Building permits in St. Lucie County, Florida
Of the 10 common home projects we have verified in St. Lucie County, 7 need a permit outright and 3 depend on size or scope. Click any project for the full rule, fee, and how to apply.
- Project types verified
- 10in St. Lucie County
Look up a permit in St. Lucie County
St. Lucie County permit records are public, and you can check a property's permit history online.
How to get a building permit in St. Lucie County
St. Lucie County’s Building & Code Regulation Division issues permits for unincorporated St. Lucie County only. Fort Pierce, Port St. Lucie and St. Lucie Village issue their own: Port St. Lucie’s office is in Building B of the City Hall Complex, 121 SW Port St. Lucie Boulevard. County permits are filed in Citizen Self Service, the county’s Tyler EnerGov portal, unless you are an owner-builder.
Where the office is and when it is open
The main lobby is on the first floor, southwest corner of the County Administration building, 2300 Virginia Avenue, Ft. Pierce. Permitting lists its hours as 8:00 AM to 4:30 PM, Monday through Friday, at (772) 462-1553, with reduced staff from 12:00 Noon until 2:00 p.m. The Building Inspections page gives 8:00 am to 5:00 pm, so arrive before 4:30. The Plan Examiner of the Day answers code questions at (772) 462-1577; inspectors are generally available between 3 p.m. and 4 p.m. Email the Permitting Supervisor, Danielle Williams, at danielle.williams@stlucieco.gov.
Applying online in St. Lucie County
- Register in Citizen Self Service with an email address, then click the link in the confirmation email.
- Click Apply, choose the Permits filter and pick your permit type.
- Add the location from the map or by typing it. If the address is outside unincorporated St. Lucie County, a red note names the city to contact instead.
- Enter a description and the valuation, and list every contact who needs access; no one else can see the permit later.
- Upload the attachments marked required (a locked PDF delays processing), type your name to sign, and submit.
- Pay once the fees are invoiced.
Owner-builders cannot use the online application: you must appear in person and sign. Bring a recorded warranty deed or the property appraiser’s property card in your name, plus the owner-builder (HOB) affidavit.
What five common projects cost here
From the county’s Building Permit Fees schedule, which prints no effective date; it lists amendments through Resolution 2026-39, while the permitting page says the department fee schedule was adopted under Resolution 2026-123. Every permit adds a $5.00 administrative charge and includes 1 inspection trip; each extra trip is $75.00. A non-refundable plan review fee is paid with the application, with a $75.00 minimum for all permit applications (the value-based plan review table excludes the residential list). The schedule also refers to the state surcharge under section 553.721, Florida Statutes, without printing a rate. Paying online costs 3.95% or $2.50, whichever is greater, by card, or $1.50 by eCheck.
- Shed: $75.00 for a shed less than 144 SF; $150.00 over 144 SF. Read 18 Nov 2026.
- Roof replacement: Re-Roof, $250.00. Read 18 Nov 2026.
- Pool: Pool/Spa $450.00; above-ground with an electric sub, $175.00; a Pool/Spa Enclosure, $175.00. A barrier fence built with the pool is a separate fence permit filed with the pool permit. Read 18 Nov 2026.
- Fence: $100.00. Read 18 Nov 2026.
- Patio: no patio line; the schedule prices a Concrete Slab/Driveway at $125.00, a raised wood patio (with decks) at $125.00, and a screen room or sunroom at $150.00. Read 18 Nov 2026.
A revision to approved plans costs $75.00, plus $25.00 for each additional page.
How long review takes
The county’s goal, workload permitting and with complete documents, is a building permit within 14 workdays; minor permits are usually approved within 24 to 48 hours. Reviewer comments come back in the portal, where a blue Resubmit button appears.
Inspections, in order
The required inspections for your job come with the permit placard. To book one, sign in, open My Work, then My Permits, choose the permit and click Request next to the inspection; enter a date and AM or PM (the time is not guaranteed) and submit. A recorded Notice of Commencement, required for work valued at $5,000 or more ($15,000 or more for HVAC), must reach permitting before the first inspection is scheduled. Or call (772) 462-1553, 8:00 a.m. to 4:00 p.m.
Failed inspections cost $75.00 for the first re-inspection, $100.00 for the second and $150.00 for the third and after. Start work and request an inspection within 180 days or the permit expires.
Why applications get sent back
- Any blank: the paper application says all applicable information must be completed to be accepted.
- A pool safety barrier not named in the fence description, which the county says will delay the permit.
- A fence in an easement without a Revocable License Agreement.
- A fence filed without its survey affidavit, a survey or site plan showing it, and the product sheet for fence, gate and latch.
- Resubmittals without a written answer to each reviewer comment (the portal’s blue Respond buttons).
What needs no permit in St. Lucie County
Repairs under $2,500 that do not affect structure, fire ratings or exits, including:
- Fence repairs of less than 2 panels (never a pool barrier fence).
- Sand-set pavers that are not a pool or spa deck and not within 5 feet of a pool.
- Rescreening, painting, tiling, and kitchen cabinets with no plumbing or electrical work.
- A portable pool or spa less than 24 inches deep.
- Like-for-like light fixtures and a toilet replaced in the exact same spot.
Single-family work under $7,500 by the owner or the owner’s contractor, with no structural, mechanical, electrical, plumbing or gas work, with no part in a flood hazard area, may also be exempt, but you must file an exemption application in Citizen Self Service first, with a non-refundable $75.00 processing fee.
