Water Heater Permit in Des Moines, Iowa
Permit required
Yes, a permit is required
Before installing or replacing any water heater, gas or electric, tank or tankless.
Issued byCity of Des Moines Development Services Department, Permit and Development Center
By Mario Bailey, verified against official sources
Quick answer
The city water heater handout tells owners to obtain a permit for the water heater installation and then schedule an inspection when the work is complete. Homeowners can pull the permit for their own residence; otherwise a state-licensed plumbing or mechanical contractor is required. Gas units carry extra rules: black iron gas drops (no CSST), bonding of existing CSST, combustion air of 50 cubic feet per 1,000 Btu input, and specific vent clearances.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Plumbers usually pull this permit as part of the replacement. If yours failed and you are choosing a plumber under time pressure, comparing a couple of quotes still pays.
Compare plumber quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before installing or replacing any water heater, gas or electric, tank or tankless.
What a water heater permit costs in Des Moines
How to apply in Des Moines
In Des Moines, replacing a residential water heater needs a permit before work starts, because swapping the appliance counts as installing regulated plumbing and fuel gas work, not an exempt repair. The application itself stays light: it identifies the work and its location, and most offices only ask for extra fuel or capacity details when the replacement changes fuel type or input size.
What most water heater permit applications include:
- For Des Moines, a permit must be obtained before an owner or contractor installs, alters, or replaces any plumbing, fuel gas, or electrical system regulated by the code, which covers putting in a new water heater (IRC R105.1).
- Water heater replacement is not on the code's short list of exempt plumbing work, and replacing defective piping with new material is expressly defined as new work that needs a permit and inspection (IRC R105.2).
- For Des Moines, the application itself only has to identify and describe the work and describe the location of the building or work, which is why most offices can process a water heater permit as a short form rather than a full plan set (IRC R105.3).
- Once a complete application is on file, the building official must act on it and issue the permit as soon as practicable if the proposed work conforms to code, which is the basis for the same-day or next-business-day turnaround many permit offices offer for a straight swap (IRC R105.3.1).
- For Des Moines, the permit only stays valid if the work starts within the code's default window before it lapses, so scheduling the replacement and its inspection soon after the permit issues matters (IRC R105.5).
General submittal guidance from 2021 International Residential Code (IRC), Chapter 1, Section R105 (Permits). Source. City of Des Moines Development Services Department, Permit and Development Center sets the exact checklist for Des Moines.
Where to apply in Des Moines:
City of Des Moines Development Services Department, Permit and Development Center
- T.M. Franklin Cownie City Administration Building (City Hall), 1200 Locust St., Des Moines, IA 50309
- Phone: 515-283-4200
- Email: permits@dmgov.org
Inspections and closing out your permit
In Des Moines, a water heater swap normally draws one inspection, a final, since the work is exposed rather than buried behind new framing. That single visit confirms the relief valve and its discharge pipe, thermal expansion control and seismic strapping where the installation requires them, and, on gas units, adequate combustion air and an approved vent connection.
- In Des Moines: the lifecycle has one required visit, the final inspection, made after the permitted work is complete and before the water heater goes into service; because a straight swap conceals nothing behind framing, offices typically do not schedule a separate rough-in visit for it (IRC R109.1.6).
- In Des Moines: the inspector confirms the water heater is protected by either a separate pressure relief valve and temperature relief valve, or one combination valve rated for the appliance (IRC P2804.1).
- In Des Moines: the relief valve's discharge pipe is checked for an unobstructed, un-trapped gravity path that ends through an air gap no more than 6 inches above the floor or pan, since a wrong discharge pipe is one of the most common reasons a water heater fails inspection (IRC P2804.6.1).
- In Des Moines: where the water heater feeds a closed system, for instance behind a backflow preventer or check valve, the inspector looks for a thermal expansion control device sized to absorb the resulting pressure increase (IRC P2903.4.2).
- In Des Moines: on a gas-fired unit, the inspector verifies the space provides enough combustion air, sized at 50 cubic feet per 1,000 Btu per hour of the appliance's input rating unless an engineered alternative method is used (IRC G2407.5.1).
- In Des Moines: the gas unit's vent must tie into an approved venting system, which the inspector checks along with the vent's physical connections and support (IRC G2427.1, G2427.2).
- In Des Moines: where site conditions call for them, the inspector also checks for a drain pan under a tank whose leakage would cause damage, and for seismic strapping in the upper and lower thirds of the tank in the seismic design categories and townhouse conditions where the code requires it (IRC P2801.6; P2801.8).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Des Moines permit portal or by phone at 515-283-4200.
Inspection sequence from 2021 International Residential Code (IRC), Chapters 24, 28, and 29 (Fuel Gas; Water Heaters; Water Supply and Distribution). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Water Heater Permit checklist for Des Moines
- Confirm the requirement. Yes, a permit is required. Usually needed: Before installing or replacing any water heater, gas or electric, tank or tankless.
- Budget the fee. The 1-1-26 schedule has no water-heater-specific residential line; residential replacements fall under "Plumbing permit for plumbing installations associated with alterations and additions to existing dwellings and accessory structures: $77.25" (City of Des Moines PDC Permit Fee Schedule, "New Fees 1-1-26"). Official fee schedule.
