Fence Permit in Des Moines, Iowa
It depends
Sometimes, depending on the project
Before building any chain-link fence taller than 4 feet or any other fence taller than 3 feet.
Issued byCity of Des Moines Development Services Department, Permit and Development Center
By Mario Bailey, verified against official sources
Quick answer
AUTHORITY: the City of Des Moines Permit and Development Center (PDC), part of the Development Services Department, issues residential building, electrical, mechanical and plumbing permits inside Des Moines city limits; neither Polk County nor the State of Iowa issues them there (the city performs its own electrical inspections, so the state electrical program does not apply, see the Electrical row). The city fence FAQ requires a fence permit for any chain-link fence taller than 4 feet and any other fence taller than 3 feet, and Municipal Code Sec. 26-302(a)(2) exempts chain link or wire fences four feet or less and all other fences three feet or less. Zoning limits still apply to exempt fences: 3 feet in a front yard (picket or metal only), 6 feet in side and rear yards, and no chain-link in local historic districts, where a Certificate of Appropriateness is required.
Typical threshold: Height above which a fence needs a permit for fences other than chain-link; chain-link fences need one above 4 feet.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Fence installers usually handle any required permit as part of the job. Compare a few bids before you commit.
Compare fence installer quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before building any chain-link fence taller than 4 feet or any other fence taller than 3 feet.
What a fence permit costs in Des Moines
How to apply in Des Moines
In Des Moines, most residential fences fall under the model code's 7-foot building-permit exemption, so the real approval step is a lightweight zoning or land-use permit built around a simple site plan showing the fence's location, height, and material, checked against setbacks and any corner-lot sight-triangle rule. A fence that will serve as a required swimming-pool barrier is the exception, since barrier fences carry life-safety requirements of their own.
What most fence permit applications include:
- For Des Moines, a fence 7 feet or under is exempt from the model code's building permit, the same threshold the IRC uses for other small projects (IRC 2021 R105.2).
- That exemption only removes the building-code permit. It does not authorize skipping a jurisdiction's own zoning approval, which is why an exempt fence can still need its own land-use or zoning permit rather than a building permit (IRC 2021 R105.2).
- Whatever your jurisdiction calls that approval, the application centers on a basic site plan: a drawing of the property showing the fence's location, height, and material, and how it relates to the property lines (common local zoning practice).
- For Des Moines, the same plan is checked against required setbacks and, on corner lots or near intersections, a sight-triangle rule that caps fence height so it does not block sightlines for drivers (common local zoning practice).
- For Des Moines, a fence that will serve as a required swimming-pool barrier is handled as life-safety work rather than the light zoning process, and at least one state's adopted residential code requires a building permit for barrier fences regardless of the general fence exemption (Oregon Residential Specialty Code 2021, R101.2.2).
General submittal guidance from International Residential Code (IRC), 2021 edition, Section R105.2. Source. City of Des Moines Development Services Department, Permit and Development Center sets the exact checklist for Des Moines.
Where to apply in Des Moines:
City of Des Moines Development Services Department, Permit and Development Center
- T.M. Franklin Cownie City Administration Building (City Hall), 1200 Locust St., Des Moines, IA 50309
- Phone: 515-283-4200
- Email: permits@dmgov.org
Inspections and closing out your permit
In Des Moines, inspection follows the permit: a fence that never needed one gets no inspection at all under the model code, and a permitted fence typically gets a single final check rather than the staged inspections used for a house. The exception is a fence serving as a swimming-pool barrier, which gets its own dedicated barrier inspection covering height, gaps, and gate hardware.
- In Des Moines: inspection duty attaches only to work for which a permit is required, so a fence that qualified for the permit exemption carries no inspection obligation under the model code (IRC 2021 R109.1).
- In Des Moines: where a fence permit was issued, the process skips the staged foundation, frame, and rough-in inspections used for buildings and goes straight to one final inspection once the fence is finished (IRC 2021 R109.1.6).
- In Des Moines: that single check is typically a zoning compliance inspection rather than a structural review, confirming the fence matches the approved height and site plan (common local practice).
- A fence built as a swimming-pool barrier breaks that light-touch pattern in Des Moines: it is separately inspected for barrier compliance, commonly required before the pool itself can be signed off (ISPSC 305; local pool-barrier inspection programs).
- In Des Moines: that barrier inspection checks dimensional rules from the swimming pool and spa code rather than ordinary fence rules, including the minimum 48 inch barrier height and limits on openings and gaps a young child could pass through (ISPSC 305).
- Gate hardware is inspected too in Des Moines: a self-closing, self-latching gate is part of the barrier requirement, since an unlatched gate defeats the fence's purpose as a barrier (ISPSC 305).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Des Moines permit portal or by phone at 515-283-4200.
Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109, and ISPSC 2021 Section 305 (barriers). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Fence Permit checklist for Des Moines
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: Height above which a fence needs a permit for fences other than chain-link; chain-link fences need one above 4 feet. Usually needed: Before building any chain-link fence taller than 4 feet or any other fence taller than 3 feet.
- Budget the fee. Fence permits fall under the residential line "Decks, fences, retaining walls, swimming pools, hot tubs, and other accessory structures: $77.25" (City of Des Moines PDC Permit Fee Schedule, "New Fees 1-1-26"). Official fee schedule.
