Deck Permit in Des Moines, Iowa
Permit required
Yes, a permit is required
Before building any deck; apply on the Customer Self Service portal as a "Residential Other Building Permit".
Issued byCity of Des Moines Development Services Department, Permit and Development Center
By Mario Bailey, verified against official sources
Quick answer
Des Moines has no size or height exemption for decks: the city deleted the IRC exemption list (IRC R105.2) and its own exemption list, Municipal Code Sec. 26-302, does not name decks. The city deck handout directs every deck permit application through the Customer Self Service portal and requires footing, framing and final inspections. Replacing deck boards on an existing open wood deck is exempt as minor repair.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds your deck, they usually handle the permit as part of the job. Compare a few bids before you commit.
Compare deck contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before building any deck; apply on the Customer Self Service portal as a "Residential Other Building Permit".
What a deck permit costs in Des Moines
How to apply in Des Moines
In Des Moines, a residential deck permit application is a set of construction documents that show what will be built and prove it meets the IRC deck provisions. In practice that means a scaled site plan locating the deck and its setbacks, plus deck plans and structural details covering the footings, posts, beams, joists, ledger, guards, and stairs.
What most deck permit applications include:
- For Des Moines, a permit application identifying the work, the deck's size (square footage), and whether electrical work such as lights or receptacles is included, submitted for plan review before construction begins (IRC R106).
- For Des Moines, a scaled site plan (for example 1/4 inch to 1 foot) showing the new deck's location relative to the house, its overall length and width, and dimensioned distances from the deck to all property lines and other structures so required setbacks can be verified (IRC R106.1.1).
- For Des Moines, a deck plan drawn to scale showing overall dimensions and the framing layout: joist size, spacing, span, and species; beam size and span; post size and height; and footing or pier size and depth (IRC R507.4 posts, R507.5 beams, R507.6 joists, R507.3 footings).
- For Des Moines, a section or side elevation with connection details showing the ledger attachment to the house band joist with flashing, the fastener or bolt schedule, joist hangers, post-to-beam and post-to-footing connections, and the required lateral load connection (IRC R507.9 ledger connection, R507.9.2 lateral connection, R507.2.4 flashing).
- Footing sizing derived from tributary area, the soil bearing value, and design loads per IRC Table R507.3.1, with footings shown bearing on undisturbed soil at the frost depth required by the jurisdiction (IRC R507.3).
- Details for the guards required where the walking surface is more than 30 inches above grade, and for the stairs and handrails, showing guard height and opening limits, stair riser and tread dimensions, and handrail location (IRC R312 guards, R311.7 stairs and handrails).
- For designs that fall outside the prescriptive R507 tables (for example multi-story or stacked decks, or a ledger attached to a cantilever), engineered and stamped structural plans are submitted in place of the prescriptive details (IRC R507.1 and R301).
General submittal guidance from IRC R106.1.1 (construction documents) and IRC R507 (exterior decks), 2021 IRC. Source. City of Des Moines Development Services Department, Permit and Development Center sets the exact checklist for Des Moines.
Where to apply in Des Moines:
City of Des Moines Development Services Department, Permit and Development Center
- T.M. Franklin Cownie City Administration Building (City Hall), 1200 Locust St., Des Moines, IA 50309
- Phone: 515-283-4200
- Email: permits@dmgov.org
Inspections and closing out your permit
In Des Moines, deck work is inspected in sequence as it is built: the footings before concrete is placed, the framing before the decking boards go down, and a final inspection once the deck is complete. Each stage checks the items that would be hidden or unsafe if missed.
- Footing or pier inspection in Des Moines: after the holes are dug and any forms or reinforcing are set but before concrete is placed, the inspector checks footing depth and diameter, a flat undisturbed bearing surface, and that the holes are free of water (IRC R109.1.1 foundation inspection; R507.3 footings).
- Framing inspection in Des Moines: after the deck is framed but before the decking conceals it, the inspector verifies the ledger attachment and its flashing, the fastener and bolt schedule, joist hangers and metal connectors, post-to-beam and post-to-footing connections, and the lateral load connection; call it before decking is installed (IRC R109.1.4 frame inspection; R507.9 ledger and flashing).
- Final inspection in Des Moines: after the deck is complete and before it is used, the inspector confirms guard height and opening limits (a 4 inch sphere must not pass, 4 3/8 inch at stairs), stair riser and tread dimensions, handrail height and graspability where there are 4 or more risers, stair landings, and required stair lighting (IRC R109.1.6 final inspection; R312 guards, R311.7 stairs and handrails).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Des Moines permit portal or by phone at 515-283-4200.
Inspection sequence from IRC R109 (inspections: R109.1.1 footing before concrete, R109.1.4 frame, R109.1.6 final), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Deck Permit checklist for Des Moines
- Confirm the requirement. Yes, a permit is required. Usually needed: Before building any deck; apply on the Customer Self Service portal as a "Residential Other Building Permit".