- Apply. In Des Moines, replacing a residential water heater needs a permit before work starts, because swapping the appliance counts as installing regulated plumbing and fuel gas work, not an exempt repair. The application itself stays light: it identifies the work and its location, and most offices only ask for extra fuel or capacity details when the replacement changes fuel type or input size. Start at the Des Moines permit portal.
- Keep the office details handy. City of Des Moines Development Services Department, Permit and Development Center. Phone: 515-283-4200. Address: T.M. Franklin Cownie City Administration Building (City Hall), 1200 Locust St., Des Moines, IA 50309.
- Plan for inspections. In Des Moines, a water heater swap normally draws one inspection, a final, since the work is exposed rather than buried behind new framing. That single visit confirms the relief valve and its discharge pipe, thermal expansion control and seismic strapping where the installation requires them, and, on gas units, adequate combustion air and an approved vent connection.
Compiled from the official sources on this page. Last checked .
Permitting activity in Des Moines
In 2025, Des Moines authorized permits for 1,676 new residential housing units (221 single-family, 1,455 in multi-family buildings), valued at $410M, up from 618 the year before. That works out to about 7.9 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 212,082.
Frequently asked questions
- Do you need a water heater permit in Des Moines?
- The city water heater handout tells owners to obtain a permit for the water heater installation and then schedule an inspection when the work is complete. Homeowners can pull the permit for their own residence; otherwise a state-licensed plumbing or mechanical contractor is required. Gas units carry extra rules: black iron gas drops (no CSST), bonding of existing CSST, combustion air of 50 cubic feet per 1,000 Btu input, and specific vent clearances. Always confirm with the City of Des Moines Development Services Department, Permit and Development Center before starting.
- How much does a water heater permit cost in Des Moines?
- The 1-1-26 schedule has no water-heater-specific residential line; residential replacements fall under "Plumbing permit for plumbing installations associated with alterations and additions to existing dwellings and accessory structures: $77.25" (City of Des Moines PDC Permit Fee Schedule, "New Fees 1-1-26"). See the official fee schedule for current amounts.
- Where do you apply for a water heater permit in Des Moines?
- You can apply through the Des Moines permit portal or contact the City of Des Moines Development Services Department, Permit and Development Center directly. The links are listed on this page.
- Can a homeowner pull a water heater permit themselves in Des Moines?
- Under Iowa law (Iowa Code 103.22(7); 105.11(3); 91C.1(1)(a); 103A.19(1)): Yes, with limits. The electrical licensing law does not stop an owner from doing electrical work on their own principal residence, or require a license, if the home is an existing dwelling rather than new construction, is no larger than a single-family dwelling, is not an attached apartment, and qualifies for the homestead tax credit (103.22(7)). The plumbing and mechanical licensing law has the same owner exemption for an existing single-family principal residence or farm property, also tied to the homestead credit (105.11(3)). A person working on their own property is not a contractor and need not register (91C.1). Building permit applications under the state code must be signed by the owner or the owner's authorized agent (103A.19(1)); whether an owner may pull a local building permit is otherwise set by the city or county. No state owner-builder disclosure form or resale restriction was found. Confirm how Des Moines applies this before you apply.
From the Library
What else needs a permit in Des Moines
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | When the remodel removes and replaces finishes on an entire wall or ceiling, alters... | "Renovations to dwellings: $154.50" for the building permit, plus $77.25 each for... |
| Deck Permit | Permit required | Any size | ...retaining walls, swimming pools, hot tubs, and other accessory structures: $77.25"... |
| Electrical Permit | Permit required | Any size | ...alterations and additions to existing dwellings and accessory structures:... |
| EV Charger Permit | Permit required | Any size | ...alterations and additions to existing dwellings and accessory structures: $77.25"... |
| Fence Permit | It depends | Height above which a fence needs a permit for fences other than chain-link; chain-link fences need one above 4 feet | ...retaining walls, swimming pools, hot tubs, and other accessory structures: $77.25"... |
| HVAC Permit | Permit required | Any size | ...alterations and additions to existing dwellings and accessory structures:... |
| Plumbing Permit | Permit required | Any size | ...alterations and additions to existing dwellings and accessory structures:... |
| Pool Permit | Permit required | Any size | ...retaining walls, swimming pools, hot tubs, and other accessory structures: $77.25"... |
| Roof Replacement Permit | It depends | Today: only when roof sheathing, decking or framing (rafters) is repaired or replaced | ...residential building permit lines (for example "Renovations to dwellings: $154.50")... |
| Shed Permit | It depends | Floor area of a one-story detached storage shed, playhouse or similar accessory building | "New detached sheds and garages: $180.25" (City of Des Moines PDC Permit Fee Schedule... |
| Solar Permit | Permit required | Any size | ...alterations and additions to existing dwellings and accessory structures: $77.25"... |
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Des Moines documents; the office above sets the local rules.
How this water heater permit page for Des Moines was verified. 2 official sources: dsm.city, dsm.city; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Des Moines Development Services Department, Permit and Development Center. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Water Heater Permit requirements across Iowa localities