- Apply. In Des Moines, most residential fences fall under the model code's 7-foot building-permit exemption, so the real approval step is a lightweight zoning or land-use permit built around a simple site plan showing the fence's location, height, and material, checked against setbacks and any corner-lot sight-triangle rule. A fence that will serve as a required swimming-pool barrier is the exception, since barrier fences carry life-safety requirements of their own. Start at the Des Moines permit portal.
- Keep the office details handy. City of Des Moines Development Services Department, Permit and Development Center. Phone: 515-283-4200. Address: T.M. Franklin Cownie City Administration Building (City Hall), 1200 Locust St., Des Moines, IA 50309.
- Plan for inspections. In Des Moines, inspection follows the permit: a fence that never needed one gets no inspection at all under the model code, and a permitted fence typically gets a single final check rather than the staged inspections used for a house. The exception is a fence serving as a swimming-pool barrier, which gets its own dedicated barrier inspection covering height, gaps, and gate hardware.
Compiled from the official sources on this page. Last checked .
Permitting activity in Des Moines
In 2025, Des Moines authorized permits for 1,676 new residential housing units (221 single-family, 1,455 in multi-family buildings), valued at $410M, up from 618 the year before. That works out to about 7.9 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 212,082.
Frequently asked questions
- Do you need a fence permit in Des Moines?
- AUTHORITY: the City of Des Moines Permit and Development Center (PDC), part of the Development Services Department, issues residential building, electrical, mechanical and plumbing permits inside Des Moines city limits; neither Polk County nor the State of Iowa issues them there (the city performs its own electrical inspections, so the state electrical program does not apply, see the Electrical row). The city fence FAQ requires a fence permit for any chain-link fence taller than 4 feet and any other fence taller than 3 feet, and Municipal Code Sec. 26-302(a)(2) exempts chain link or wire fences four feet or less and all other fences three feet or less. Zoning limits still apply to exempt fences: 3 feet in a front yard (picket or metal only), 6 feet in side and rear yards, and no chain-link in local historic districts, where a Certificate of Appropriateness is required. Height above which a fence needs a permit for fences other than chain-link; chain-link fences need one above 4 feet. Always confirm with the office before starting.
- How much does a fence permit cost in Des Moines?
- Fence permits fall under the residential line "Decks, fences, retaining walls, swimming pools, hot tubs, and other accessory structures: $77.25" (City of Des Moines PDC Permit Fee Schedule, "New Fees 1-1-26"). See the official fee schedule for current amounts.
- How long does a fence permit take in Des Moines?
- In Des Moines, a fence permit typically takes 7 to 10 days (the fence page says "Applications can take 7–10 days to process."). Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for a fence permit in Des Moines?
- You can apply through the Des Moines permit portal or contact the City of Des Moines Development Services Department, Permit and Development Center directly. The links are listed on this page.
- Can a homeowner pull a fence permit themselves in Des Moines?
- Under Iowa law (Iowa Code 103.22(7); 105.11(3); 91C.1(1)(a); 103A.19(1)): Yes, with limits. The electrical licensing law does not stop an owner from doing electrical work on their own principal residence, or require a license, if the home is an existing dwelling rather than new construction, is no larger than a single-family dwelling, is not an attached apartment, and qualifies for the homestead tax credit (103.22(7)). The plumbing and mechanical licensing law has the same owner exemption for an existing single-family principal residence or farm property, also tied to the homestead credit (105.11(3)). A person working on their own property is not a contractor and need not register (91C.1). Building permit applications under the state code must be signed by the owner or the owner's authorized agent (103A.19(1)); whether an owner may pull a local building permit is otherwise set by the city or county. No state owner-builder disclosure form or resale restriction was found. Confirm how Des Moines applies this before you apply.
From the Library
What else needs a permit in Des Moines
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | When the remodel removes and replaces finishes on an entire wall or ceiling, alters... | "Renovations to dwellings: $154.50" for the building permit, plus $77.25 each for... |
| Deck Permit | Permit required | Any size | ...retaining walls, swimming pools, hot tubs, and other accessory structures: $77.25"... |
| Electrical Permit | Permit required | Any size | ...alterations and additions to existing dwellings and accessory structures:... |
| EV Charger Permit | Permit required | Any size | ...alterations and additions to existing dwellings and accessory structures: $77.25"... |
| HVAC Permit | Permit required | Any size | ...alterations and additions to existing dwellings and accessory structures:... |
| Plumbing Permit | Permit required | Any size | ...alterations and additions to existing dwellings and accessory structures:... |
| Pool Permit | Permit required | Any size | ...retaining walls, swimming pools, hot tubs, and other accessory structures: $77.25"... |
| Roof Replacement Permit | It depends | Today: only when roof sheathing, decking or framing (rafters) is repaired or replaced | ...residential building permit lines (for example "Renovations to dwellings: $154.50")... |
| Shed Permit | It depends | Floor area of a one-story detached storage shed, playhouse or similar accessory building | "New detached sheds and garages: $180.25" (City of Des Moines PDC Permit Fee Schedule... |
| Solar Permit | Permit required | Any size | ...alterations and additions to existing dwellings and accessory structures: $77.25"... |
| Water Heater Permit | Permit required | Any size | ...alterations and additions to existing dwellings and accessory structures: $77.25"... |
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Des Moines documents; the office above sets the local rules.
How this fence permit page for Des Moines was verified. 2 official sources: dsm.city, dsm.city; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Des Moines Development Services Department, Permit and Development Center. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page