South Carolina / Charleston

Pool Permit in Charleston, South Carolina

It depends

Sometimes, depending on the project

Before building an in-ground, above-ground or partially above-ground pool or spa, under permit type "Pool" with work class "Residential." A separate "Electrical - Single Family/Duplex Dwelling" sub-permit is always required for pool and spa equipment, and a "Gas" sub-permit is required if there is a fuel-gas heater.

Quick answer

Charleston requires a "Pool" permit for residential pools and spas, with Building Inspections, Zoning and Engineering review all mandatory, the last verifying utility and drainage easements. The only exemption is the statewide one at S.C. Code 40-59-265, which covers prefabricated swimming pools less than 24 inches deep. Coastal conditions drive the submittal: structural plans must be signed and sealed by a licensed South Carolina structural engineer and must address "design to resistance buoyance (hydrostatic uplift) for regional, high-seasonal water-table and lateral adjacent soil loads," and for pools in flood zones AE, VE or Coastal A the guideline allows filtration and circulation pumps below the Design Flood Elevation only if anchored against flotation and protected against water entry, while "Heaters shall be at or above Design Flood Elevation (DFE)." The barrier is enforced at the end: "The final inspection will not be approved until all barrier requirements are installed to code."

Typical threshold
prefabricated swimming pools
Issued by
City of Charleston Permit Center, Development and Construction Services (Building Inspections Division)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.

Compare pool builder quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a pool permit costs in Charleston

Fee basis
Project valuation
Fee schedule in force
Official scheduleRead .
  • The pool guideline says the Application Fee, Plan Review Fee and Building Permit Fee all come from page 4 of the Building and Trade Permit Fee Schedule, whose construction-cost table covers "ALL SWIMMING POOLS - NEW CONSTRUCTION, ALTERATIONS & REPAIRS."
  • That is a $40.00 non-refundable application fee, a permit fee of "$15.00 for the first $1,000 construction valuation, plus $5.00 for each additional thousand or fraction thereof, to and including $50,000" (then $260.00 plus $4.00 per additional thousand from $50,001 to $100,000), and a plan review fee equal to 50% of the permit fee.
  • Schedule approved by Ordinance Nos. 2017-131, 2019-064 and 2019-072, effective October 1, 2019.
  • Separate $40.00 application fees apply to the electrical and fuel gas sub-permits.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Charleston compares in South Carolina

JurisdictionPermit needed?Threshold
Charlestonthis pageIt dependsprefabricated swimming pools
ColumbiaIt dependspools that are in ground or permanent above ground
Greenville CountyIt dependsprefabricated swimming pools only

How to apply in Charleston

General guide, not specific to this office

What a pool permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a pool permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Charleston Permit Center, Development and Construction Services (Building Inspections Division)

Permitting activity in Charleston

In 2025, Charleston authorized permits for 1,311 new residential housing units (819 single-family, 492 in multi-family buildings), valued at $210M, up from 1,144 the year before. That works out to about 10.1 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 129,814.

What else needs a permit in Charleston

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeA $40.00 non-refundable application fee plus a valuation-based building permit fee; the schedule has the rest
Electrical PermitIt dependsBefore new service for a new building, complete wiring or a complete re-wire, a service...A $40.00 non-refundable application fee; the schedule has the rest
Fence PermitPermit requiredAny sizeSee schedule
HVAC PermitIt dependsBefore a new HVAC system for a new building, a new or upgraded system for an existing...A $40.00 non-refundable application fee; the schedule has the rest
Plumbing PermitIt dependsBefore new service for a new building, adding new fixtures, adding new system piping...A $40.00 non-refundable application fee; the schedule has the rest
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitPermit requiredAny sizeA $40.00 non-refundable application fee plus a valuation-based building permit fee; the schedule has the rest
Solar PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a pool permit in Charleston?
It depends on the project. Prefabricated swimming pools. If you are unsure how that applies to your project, call the permit office at 843-577-5550 before you start.
How much does a pool permit cost in Charleston?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Aug 2026. For the figure on your own project, call the permit office at 843-577-5550.
How long does a pool permit take in Charleston?
Possible same-visit approval in a narrow case. The Permit Center's express menu lists "Pool (Residential) - Not in BAR/DRB," limited to "In-Ground only - no raised pools" and "Not in a flood zone"; anything outside that goes through normal review. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a pool permit in Charleston?
You can apply through the Charleston permit portal or contact the City of Charleston Permit Center, Development and Construction Services (Building Inspections Division) directly. The links are listed on this page.
Can a homeowner pull a pool permit themselves in Charleston?
Under South Carolina law (S.C. Code Ann. 40-59-260(A), (B), (C), (E), (F); 40-59-265; 40-59-280; 40-59-20(6), (7); 40-59-30(A)): South Carolina licenses residential builders and residential specialty contractors under S.C. Code Title 40 Chapter 59, and 40-59-260 exempts the owner of record who builds for himself. The exemption applies only if the owner does the work himself, with his own employees, or with licensed contractors or registered entities, if the structure is intended for the owner's sole occupancy or occupancy by the owner's family and is not intended for sale or rent, and if the general public does not have access to it. The owner must personally appear and sign the building permit application, and the local permitting agency must hand over a disclosure statement whose statutory text reads in part: You must supervise the construction yourself. You may build or improve a one-family or two-family residence. The building must be for your own use and occupancy. It may not be built for sale or rent. The sale restriction is two years and is a presumption rather than a flat bar: 40-59-260(B) makes proof of sale or rent, or of offering for sale or rent, within two years after completion or issuance of a certificate of occupancy prima facie evidence that the project was undertaken for sale or rent, which forfeits the exemption and exposes the owner to the chapter's penalties. South Carolina then adds a step no other state in this wave has: 40-59-260(E) requires the owner to promptly record a notice with the register of deeds, indexed under the owner's name in the grantor index, stating that the building was constructed by the owner as an unlicensed builder, and failure to record revokes the statutory exemption. The exemption is from the licensing chapter, not from the permit, and 40-59-280 requires the building official to refuse a permit unless the applicant furnishes evidence of licensure, registration, or exemption. Confirm how Charleston applies this before you apply.

From the Library

Pool Permit in other South Carolina localities

Everything above, sourced

How this pool permit page for Charleston was verified. 2 official sources: charleston-sc.gov, scstatehouse.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Charleston Permit Center, Development and Construction Services (Building Inspections Division). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project