Shed Permit in St. Lucie County, Florida
Permit required
Yes, a permit is required
Before installing a storage shed or other accessory structure in unincorporated St. Lucie County
By Mario Bailey, verified against official sources
Quick answer
St. Lucie County's published list of items that do not require a permit does not include any size-based exemption for storage sheds or accessory structures, unlike some other Florida counties that exempt small sheds. Under the Florida Building Code as adopted by the county, a permit applies to the construction of every structure, so sheds of any size are treated as requiring a building permit in unincorporated St. Lucie County. This applies to unincorporated areas only; Port St. Lucie and Fort Pierce issue their own shed permits.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
When a permit is usually needed
Before installing a storage shed or other accessory structure in unincorporated St. Lucie County
What your shed permit must meet in Florida
Florida sheds are built under the Florida Building Code, Residential, 8th Edition (2023), which requires structures to be designed for the state's wind loads, but Florida Statutes carve out two specific size-based reductions in what a shed must resist or include.
- As a structure, a shed is generally subject to the Florida Building Code's baseline wind-design requirement that applies to buildings and structures statewide (FBC Section 1609.1).
- Storage sheds not designed for human habitation with a floor area of 720 square feet or less are exempt from the code's mandatory windborne-debris-impact (opening protection) standard (F.S. 553.73(10)).
- Buildings of 400 square feet or less used in conjunction with a one- or two-family residence, which covers most sheds, are exempt from the code's door height and width requirements (F.S. 553.73(10)).
Based on Florida Statutes 553.73(10); Florida Building Code, 8th Edition (2023), Section 1609.1. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.
What a shed permit costs in St. Lucie County
How St. Lucie County compares in Florida
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Alachua County | It depends | area of a single storage shed, exemption available once per property |
| Brevard County | It depends | A permit is required for an accessory structure (shed) over 100 square feet. |
| Broward County | Permit required | Not specified |
| Charlotte County | It depends | A building permit is not required for plastic or rubber manufactured type sheds 68 square feet or less in area, though they must comply with zoning setbacks and be moved and secured if there is the threat of a tropical storm. |
| Clay County | Permit required | Not specified |
| Hernando County | It depends | Sheds with impervious roof coverings of 120 square feet or less do not require a Zoning permit, provided other county regulations (setbacks, floodplain rules, one detached accessory building per parcel, etc.) are met |
| St. Lucie Countythis page | Permit required | Not specified |
How to apply in St. Lucie County
A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.
What most shed permit applications include:
- A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
- A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
- Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
- Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
- Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).
General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. St. Lucie County Building & Permitting Division (Planning and Development Services) sets the exact checklist for St. Lucie County.
Where to apply in St. Lucie County:
St. Lucie County Building & Permitting Division (Planning and Development Services)
- 2300 Virginia Avenue, Fort Pierce, FL 34982
- Phone: (772) 462-1553
Inspections and closing out your permit
A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
- Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
- Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
- Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
- For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the St. Lucie County permit portal or by phone at (772) 462-1553.
Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Shed Permit checklist for St. Lucie County
- Confirm the requirement. Yes, a permit is required. Usually needed: Before installing a storage shed or other accessory structure in unincorporated St. Lucie County.
- Apply. A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing. Start at the St. Lucie County permit portal.
- Keep the office details handy. St. Lucie County Building & Permitting Division (Planning and Development Services). Phone: (772) 462-1553. Address: 2300 Virginia Avenue, Fort Pierce, FL 34982.
- Plan for inspections. A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a shed permit in St. Lucie County?
- St. Lucie County's published list of items that do not require a permit does not include any size-based exemption for storage sheds or accessory structures, unlike some other Florida counties that exempt small sheds. Under the Florida Building Code as adopted by the county, a permit applies to the construction of every structure, so sheds of any size are treated as requiring a building permit in unincorporated St. Lucie County. This applies to unincorporated areas only; Port St. Lucie and Fort Pierce issue their own shed permits. Always confirm with the St. Lucie County Building & Permitting Division (Planning and Development Services) before starting.
- How much does a shed permit cost in St. Lucie County?
- Fees are set by St. Lucie County and are not published here. Contact the office for current amounts.
- How long does a shed permit take in St. Lucie County?
- Minor permits are usually approved within 24 to 48 hours; standard building permits are targeted for issuance within 14 workdays when all required documents are provided. Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for a shed permit in St. Lucie County?
- You can apply through the St. Lucie County permit portal or contact the St. Lucie County Building & Permitting Division (Planning and Development Services) directly. The links are listed on this page.
- Can a homeowner pull a shed permit themselves in St. Lucie County?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how St. Lucie County applies this before you apply.
From the Library
What else needs a permit in St. Lucie County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold |
|---|---|---|
| Deck Permit | Permit required | Minor replacement of existing decking (walking surface only) under $1,000 in value, for 1 and 2 family dwellings, does not require a permit; new deck construction, structural work, or higher-value decking replacement requires a permit. |
| Electrical Permit | Permit required | Not specified |
| Fence Permit | Permit required | Minor repair or exact replacement of an existing permitted fence of up to 2 panels, excluding pool barriers, does not require a permit; installing a new fence, larger repairs, or any pool barrier fence requires a permit. |
| HVAC Permit | Permit required | Not specified |
| Patio Permit | It depends | Sand-set pavers that are not a pool or spa deck and are not within five feet of a pool do not require a permit, for 1 and 2 family dwellings; pavers used as a pool deck, pavers within five feet of a pool, or other patio construction requires a permit. |
| Plumbing Permit | Permit required | Not specified |
| Pool Permit | It depends | Portable or manufactured pools or spas less than 24 inches deep do not require a permit; in-ground pools, permanent spas, and portable or manufactured pools or spas 24 inches deep or more require a permit. |
| Roof Replacement Permit | It depends | A permit is required for any reroof work exceeding 25% of the existing roof area within a 12-month period. |
| Solar Permit | Permit required | Not specified |
Shed Permit in other Florida localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not St. Lucie County documents; the office above sets the local rules.
- IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC
- IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC
- Florida Statutes 553.73(10); Florida Building Code, 8th Edition (2023), Section 1609.1
Verified by a person against the sources above on , not confirmed with St. Lucie County Building & Permitting Division (Planning and Development Services). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Permit office
St. Lucie County Building & Permitting Division (Planning and Development Services)
(772) 462-1553Permit portalFlorida rule changes
- Broward County, FL updates building permit fee schedule (Ordinance 2025-038)
Ord. 2025-038 ·
- Florida waives permits for small single-family jobs under $7,500 (HB 803)
ch. 2026-63 (HB 803), F.S. 553.79 ·