requires a plumbing permit application to be filed before any plumbing work starts, with a stated exception: "A permit application is not required when minor repairs are made to part of an existing plumbing system." The Development Services Center chart lists "Plumbing - All" as Yes, along with "Water Heater - install" and "Water Softener - install". Applications must be signed by a person qualified as a licensed plumber registered with the Wisconsin Department of Safety and Professional Services, and the application with the correct inspection fee must be filed no later than three working days after work begins. Plumbers can apply online for a repair-or-replace plumbing permit covering interior alterations in one and two family homes, direct fixture replacements, and water heaters and softeners. Always confirm with the City of Madison Building Inspection Division, Department of Planning and Community and Economic Development before starting.
How much does a plumbing permit cost in Madison?
MGO 18.09, Group IV, Alterations And Special Fees (repealed and recreated by ORD-21-00025, 3-26-21; amended by ORD-21-00041, 6-14-21): "$8.00 per fixture Minimum Fee $25.00", where water heater and water softener replacements, capped openings left for future fixtures, and each altered or repaired building sewer, building drain, soil, waste or vent pipe inside an existing building each count as one fixture. New residential plumbing is $.09 per sq. ft. with a $25.00 minimum. Plumbing plan examination fees follow the state schedule in SPS 302.64, Table 302.64-1. See the official fee schedule for current amounts.
Where do you apply for a plumbing permit in Madison?
You can apply through the Madison permit portal or contact the City of Madison Building Inspection Division, Department of Planning and Community and Economic Development directly. The links are listed on this page.
Can a homeowner pull a plumbing permit themselves in Madison?
Under Wisconsin law (Wis. Stat. 101.654(1)(a) and (1)(b); Wis. Admin. Code SPS 305.31(1), SPS 320.09(9)(a)2., 3. and 4.; Wis. Stat. 101.65(1m) and (1r); Wis. Stat. 101.862(4)(a); Wis. Stat. 145.06(4)(a)): A Wisconsin homeowner may pull the permit and do the work on their own dwelling. The general rule is that nobody may obtain a building permit for a one- or two-family dwelling without a DSPS dwelling contractor certification plus a dwelling contractor qualifier credential, but the statute exempts an owner of a dwelling who resides or will reside in the dwelling and who applies for a building permit to perform work on that dwelling. Neither the statute nor the implementing rule places any cap on how often that exemption may be used, and Wisconsin has no counterpart to Florida's one-year resale restriction. The trade-off is a disclosure: the permit issuer must have the owner sign a statement warning that if the owner hires a contractor who is not bonded or insured, the owner may be held liable for injury or property damage arising from the work and may be unable to collect damages from that contractor. Trade licensing carries its own homeowner carve-outs, both defeasible by local ordinance: a residential property owner may do electrical wiring on premises the owner owns and occupies as a residence, and a property owner may do plumbing work in a one-family building owned and occupied as the owner's home. Confirm how Madison applies this before you apply.

From the Library

What else needs a permit in Madison

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedThe deck page states: "The permit fee for most decks under 250 square feet is $75." The...
Electrical PermitIt dependsNot specifiedMGO 19.11, Group IV, Alterations And Special Fees (repealed and recreated by...
Fence PermitNo permit neededNot specifiedNo fence permit is issued, so there is no permit fee.
HVAC PermitIt dependsNot specifiedMGO 30.01(5)(a), Group IV, Alterations and Special Fees (amended by ORD-21-00016...
Patio PermitNo permit neededNot specifiedNo patio permit is issued, so there is no permit fee.
Pool PermitPermit requiredNot specified"Private in-the-ground swimming pools: $25.00 each permit" (MGO 29.09(3)(a), Group IV...
Roof Replacement PermitPermit requiredNot specified"Alterations and repairs to existing structures: $11.00 for each $1,000 value or...
Shed PermitIt dependsshed or accessory building floor area; heated sheds and sheds within ten feet of dwelling units on the property need a permit at any size"Accessory buildings or detached garage serving a single or two family residential...
Solar PermitPermit requiredNot specified"Solar panels or collector system: $21.00 each permit" (MGO 29.09(3)(a), Group IV

Plumbing Permit in other Wisconsin localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Madison documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with City of Madison Building Inspection Division, Department of Planning and Community and Economic Development. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Plumbing Permit requirements across Wisconsin localities

Look up an existing Madison permit record

It depends
Get quotes