- Budget the fee. "Decks, fences, retaining walls, swimming pools, hot tubs, and other accessory structures: $77.25" (City of Des Moines PDC Permit Fee Schedule, "New Fees 1-1-26"). Official fee schedule.
- Apply. In Des Moines, a residential deck permit application is a set of construction documents that show what will be built and prove it meets the IRC deck provisions. In practice that means a scaled site plan locating the deck and its setbacks, plus deck plans and structural details covering the footings, posts, beams, joists, ledger, guards, and stairs. Start at the Des Moines permit portal.
- Keep the office details handy. City of Des Moines Development Services Department, Permit and Development Center. Phone: 515-283-4200. Address: T.M. Franklin Cownie City Administration Building (City Hall), 1200 Locust St., Des Moines, IA 50309.
- Plan for inspections. In Des Moines, deck work is inspected in sequence as it is built: the footings before concrete is placed, the framing before the decking boards go down, and a final inspection once the deck is complete. Each stage checks the items that would be hidden or unsafe if missed.
Compiled from the official sources on this page. Last checked .
Permitting activity in Des Moines
In 2025, Des Moines authorized permits for 1,676 new residential housing units (221 single-family, 1,455 in multi-family buildings), valued at $410M, up from 618 the year before. That works out to about 7.9 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 212,082.
Frequently asked questions
- Do you need a deck permit in Des Moines?
- Des Moines has no size or height exemption for decks: the city deleted the IRC exemption list (IRC R105.2) and its own exemption list, Municipal Code Sec. 26-302, does not name decks. The city deck handout directs every deck permit application through the Customer Self Service portal and requires footing, framing and final inspections. Replacing deck boards on an existing open wood deck is exempt as minor repair. Always confirm with the City of Des Moines Development Services Department, Permit and Development Center before starting.
- How much does a deck permit cost in Des Moines?
- "Decks, fences, retaining walls, swimming pools, hot tubs, and other accessory structures: $77.25" (City of Des Moines PDC Permit Fee Schedule, "New Fees 1-1-26"). See the official fee schedule for current amounts.
- Where do you apply for a deck permit in Des Moines?
- You can apply through the Des Moines permit portal or contact the City of Des Moines Development Services Department, Permit and Development Center directly. The links are listed on this page.
- Can a homeowner pull a deck permit themselves in Des Moines?
- Under Iowa law (Iowa Code 103.22(7); 105.11(3); 91C.1(1)(a); 103A.19(1)): Yes, with limits. The electrical licensing law does not stop an owner from doing electrical work on their own principal residence, or require a license, if the home is an existing dwelling rather than new construction, is no larger than a single-family dwelling, is not an attached apartment, and qualifies for the homestead tax credit (103.22(7)). The plumbing and mechanical licensing law has the same owner exemption for an existing single-family principal residence or farm property, also tied to the homestead credit (105.11(3)). A person working on their own property is not a contractor and need not register (91C.1). Building permit applications under the state code must be signed by the owner or the owner's authorized agent (103A.19(1)); whether an owner may pull a local building permit is otherwise set by the city or county. No state owner-builder disclosure form or resale restriction was found. Confirm how Des Moines applies this before you apply.
From the Library
What else needs a permit in Des Moines
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | When the remodel removes and replaces finishes on an entire wall or ceiling, alters... | "Renovations to dwellings: $154.50" for the building permit, plus $77.25 each for... |
| Electrical Permit | Permit required | Any size | ...alterations and additions to existing dwellings and accessory structures:... |
| EV Charger Permit | Permit required | Any size | ...alterations and additions to existing dwellings and accessory structures: $77.25"... |
| Fence Permit | It depends | Height above which a fence needs a permit for fences other than chain-link; chain-link fences need one above 4 feet | ...retaining walls, swimming pools, hot tubs, and other accessory structures: $77.25"... |
| HVAC Permit | Permit required | Any size | ...alterations and additions to existing dwellings and accessory structures:... |
| Plumbing Permit | Permit required | Any size | ...alterations and additions to existing dwellings and accessory structures:... |
| Pool Permit | Permit required | Any size | ...retaining walls, swimming pools, hot tubs, and other accessory structures: $77.25"... |
| Roof Replacement Permit | It depends | Today: only when roof sheathing, decking or framing (rafters) is repaired or replaced | ...residential building permit lines (for example "Renovations to dwellings: $154.50")... |
| Shed Permit | It depends | Floor area of a one-story detached storage shed, playhouse or similar accessory building | "New detached sheds and garages: $180.25" (City of Des Moines PDC Permit Fee Schedule... |
| Solar Permit | Permit required | Any size | ...alterations and additions to existing dwellings and accessory structures: $77.25"... |
| Water Heater Permit | Permit required | Any size | ...alterations and additions to existing dwellings and accessory structures: $77.25"... |
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Des Moines documents; the office above sets the local rules.
How this deck permit page for Des Moines was verified. 2 official sources: dsm.city, dsm.city; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Des Moines Development Services Department, Permit and Development Center. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page