Permit required

Yes, a permit is required

Before any electrical work, new equipment or wiring change, other than wiring of 50 volts or less.

Confirmed on official page Verified

Issued byCity of Des Moines Development Services Department, Permit and Development Center

By Mario Bailey, verified against official sources

Quick answer

AUTHORITY: the City of Des Moines, not the Iowa Electrical Examining Board, issues and inspects electrical permits inside the city. Iowa Code 103.24(2) says state inspection does not apply in a political subdivision that adopts electrical standards and provides its own certified inspection, and Des Moines does both (Sec. 26-400 adopts the State Electrical Code; Sec. 26-401 requires a PDC permit for any electrical work). Service upgrades and panel change-outs must be done by state-licensed electrical contractors and permitted and inspected by the city; a homeowner may pull branch-circuit permits after obtaining a homeowner's electrical permit.

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

Before any electrical work, new equipment or wiring change, other than wiring of 50 volts or less.

What an electrical permit costs in Des Moines

Line item
electrical permitBy formula"Electrical permit for electrical installations associated with alterations and additions to existing dwellings and accessory structures: $77.25"; new dwellings $231.75 including temporary power pole (City of Des Moines PDC Permit Fee Schedule, "New Fees 1-1-26").
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Des Moines

In Des Moines, in most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.

What most electrical permit applications include:

  • Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
  • For Des Moines, the written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
  • For Des Moines, the application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
  • Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
  • Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).

General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. City of Des Moines Development Services Department, Permit and Development Center sets the exact checklist for Des Moines.

Where to apply in Des Moines:

City of Des Moines Development Services Department, Permit and Development Center

  • T.M. Franklin Cownie City Administration Building (City Hall), 1200 Locust St., Des Moines, IA 50309
  • Phone: 515-283-4200
  • Email: permits@dmgov.org

Inspections and closing out your permit

In Des Moines, electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.

  1. In Des Moines: a rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
  2. In Des Moines: the framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
  3. In Des Moines: ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
  4. In Des Moines: arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
  5. In Des Moines: panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
  6. In Des Moines: the service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
  7. In Des Moines: a final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Des Moines permit portal or by phone at 515-283-4200.

Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.

Permitting activity in Des Moines

In 2025, Des Moines authorized permits for 1,676 new residential housing units (221 single-family, 1,455 in multi-family buildings), valued at $410M, up from 618 the year before. That works out to about 7.9 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 212,082.

Frequently asked questions

Do you need an electrical permit in Des Moines?
AUTHORITY: the City of Des Moines, not the Iowa Electrical Examining Board, issues and inspects electrical permits inside the city. Iowa Code 103.24(2) says state inspection does not apply in a political subdivision that adopts electrical standards and provides its own certified inspection, and Des Moines does both (Sec. 26-400 adopts the State Electrical Code; Sec. 26-401 requires a PDC permit for any electrical work). Service upgrades and panel change-outs must be done by state-licensed electrical contractors and permitted and inspected by the city; a homeowner may pull branch-circuit permits after obtaining a homeowner's electrical permit. Always confirm with the City of Des Moines Development Services Department, Permit and Development Center before starting.
How much does an electrical permit cost in Des Moines?
"Electrical permit for electrical installations associated with alterations and additions to existing dwellings and accessory structures: $77.25"; new dwellings $231.75 including temporary power pole (City of Des Moines PDC Permit Fee Schedule, "New Fees 1-1-26"). See the official fee schedule for current amounts.
Where do you apply for an electrical permit in Des Moines?
You can apply through the Des Moines permit portal or contact the City of Des Moines Development Services Department, Permit and Development Center directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in Des Moines?
Under Iowa law (Iowa Code 103.22(7); 105.11(3); 91C.1(1)(a); 103A.19(1)): Yes, with limits. The electrical licensing law does not stop an owner from doing electrical work on their own principal residence, or require a license, if the home is an existing dwelling rather than new construction, is no larger than a single-family dwelling, is not an attached apartment, and qualifies for the homestead tax credit (103.22(7)). The plumbing and mechanical licensing law has the same owner exemption for an existing single-family principal residence or farm property, also tied to the homestead credit (105.11(3)). A person working on their own property is not a contractor and need not register (91C.1). Building permit applications under the state code must be signed by the owner or the owner's authorized agent (103A.19(1)); whether an owner may pull a local building permit is otherwise set by the city or county. No state owner-builder disclosure form or resale restriction was found. Confirm how Des Moines applies this before you apply.

From the Library

What else needs a permit in Des Moines

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsWhen the remodel removes and replaces finishes on an entire wall or ceiling, alters..."Renovations to dwellings: $154.50" for the building permit, plus $77.25 each for...
Deck PermitPermit requiredAny size...retaining walls, swimming pools, hot tubs, and other accessory structures: $77.25"...
EV Charger PermitPermit requiredAny size...alterations and additions to existing dwellings and accessory structures: $77.25"...
Fence PermitIt dependsHeight above which a fence needs a permit for fences other than chain-link; chain-link fences need one above 4 feet...retaining walls, swimming pools, hot tubs, and other accessory structures: $77.25"...
HVAC PermitPermit requiredAny size...alterations and additions to existing dwellings and accessory structures:...
Plumbing PermitPermit requiredAny size...alterations and additions to existing dwellings and accessory structures:...
Pool PermitPermit requiredAny size...retaining walls, swimming pools, hot tubs, and other accessory structures: $77.25"...
Roof Replacement PermitIt dependsToday: only when roof sheathing, decking or framing (rafters) is repaired or replaced...residential building permit lines (for example "Renovations to dwellings: $154.50")...
Shed PermitIt dependsFloor area of a one-story detached storage shed, playhouse or similar accessory building"New detached sheds and garages: $180.25" (City of Des Moines PDC Permit Fee Schedule...
Solar PermitPermit requiredAny size...alterations and additions to existing dwellings and accessory structures: $77.25"...
Water Heater PermitPermit requiredAny size...alterations and additions to existing dwellings and accessory structures: $77.25"...

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Des Moines documents; the office above sets the local rules.

How this electrical permit page for Des Moines was verified. 2 official sources: dsm.city, library.municode.com; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Des Moines Development Services Department, Permit and Development Center. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Electrical Permit requirements across Iowa localities

Electrical permit rules nationwide

Look up an existing Des Moines permit record

Permit required
Get quotes