South Carolina / Charleston

Fence Permit in Charleston, South Carolina

Permit required

Yes, a permit is required

Before putting up a new fence or altering or repairing an existing one, under permit type "Fence - Single Family/Duplex dwelling" with work class "New" or "Alteration/Repair." A Board of Architectural Review application is also required first if the property is in a designated BAR district, and on Daniel Island the private Architectural Review Board must approve before the city will issue.

Confirmed on official page Verified City of Charleston Permit Center, Development and Construction Services (Building Inspections Division)

By Mario Bailey, verified against official sources

Quick answer

These rows describe the rules of the City of Charleston only, a city that spans parts of Charleston and Berkeley counties and includes the peninsula, West Ashley, James Island, Johns Island, Daniel Island and Cainhoy; North Charleston, Mount Pleasant, the Town of James Island, Folly Beach, Sullivan's Island, Isle of Palms and unincorporated Charleston and Berkeley counties run their own permitting and are not covered here. Charleston requires a fence permit for residential fences, and the city lists Fences (Residential and Commercial) among its over-the-counter "Express" permits that can be walked through the Permit Center between 9 a.m. and 4:30 p.m. What changes with size is which division reviews it, not whether a permit is needed: Zoning review is required on every fence permit, and Building Inspections review is added only for fences taller than 7 ft in height above grade. Zoning caps fence height at six feet on residentially zoned property outside a BAR district and seven feet (eight foot piers) inside one.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before putting up a new fence or altering or repairing an existing one, under permit type "Fence - Single Family/Duplex dwelling" with work class "New" or "Alteration/Repair." A Board of Architectural Review application is also required first if the property is in a designated BAR district, and on Daniel Island the private Architectural Review Board must approve before the city will issue.

What a fence permit costs in Charleston

Line item
fence permitBy formulaNo fence line item exists. A fence is billed as a residential alteration or repair under the Building and Trade Permit Fee Schedule, approved by Ordinance Nos. 2017-131, 2019-064 and 2019-072, effective October 1, 2019: a $40.00 non-refundable application fee "required for all building and trade permits," plus a construction-cost based permit fee that is "Application Fee Only" at $1,000 or less of construction cost and "$15.00 for the first $1,000 construction valuation, plus $5.00 for each additional thousand or fraction thereof, to and including $50,000" above that. A plan review fee equal to 50% of the building permit fee applies when valuation exceeds $1,000 and plans must be reviewed. Starting without a permit doubles the money: the schedule's Penalties clause says "Where work for which a permit is required by this code is started or proceeded prior to obtaining said permit, the fees herein specified shall be doubled, but the payment of such double fee shall neither relieve any persons from fully complying with the requirements of this code in the execution of the work nor from any other penalties prescribed herein.".
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Charleston

Most residential fences fall under the model code's 7-foot building-permit exemption, so the real approval step is a lightweight zoning or land-use permit built around a simple site plan showing the fence's location, height, and material, checked against setbacks and any corner-lot sight-triangle rule. A fence that will serve as a required swimming-pool barrier is the exception, since barrier fences carry life-safety requirements of their own.

What most fence permit applications include:

  • A fence 7 feet or under is exempt from the model code's building permit, the same threshold the IRC uses for other small projects (IRC 2021 R105.2).
  • That exemption only removes the building-code permit. It does not authorize skipping a jurisdiction's own zoning approval, which is why an exempt fence can still need its own land-use or zoning permit rather than a building permit (IRC 2021 R105.2).
  • Whatever your jurisdiction calls that approval, the application centers on a basic site plan: a drawing of the property showing the fence's location, height, and material, and how it relates to the property lines (common local zoning practice).
  • The same plan is checked against required setbacks and, on corner lots or near intersections, a sight-triangle rule that caps fence height so it does not block sightlines for drivers (common local zoning practice).
  • A fence that will serve as a required swimming-pool barrier is handled as life-safety work rather than the light zoning process, and at least one state's adopted residential code requires a building permit for barrier fences regardless of the general fence exemption (Oregon Residential Specialty Code 2021, R101.2.2).

General submittal guidance from International Residential Code (IRC), 2021 edition, Section R105.2. Source. City of Charleston Permit Center, Development and Construction Services (Building Inspections Division) sets the exact checklist for Charleston.

Where to apply in Charleston:

City of Charleston Permit Center, Development and Construction Services (Building Inspections Division)

Inspections and closing out your permit

Inspection follows the permit: a fence that never needed one gets no inspection at all under the model code, and a permitted fence typically gets a single final check rather than the staged inspections used for a house. The exception is a fence serving as a swimming-pool barrier, which gets its own dedicated barrier inspection covering height, gaps, and gate hardware.

  1. Inspection duty attaches only to work for which a permit is required, so a fence that qualified for the permit exemption carries no inspection obligation under the model code (IRC 2021 R109.1).
  2. Where a fence permit was issued, the process skips the staged foundation, frame, and rough-in inspections used for buildings and goes straight to one final inspection once the fence is finished (IRC 2021 R109.1.6).
  3. That single check is typically a zoning compliance inspection rather than a structural review, confirming the fence matches the approved height and site plan (common local practice).
  4. A fence built as a swimming-pool barrier breaks that light-touch pattern: it is separately inspected for barrier compliance, commonly required before the pool itself can be signed off (ISPSC 305; local pool-barrier inspection programs).
  5. That barrier inspection checks dimensional rules from the swimming pool and spa code rather than ordinary fence rules, including the minimum 48 inch barrier height and limits on openings and gaps a young child could pass through (ISPSC 305).
  6. Gate hardware is inspected too: a self-closing, self-latching gate is part of the barrier requirement, since an unlatched gate defeats the fence's purpose as a barrier (ISPSC 305).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Charleston permit portal or by phone at 843-577-5550.

Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109, and ISPSC 2021 Section 305 (barriers). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a fence permit in Charleston?
These rows describe the rules of the City of Charleston only, a city that spans parts of Charleston and Berkeley counties and includes the peninsula, West Ashley, James Island, Johns Island, Daniel Island and Cainhoy; North Charleston, Mount Pleasant, the Town of James Island, Folly Beach, Sullivan's Island, Isle of Palms and unincorporated Charleston and Berkeley counties run their own permitting and are not covered here. Charleston requires a fence permit for residential fences, and the city lists Fences (Residential and Commercial) among its over-the-counter "Express" permits that can be walked through the Permit Center between 9 a.m. and 4:30 p.m. What changes with size is which division reviews it, not whether a permit is needed: Zoning review is required on every fence permit, and Building Inspections review is added only for fences taller than 7 ft in height above grade. Zoning caps fence height at six feet on residentially zoned property outside a BAR district and seven feet (eight foot piers) inside one. Always confirm with the City of Charleston Permit Center, Development and Construction Services (Building Inspections Division) before starting.
How much does a fence permit cost in Charleston?
No fence line item exists. A fence is billed as a residential alteration or repair under the Building and Trade Permit Fee Schedule, approved by Ordinance Nos. 2017-131, 2019-064 and 2019-072, effective October 1, 2019: a $40.00 non-refundable application fee "required for all building and trade permits," plus a construction-cost based permit fee that is "Application Fee Only" at $1,000 or less of construction cost and "$15.00 for the first $1,000 construction valuation, plus $5.00 for each additional thousand or fraction thereof, to and including $50,000" above that. A plan review fee equal to 50% of the building permit fee applies when valuation exceeds $1,000 and plans must be reviewed. Starting without a permit doubles the money: the schedule's Penalties clause says "Where work for which a permit is required by this code is started or proceeded prior to obtaining said permit, the fees herein specified shall be doubled, but the payment of such double fee shall neither relieve any persons from fully complying with the requirements of this code in the execution of the work nor from any other penalties prescribed herein.". See the official fee schedule for current amounts.
How long does a fence permit take in Charleston?
Possible same-visit approval. The Permit Center lists Fences (Residential and Commercial) on its "Menu of 'Express' Permits (In Person Only)" that "have the possibility of receiving over-the-counter in-person approval if submitted and walked through the Permit Center from 9 a.m. to 4:30 p.m., however approval is never a guarantee.". Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a fence permit in Charleston?
You can apply through the Charleston permit portal or contact the City of Charleston Permit Center, Development and Construction Services (Building Inspections Division) directly. The links are listed on this page.
Can a homeowner pull a fence permit themselves in Charleston?
Under South Carolina law (S.C. Code Ann. 40-59-260(A), (B), (C), (E), (F); 40-59-265; 40-59-280; 40-59-20(6), (7); 40-59-30(A)): South Carolina licenses residential builders and residential specialty contractors under S.C. Code Title 40 Chapter 59, and 40-59-260 exempts the owner of record who builds for himself. The exemption applies only if the owner does the work himself, with his own employees, or with licensed contractors or registered entities, if the structure is intended for the owner's sole occupancy or occupancy by the owner's family and is not intended for sale or rent, and if the general public does not have access to it. The owner must personally appear and sign the building permit application, and the local permitting agency must hand over a disclosure statement whose statutory text reads in part: You must supervise the construction yourself. You may build or improve a one-family or two-family residence. The building must be for your own use and occupancy. It may not be built for sale or rent. The sale restriction is two years and is a presumption rather than a flat bar: 40-59-260(B) makes proof of sale or rent, or of offering for sale or rent, within two years after completion or issuance of a certificate of occupancy prima facie evidence that the project was undertaken for sale or rent, which forfeits the exemption and exposes the owner to the chapter's penalties. South Carolina then adds a step no other state in this wave has: 40-59-260(E) requires the owner to promptly record a notice with the register of deeds, indexed under the owner's name in the grantor index, stating that the building was constructed by the owner as an unlicensed builder, and failure to record revokes the statutory exemption. The exemption is from the licensing chapter, not from the permit, and 40-59-280 requires the building official to refuse a permit unless the applicant furnishes evidence of licensure, registration, or exemption. Confirm how Charleston applies this before you apply.

From the Library

What else needs a permit in Charleston

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedA $40.00 non-refundable application fee plus a valuation-based building permit fee...
Electrical PermitIt dependsNot specifiedA $40.00 non-refundable application fee, which the schedule says "is in addition to the...
HVAC PermitIt dependsNot specifiedA $40.00 non-refundable application fee, which the schedule states "is in addition to...
Plumbing PermitIt dependsNot specifiedA $40.00 non-refundable application fee, which the schedule says "is in addition to the...
Pool PermitIt dependsprefabricated swimming poolsThe pool guideline says the Application Fee, Plan Review Fee and Building Permit Fee all...
Roof Replacement PermitPermit requiredNot specifiedThe roofing guideline sends all three fees to page 4 of the Building and Trade Permit...
Shed PermitPermit requiredNot specifiedA $40.00 non-refundable application fee plus a valuation-based building permit fee...
Solar PermitPermit requiredNot specifiedTwo permits, two fees.

Fence Permit in other South Carolina localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Charleston documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with City of Charleston Permit Center, Development and Construction Services (Building Inspections Division). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Fence Permit requirements across South Carolina localities

Permit required
Get quotes