If the work already started
The schedule doubles every fee when work starts before the permit, and a Stop Work Order costs $100.00. The FAQ says Contractor Licensing or Code Enforcement issues a notice first, concealed work may need a third-party engineering analysis at your cost, and ignoring it brings a Notice of Violation, fines and a lien. What Florida law says about building without a permit.
Checklist before you apply
- An address in unincorporated St. Lucie County.
- A Citizen Self Service account, or, as owner-builder, a trip to 2300 Virginia Avenue with your deed or property card and HOB affidavit.
- A description and valuation of the work.
- Every contact who needs access, listed on the application.
- Unlocked PDFs of each required attachment.
- A recorded Notice of Commencement at $5,000 or more.
- The plan review fee at submittal and the permit fee once invoiced.
- For a pool: the barrier fence permit filed with the pool permit.
St. Lucie County documents read for this guide
- Office page: Permitting, read
- Office page: Permitting Contacts, read
- Permit portal: Citizen Self Service (Tyler EnerGov), read
- Application: Citizen Self Service (CSS) Add a Permit Guide, read
- Fee schedule: St. Lucie County Building Permit Fees, Schedule of Fees, read
- Inspections: Building Inspections, read
- Inspections: How To Schedule an Inspection and Attach a Document to an Inspection in the CSS Portal, read
- Office page: Building FAQ's, read
- Office page: Items Not Requiring a Permit, read
- Application: Building Permit Application, read
- Application: Checklist for Fence Permits, read
- Application: Checklist for Pool Safety Barrier (Fence) Permits, read
- Office page: Citizen Self Service (CSS) Resubmit a Permit Case, read
What needs a permit in St. Lucie County
| Project | Permit needed? | Threshold |
|---|---|---|
| Deck Permit | Permit required | Minor replacement of existing decking (walking surface only) under $1,000 in value, for 1 and 2 family dwellings, does not require a permit; new deck construction, structural work, or higher-value decking replacement requires a permit. |
| Electrical Permit | Permit required | Any size |
| Fence Permit | Permit required | Fence repairs of less than 2 panels, excluding pool barriers, are on the county's list of items not requiring a permit (repairs under $2,500 that do not affect structural integrity, with an exemption application still required for verification); installing a new fence, larger repairs, or any pool barrier fence requires a permit. |
| HVAC Permit | Permit required | Any size |
| Patio Permit | It depends | Sand-set pavers that are not a pool or spa deck and are not within five feet of a pool do not require a permit, for 1 and 2 family dwellings; pavers used as a pool deck, pavers within five feet of a pool, or other patio construction requires a permit. |
| Plumbing Permit | Permit required | Any size |
| Pool Permit | It depends | Portable or manufactured pools or spas less than 24 inches deep do not require a permit; in-ground pools, permanent spas, and portable or manufactured pools or spas 24 inches deep or more require a permit. |
| Roof Replacement Permit | It depends | A permit is required for any reroof work exceeding 25% of the existing roof area within a 12-month period. |
| Shed Permit | Permit required | Any size |
| Solar Permit | Permit required | Any size |
Planning a project in St. Lucie County?
Hire it out
Sponsored
Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.
Compare local contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
Planning several things at once? Check your whole project
Schedule an inspection in St. Lucie County
Permitted work is not finished until it passes inspection. Building inspections are requested online through Citizen Self Service by Tyler EnerGov, or by calling (772) 462-1553, Monday through Friday, 8:00 a.m. to 4:00 p.m.
Schedule or request a St. Lucie County inspection
When the portal will not take the date you need, the office still books by phone: (772) 462-1553.
Checked . If the office has changed its process, report it.
St. Lucie County permit fees compared with nearby Florida localities
| Florida locality | Deck Permit | HVAC Permit | Electrical Permit |
|---|---|---|---|
| St. Lucie County | Not published | Not published | Not published |
| Alachua County | No deck-specific flat fee is published | Flat fee: Res Mechanical Alt/Repair $110.00, per the Building Fee Schedule effective 11/01/2025 | No electrical-specific flat fee is published |
| Brevard County | Not published | See schedule | See schedule |
| Broward County | See schedule | See schedule | Electrical permit is the greater of a $125 minimum base fee or 3.0% of job value; the schedule has the rest |
Each cell is taken from that Florida jurisdiction's own fee schedule; the full wording and source sit on each permit page.
St. Lucie County permit questions, answered from the data
- Do you need a permit in St. Lucie County?
- For most projects, yes. Of the 10 permit types we cover in St. Lucie County, 7 always require a permit (for example a deck permit) and 3 depend on size or scope (a patio permit, for instance). Each St. Lucie County permit type's page states the exact rule and its source.
- How much does a permit cost in St. Lucie County?
- We have not been able to quote a fee from a St. Lucie County schedule for any of the 10 permit types we cover. Fees are set by St. Lucie County Building & Permitting Division (Planning and Development Services); we do not estimate or mark them up.
- Where do you apply for a permit in St. Lucie County?
- St. Lucie County Building & Permitting Division (Planning and Development Services) issues permits in St. Lucie County and has an online permit portal, and takes questions at (772) 462-1553. The St. Lucie County official page and portal are linked in the office section above.
How the St. Lucie County pages were verified. 10 permit types, 4 distinct official sources, most recently checked . Every rule is read from St. Lucie County Building & Permitting Division (Planning and Development Services) or the applicable code and cited on its page; anything we could not confirm for St. Lucie County is marked rather than estimated. How we verify.
Permitting activity in St. Lucie County
In 2025, St. Lucie County authorized permits for 4,008 new residential housing units (3,468 single-family, 540 in multi-family buildings), valued at $1.2B , down from 4,869 the year before. That works out to about 10 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 402,449.