Florida / Tampa

Water Heater Permit in Tampa, Florida

Permit required

Yes, a permit is required

Before replacing, relocating or converting a water heater.

Quick answer

Every water heater replacement in the City of Tampa needs a permit. A replacement in the same location with no fuel conversion goes on a plumbing trade permit without plan review and can be inspected virtually; relocating the heater or converting it, for example from gas to electric, goes beyond the trade-permit limits and needs a Building (BLD) permit with plan review. The City's post-hurricane guide lists a hot water heater change-out as a plumbing trade permit plus an electrical trade permit.

Issued by
City of Tampa Development & Growth Management Department, Construction Services Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Plumbers usually pull this permit as part of the replacement. If yours failed and you are choosing a plumber under time pressure, comparing a couple of quotes still pays.

Compare plumber quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a water heater permit costs in Tampa

Fee schedule in force
Official scheduleRead .
  • "Plumbing (general) for all plumbing-related activities not addressed below or any other fee table" $120.00, City of Tampa Trade Permit Fee Schedule ("Effective October 1, 2018", "Updated 2/16/2023"), residential (one and two family dwellings) column;
  • the post-hurricane guide pairs a plumbing trade permit with an electrical trade permit for a water heater change-out, so expect a separate electrical trade fee where wiring is involved.
  • Every permit also carries the Florida Building Permit Surcharge of 2.5% of permit value or $4.00 minimum, not included in the listed fees.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Tampa compares in Florida

No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Martin CountyPermit requiredFee schedule effective July 1, 2026: construction costs under $25,000 pay a $75 building fee, a $25 plan review fee and $75 per inspection
MiamiPermit required"Residential less than estimated $2,500.00": $45.00
Tampathis pagePermit required"Plumbing (general) for all plumbing-related activities not addressed below or any other fee table" $120.00; the schedule has the rest

How to apply in Tampa

General guide, not specific to this office

What a water heater permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a water heater permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Tampa Development & Growth Management Department, Construction Services Division

  • City Center at Hanna, 2555 E. Hanna Ave., Tampa, FL 33610
  • Phone: (813) 274-3100
  • Email: CSDHelp@tampagov.net

What else needs a permit in Tampa

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsScope of work: finish-only work is exempt; fixture, plumbing, electrical or wall work is notFixture-only work: "Plumbing (general)" $120.00; the schedule has the rest
Deck PermitPermit requiredAny sizeSee schedule
Electrical PermitPermit requiredAny sizeSee schedule
EV Charger PermitPermit requiredAny size"Electrical (general) for all electrical-related activities not addressed below or any other fee table" $120.00; the schedule has the rest
Fence PermitIt dependsHeight of the fence; masonry walls are handled as a separate wall permit typeSee schedule
HVAC PermitPermit requiredAny sizeSee schedule
Plumbing PermitPermit requiredAny size"Plumbing (general) for all plumbing-related activities not addressed below or any other fee table" $120.00
Pool PermitIt dependsPrefabricated pools installed entirely above ground, accessory to a Group R-3 occupancy, holding no more than 5,000 gallons"In-Ground Pool/Spa" $716.00 and "Above-Ground Pool/Spa" $292.00; the schedule has the rest
Roof Replacement PermitIt dependsArea of new roof covering, or of re-covering, re-roofing or repair of an existing roof covering"Roofing" $177.00, City of Tampa Trade Permit Fee Schedule ("Effective October 1, 2018", "Updated 2/16/2023"), residential (one and two family dwellings) column
Shed PermitIt dependsFloor area of a one-story detached accessory structure used as a tool or storage shed, playhouse or similar use"Accessory Structure (gazebo, deck, pergola, shed)" $177.00; the schedule has the rest
Solar PermitPermit requiredAny size"Photovoltaic cells" $120.00 (ELECTRICAL), City of Tampa Trade Permit Fee Schedule ("Effective October 1, 2018", "Updated 2/16/2023"); the schedule has the rest

Frequently asked questions

Do you need a water heater permit in Tampa?
Yes, before replacing, relocating or converting a water heater. If you are unsure how that applies to your project, call the City of Tampa Development & Growth Management Department, Construction Services Division at (813) 274-3100 before you start.
How much does a water heater permit cost in Tampa?
The fee wording from the official schedule is in the cost table on this page, as we read it on 30 Oct 2026. For the figure on your own project, call the City of Tampa Development & Growth Management Department, Construction Services Division at (813) 274-3100.
Where do you apply for a water heater permit in Tampa?
You can apply through the Tampa permit portal or contact the City of Tampa Development & Growth Management Department, Construction Services Division directly. The links are listed on this page.
Can a homeowner pull a water heater permit themselves in Tampa?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Tampa applies this before you apply.

From the Library

Water Heater Permit in other Florida localities

Everything above, sourced

How this water heater permit page for Tampa was verified. 2 official sources: tampa.gov, tampa.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Tampa Development & Growth Management Department, Construction Services Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project